Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

Home Extensions & Additions Stanmore — Live In, Build On

We extend homes across Stanmore 2048, often while owners stay in place, working to Inner West Council's rules and keeping the house weathertight during the build.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Home extension build rates in Stanmore: Ground floor $2,360–$2,840/m² + GST; first floor $3,790–$4,230/m² + GST (Rawlinsons Sydney). Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Buildana manages design, Inner West Council approvals and construction, with a fixed-price contract once design and scope are set.

Extending Homes in Stanmore

A home extension in Stanmore is restoration-suburb work. It is one of the inner west's great enclaves of intact Victorian terraces — 1880s to 1920s stock on 150 to 400m² blocks under conservation areas covering most streets — and the people here tend to be restorers, so the addition is built backwards with craft to match the standard they hold the front of the house to.

Party walls set the method, the Victorian fabric gets licensed lead and asbestos handling, and the old footings are checked where the new work ties in. A rear rework opened to the courtyard, sometimes with an attic level in the roof form, is the natural move.

An addition beats trading out of a village-scale pocket this quietly premium — the station and the calm are the draw, and building keeps both.

We build these under NSW contractor licence 487805C. Get our extension scope, with the sequencing planned, before you commit.

Buildana manages the complete home extension process in Stanmore — from design consultation and structural engineering through to DA or CDC approval, and construction to handover, with a fixed-price contract once design and scope are set. Extend your home without the stress.

Read our Home Extension Cost Guide 2026 or explore extension approval pathways in NSW.

  • Rawlinsons Sydney rates: ground floor $2,360–$2,840/m² + GST, first floor $3,790–$4,230/m² + GST
  • Inner West Council DA and CDC approvals managed
  • Ground floor, rear and second-storey additions
  • M — structural engineering included
  • 1880s–1920s-era homes assessed for extension suitability
  • Connect new to existing — clean, matched finish
  • 6-year structural warranty
  • Free design consultation — near Stanmore (T2, in suburb) station
Extended family home in Stanmore — R1/R2 General/Low block
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

The restoration suburb grows

Stanmore's terraces extend backwards with craft — kitchen-living opened up, attic levels inside the roof form — with the quiet restoration premium rewarding work done exactly.

The station and village scale hold every metre you add.

Victorian fabric handled

Lead and asbestos come out under licence, and party walls are assessed before any structural move.

The old footings are checked where the addition ties in, and the lot is costed up front.

Home extension builder in Stanmore — key facts

Suburb
Stanmore, NSW 2048
Council / LGA
Inner West Council (Inner West)
Primary zoning
R1/R2 General/Low
Typical lot size
150–400m²
Soil class
M
Home era
1880s–1920s
Typical price range
Ground floor $2,360–$2,840/m² + GST; first floor $3,790–$4,230/m² + GST (Rawlinsons Sydney)
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period
Approval pathway
CDC for most rear extensions, DA for second-storey

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Concept design first — you see the plan before committing
Inner West Council CDC for eligible ground-floor additions — a CDC must be decided within 20 days where neighbours are notified (10 days otherwise)
DA path for second-storey or non-complying designs — a DA has a 40-day assessment period
Construction programmed around liveability — staged weatherproofing
Second-storey works sequenced around the roof tie-in

How It Works

From First Call to Final Key

Free consultation at your Stanmore home. We inspect the existing structure, check Inner West Council's controls, measure available space, and discuss what you need.

⏱

Two design moves are usually on the table: match the existing house so the extension reads as original, or contrast with it so the new section is clearly modern. Both work — choice is aesthetic, and we'll show 3D renders of both before you commit.

⏱

CDC or DA through Inner West Council depending on scope. Structural engineering, BASIX, and all documentation prepared and lodged.

⏱

Construction phase connects new to existing — footings, frame, roof tie-in, waterproofing at junction, internal fit-out and external finish. Staged works minimise disruption to your daily routine in Stanmore.

⏱

Final inspection focuses on the integration: paint blend, flooring transitions, ceiling height, junction waterproofing, sound transmission. The extension shouldn't feel bolted on — it should feel like the house was always meant to be this size.

⏱

Quality Promise

We extend Stanmore homes with a structural engineer on every job. Second storey, rear addition, multi-room — engineered and priced upfront.

Fixed-price contract once design and scope are setNCC 2025 and BASIX compliantFull Inner West Council complianceMatched old-to-new connectionWeekly progress updates6-year structural warranty

Cost Guide

ItemEstimated Range
Adding a master suite (1880s–1920s Stanmore home)$2,360–$2,840/m² + GST
Ensuite for the new suite$37k–$42k inc GST
Second storey for teenagers/office$3,790–$4,230/m² + GST
Full rear + roof tie-in (entertainer's zone)Depends on roof tie-in and structure

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Extend, Don't Move — Stanmore

Free design consultation for Stanmore 2048. We'll assess your home and talk through extension options and the approval pathway, then provide a fixed-price contract once design and scope are set.

Start Your Project