Knockdown Rebuild Botany — Demo to Handover in 12 Months
Botany 2019 KDR with tight programme: demolition (3–4 weeks), new home (24–40 weeks). CDC fast-track or Bayside Council DA. Weekly progress updates.
Knockdown Rebuild Builder in Botany
A knockdown rebuild in Botany is workable with the right checks, because this suburb between Mascot and Botany Bay carries a few site factors most suburbs do not — Botany Sands soil with an elevated water table, industrial-legacy contamination on remediated parcels near Port Botany, and the flight-path overlay.
None of those stop a rebuild; they just have to be designed for. The sands and water table shape the footing design off a real geotech, the contamination history is a due-diligence check near the port land, and the flight path calls for acoustic glazing. Heritage Conservation Areas sit in pockets including the Botany village.
The stock is Federation, inter-war and post-war fibro and brick on 400 to 700m² blocks, and the older homes carry asbestos, so a licensed strip-out leads the demolition.
We rebuild fixed-price, licence HBL 487805C. Get our feasibility, with the sands, water table and checks handled, before you commit.
Buildana manages the complete knockdown rebuild process in Botany — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.
Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.
- New home in Botany from $450K
- Bayside Council DA and CDC approvals managed
- Demolition and asbestos removal included
- M — engineered slab design included
- Typical blocks 400–700m² in Botany
- Single and two-storey designs available
- 6-year structural warranty
- Free site assessment — near Bus to Mascot (T8, 2 km) station

Reviewed by Oliver Alameri
Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010
Design for the sands and the checks
Botany's site factors — the Botany Sands with an elevated water table, contamination history near the Port Botany land, and the flight-path overlay — do not stop a rebuild, but they have to be designed for. The footing design comes off a real geotech for the sands, and the acoustic glazing off the overlay.
On 400 to 700m² blocks, the aging stock suits a modern rebuild once those are handled.
Heritage pockets and asbestos
Heritage Conservation Areas sit in pockets including the Botany village, so a listed block goes down the DA path. Near the port land, the contamination due-diligence check is raised upfront.
The older stock carries asbestos, so a licensed strip-out and clearance certificate lead the demolition.
Knockdown-rebuild builder in Botany — key facts
- Suburb
- Botany, NSW 2019
- Council / LGA
- Bayside Council (Bayside)
- Primary zoning
- R2 Low
- Typical lot size
- 400–700m²
- Soil class
- M
- Median house price
- $1.7M–$2.6M
- Home era
- 1910s–1970s
- Typical price range
- $450,000 – $1,200,000+
- Typical timeline
- 14–22 months including demolition
- Approval pathway
- CDC where eligible or DA for complex sites
Want a real number for YOUR block — not a generic estimate?
Free site assessment, fixed-price contract, line-itemised quote within 48 hours. No high-pressure sales — just a real builder talking real numbers.
Quality Promise
Buildana handles Botany KDR end-to-end — old house out, new house in, one contract, one contractor, one defined timeline.
How It Works
From First Call to Final Key
KDR starts with an honest look at the existing house. Sometimes it's worth keeping. Most Botany homes from the 1910s–1970s — especially fibro and brick-veneer — are beyond the point where renovation makes sense. We tell you straight.
⏱Demolition is pre-approved to run parallel with rebuild design. Asbestos cleared, services abolished, site stripped in a single mobilisation. Geotech reconfirms Class M soil with the old house gone.
⏱New house goes up on the same footprint or a better one, whichever serves the block. Modern NCC envelope, better orientation, fit-for-purpose room sizes. The suburb stays the same; the house finally fits it.
⏱Final handover: new OC, six-year structural warranty, all the documentation on your Botany block you'd get on a greenfield build. The only difference is you still live in the street you chose.
⏱Our Team
Oliver Alameri
Founder / Director / Builder · MPropDev · PhD Student
Ahmad Alameri
Accounts Manager
Claire Wendell
Project Manager
Estimate Your Build Cost
Use our free calculator to get an instant cost estimate for your project
Still got questions? Talk to Oliver directly.
30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.
Frequently Asked Questions
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
Fatima Al-Rashid
Liverpool, NSW
We Build Across Sydney
Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.
Last updated: 1 April 2026
Book a Botany Knockdown Rebuild Assessment
Free KDR site assessment for Botany 2019. We'll assess your block, estimate cost, and provide a fixed-price budget.
Start Your ProjectMore in Botany
Other Buildana services in Botany
Costs, approval pathway and fixed-price contract detail for every other build type we deliver in Botany 2019. Bayside Council regulations and local controls are covered on each page.