Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

House Demolition & Knockdown Rebuild Rozelle

Demolition and a new home in Rozelle 2039, approved together and built under one contract. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300

Knockdown Rebuild Builder in Rozelle

Knockdown rebuild in Rozelle is rarely the product, and I will be straight about why. This Balmain-peninsula suburb is Victorian terraces, Federation cottages and sandstone workers' cottages on 100 to 350m² blocks, with Heritage Conservation Areas covering most of the suburb and substantial sandstone fall to Iron Cove and Rozelle Bay.

On the heritage stock, the right work is a sympathetic restoration with a rear extension — often stepping down the fall, which the harbour-fall blocks reward with light and outlook. The Bays West masterplan will reshape the foreshore over the coming decades, which is worth understanding on the foreshore-adjacent blocks.

The ground is Hawkesbury Sandstone, so any excavation hits rock, priced from a real geotech. The old stock almost always carries asbestos and lead paint, so a licensed strip-out leads any works.

We build under NSW contractor licence 487805C. For Rozelle, the real conversation is restoration and extension — let me show you what is possible.

Buildana manages the complete knockdown rebuild process in Rozelle — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home designed for your Rozelle block
  • Inner West Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • M — engineered slab design included
  • Typical blocks 100–350m² in Rozelle
  • Single and two-storey designs available
  • Statutory home warranties
  • Free site assessment — near Light Rail Rozelle Bay (in suburb) station
KDR on a 100–350m² block in Rozelle — demolition plus new home
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

Heritage on the harbour fall

Rozelle's Victorian terraces and sandstone workers' cottages sit on 100 to 350m² blocks with Heritage Conservation Areas covering most of the suburb, and substantial fall to Iron Cove and Rozelle Bay. A standard knockdown is rarely on the table.

The right work is a sympathetic restoration with a rear extension — often stepping down the fall, which the harbour-fall blocks reward with light and outlook. The Bays West masterplan is worth understanding on the foreshore-adjacent blocks.

Rock and old materials

The Hawkesbury Sandstone means any excavation hits rock, priced from a real geotech and planned carefully on the tight blocks.

The old stock almost always carries asbestos and lead paint, so a licensed strip-out leads any works.

Knockdown-rebuild builder in Rozelle — key facts

Suburb
Rozelle, NSW 2039
Council / LGA
Inner West Council (Inner West)
Primary zoning
R1/R2 General/Low
Typical lot size
100–350m²
Soil class
M
Home era
1850s–1920s
Typical price range
To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Quality Promise

Rozelle knockdown rebuild done cleanly: licensed demolition, compliant slab, new home built to NCC 2025. Fixed-price contract.

Fixed-price contract once the design and scope are setNCC 2025 and BASIX compliantFull Inner West Council complianceLicensed demolition and asbestos removalWeekly progress updatesStatutory home warranties

How It Works

From First Call to Final Key

Everything that has to be right before we touch the ground. On-site assessment covers block measurements, soil conditions (Class M), tree preservation checks, service locations, and asbestos identification on your 1850s–1920s-era home. Clear feasibility report before you commit. Approval pathway gets locked at design stage based on FSR, height, setbacks, and any overlays. Most Rozelle KDRs go CDC for speed; we use DA when the design wants to push past complying development limits. Either way, all documentation prepared and lodged in-house.

⏱

The Rozelle construction phase. Fixed price, programmed, supervised. Existing home demolished by licensed contractors. Asbestos removed and disposed of to EPA standards. Services disconnected, site cleared and prepped for construction. Buildana manages all permits and logistics. Construction starts the week demolition finishes — no idle site, no momentum lost. Slab pour comes first, frame stand soon after. As a guide, the ABS average build for a new NSW house was 2.99 quarters in 2025-26.

⏱

The job isn't done when the site's clean; it's done when you have keys, certificates and warranties. Final inspection, Occupation Certificate, NSW statutory warranties, keys, and maintenance guide. Services reconnected. Your new home near Darling Street & Rozelle Bay.

⏱

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Book a Rozelle Knockdown Rebuild Assessment

Free KDR site assessment for Rozelle 2039. We'll assess your block and talk through demolition, approvals and the build.

Start Your Project