Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

House Demolition & Knockdown Rebuild Balmain

Demolition and a new home in Balmain 2041, approved together and built under one contract. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Knockdown rebuild in Balmain. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs. Inner West Council approval by CDC or DA.

Knockdown Rebuild Builder in Balmain

Here is the truth about knockdown rebuild in Balmain: it almost never happens. Heritage Conservation Areas cover virtually the whole peninsula, and Council will not let you demolish a Victorian terrace or sandstone workers' cottage that contributes to the streetscape. Blocks run 100 to 400m² and the housing dates from the 1850s to the 1920s, this is fabric the Inner West protects hard. Anyone promising you a clean demolition approval here has not read the LEP.

The exceptions are rare, a non-contributory post-war infill inside an HCA, or a dwelling already compromised beyond repair, and even then you are arguing the case with heritage consultants. Foreshore Building Line restrictions add another layer on anything near Mort Bay or Iron Cove. What most Balmain owners actually need is a rebuild behind a retained facade or a serious restoration-extension.

What I would check first on a Balmain block: whether the home is contributory to an HCA, any Foreshore Building Line near the water, and what the site can legally carry. Those decide it.

We build these under NSW contractor licence 487805C. Ask us to assess what your site can legally carry before you spend a cent on design.

Buildana manages the complete knockdown rebuild process in Balmain — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home designed for your Balmain block
  • Inner West Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • M — engineered slab design included
  • Typical blocks 100–400m² in Balmain
  • Single and two-storey designs available
  • Statutory home warranties
  • Free site assessment — near Light Rail Balmain (1 km) / Ferry Balmain to CBD station
KDR construction in Balmain — R1/R2 General/Low zoned
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

Demolition almost never gets approved

Heritage Conservation Areas cover virtually the whole Balmain peninsula, and Council will not let you demolish a Victorian terrace or sandstone workers' cottage that contributes to the streetscape. The housing dates from the 1850s to the 1920s, fabric the Inner West protects hard.

Anyone promising a clean demolition approval here has not read the LEP. So the knockdown, not the rebuild, is what stops most projects.

What most owners actually need

The exceptions are rare: a non-contributory post-war infill inside an HCA, or a dwelling already compromised beyond repair, and even then you argue the case with heritage consultants. Foreshore Building Line restrictions add a layer near Mort Bay or Iron Cove.

What most Balmain owners actually need is a rebuild behind a retained facade or a serious restoration-extension. We assess what your site can legally carry before you spend a cent on design.

Knockdown-rebuild builder in Balmain — key facts

Suburb
Balmain, NSW 2041
Council / LGA
Inner West Council (Inner West)
Primary zoning
R1/R2 General/Low
Typical lot size
100–400m²
Soil class
M
Home era
1850s–1920s
Typical price range
To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Site assessment and feasibility
Demolition and asbestos management (licensed)
Service disconnections — Sydney Water, Endeavour Energy, gas in Balmain
Architectural design for your 100–400m² block
Geotechnical report (Class M soil — Balmain)
BASIX certificate and compliance with the applicable NCC
Inner West Council DA or CDC lodgement
Engineered slab and full construction
Kitchen, bathroom and fit-out
Driveway, landscaping and external works

How It Works

From First Call to Final Key

Free site inspection of your Balmain property. We check lot dimensions, Inner West Council's planning controls, existing home condition, and potential asbestos.

⏱

KDR is the chance to get the design right — the new build doesn't have to mimic the original layout. We start from your block's strengths (orientation, slope, views) and your family's brief, then design the home the original lot always deserved.

⏱

Licensed demolition of existing 1850s–1920s-era dwelling. Asbestos removal by certified contractors (if present).

⏱

Your new home goes up on the cleared site. Engineered slab sized for Class M soil, frame, roof, fit-out, kitchen, bathrooms, flooring, painting, driveway, and landscaping.

⏱

Handover pack: OC, structural certificates, BASIX, appliance manuals and warranties, paint colour schedule, maintenance plan, and the keys. Statutory warranty periods are measured from completion, not simply the OC date — keep the documentation safe for any future sale.

⏱

Quality Promise

Balmain KDR projects run on one contract: demolition, asbestos clearance, approvals, construction, handover. One builder accountable.

Fixed-price contract once the design and scope are setNCC 2025 and BASIX compliantFull Inner West Council complianceLicensed demolition and asbestos removalWeekly progress updatesStatutory home warranties

Cost Guide

ItemEstimated Range
Demolish 1850s–1920s fibro → new double storey (build only)$735k–$1.27M + GST
Demolish brick veneer → new single storey (build only)$565k–$980k + GST
Demolition of the existing homeDepends on house size, construction and asbestos
Asbestos removal (if present)Depends on the type and quantity found
Service disconnections & reinstatementDepends on the services connected to the site

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Knockdown Rebuild in Balmain

Free KDR site assessment for Balmain 2041. We'll assess your block and talk through demolition, approvals and the build.

Start Your Project