Skip to content

We’re here to make it feel like home

Buildana construction project in Western Sydney

Knockdown Rebuild South Granville — From $450K All-In

Fixed-price knockdown rebuild in South Granville 2142. Demolition, new home, all Cumberland City Council approvals under one contract. No surprises, no variation trail.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300

Demolish and Rebuild in South Granville

A knockdown rebuild in South Granville suits the post-war stock on standard 450 to 650m² R2 and R3 blocks, in a quiet residential pocket with established infrastructure and good access to Parramatta Road. The 1950s to 1970s homes are aging into rebuild territory.

The ground is Class M shale, which takes a standard engineered slab off a geotech. The post-war homes usually carry asbestos, so a licensed strip-out and clearance certificate lead the demolition.

On the R3 blocks over the 600m² minimum, a duplex can be the stronger return, so I run both feasibilities where the block allows.

We rebuild fixed-price, licence HBL 487805C. Get our knockdown rebuild feasibility before you commit.

Buildana manages the complete knockdown rebuild process in South Granville — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home in South Granville from $450K
  • Cumberland City Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • Class M soil — engineered slab design included
  • Typical blocks 450–650m² in South Granville
  • Single and two-storey designs available
  • 6-year structural warranty
  • Free site assessment — near Granville (1 km) station
KDR construction in South Granville — R2 Low Density & R3 Medium Density zoned
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

Quiet pocket, good access

South Granville is a quiet residential suburb with established infrastructure and handy access to Parramatta Road. On standard 450 to 650m² blocks, the post-war stock is aging into rebuild territory, so a knockdown resets a dated home into a modern one.

It keeps you close to Granville and the broader Parramatta area while staying in a settled street.

Asbestos and the duplex question

The Class M shale takes a standard engineered slab off a geotech. The post-war stock usually carries asbestos, so a licensed strip-out and clearance certificate lead the demolition.

On the R3 blocks over 600m², I cost the duplex alongside the single rebuild so you can see both returns.

Knockdown-rebuild builder in South Granville — key facts

Suburb
South Granville, NSW 2142
Council / LGA
Cumberland City Council (Cumberland City)
Primary zoning
R2 Low Density & R3 Medium Density
Typical lot size
450–650m²
Soil class
Class M
Median house price
$1.0M–$1.3M
Home era
1950s–1970s
Typical price range
$450,000 – $1,200,000+
Typical timeline
14–22 months including demolition
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Free site assessment, fixed-price contract, line-itemised quote within 48 hours. No high-pressure sales — just a real builder talking real numbers.

Quality Promise

South Granville KDR projects run on one contract: demolition, asbestos clearance, approvals, construction, handover. One builder accountable.

Fixed-price KDR constructionNCC 2025 and BASIX compliantFull Cumberland City Council complianceLicensed demolition and asbestos removalWeekly progress updates6-year structural warranty

How It Works

From First Call to Final Key

We assess your South Granville block — lot size (typical 450–650m²), R2 Low Density & R3 Medium Density zoning, setbacks, FSR, and existing dwelling condition. Asbestos survey included.

Complete design package: floor plans, elevations, 3D renders, structural engineering, geotech, BASIX, stormwater, and all documentation Cumberland City Council requires. Approval managed start to finish.

Pre-demolition: dilapidation report on adjoining properties (protects you against unfounded damage claims), service disconnections, asbestos clearance, neighbour notification. Then 1–2 weeks of physical demolition with material sorted at site for recycling where possible.

Fixed-price construction: engineered slab, frame, lock-up, fit-out, external works. 8–12 months depending on size.

Same address, completely different home. Permanent gas, water, electrical, NBN reconnected and tested.

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

South Granville KDR — Start Here

Free KDR site assessment for South Granville 2142. We'll assess your block, estimate cost, and provide a fixed-price budget.

Start Your Project