
Builder Point Piper, Woollahra
Point Piper is Australia's most expensive postcode — the harbour-fall peninsula on Wolseley Road and Wunulla Road. Grand Federation and inter-war mansions on 600–2,500m² blocks with direct harbour frontage. Heritage Conservation Areas cover virtually all streets. Sandstone-dominant with substantial fall and rock anchoring standard. Sydney's most prestigious harbourside enclave.
Council
Woollahra Municipal
Median price
$15M–$100M+
Typical lot
600–2,500m²
Soil class
M (sandstone ridges) / H–E (harbour fall)
Point Piper build context
- Council
- Woollahra Municipal Council
- Postcode
- 2027
- Primary zoning
- R2 Low / R3 Medium / R4 / B2/B4 mixed
- Typical lot size
- 600–2,500m²
- Predominant home era
- 1880s–1940s heritage mansions
- Soil class
- M (sandstone ridges) / H–E (harbour fall)
- Duplex minimum lot
- 600m²
- Median price band
- $15M–$100M+
- Granny flat rental
- $700–$1,400/week
Why owners build with Buildana in Point Piper
- Licensed NSW builder — registered HBL, full insurance, fixed-price contracts. Honest scope, no soft-start variations.
- Woollahra Municipal Council approval pathway managed end-to-end — CDC where compliant, full DA where merit pathway is the right call.
- Engineering and approvals managed in-house — structural, BASIX, RFS where required, council referrals.
- Asbestos clearance handled by SafeWork NSW licensed contractors — pre-1990 fibro stock priced into the contract.
- Fixed-price contract from demolition through to handover — Rawlinsons-aligned costing, no surprise variations.
- Local landmark — Wolseley Road (Australia's most expensive street). Train: Edgecliff (2 km, ferry from Double Bay).
Buildana services in Point Piper
All six core services delivered across the Woollahra — see the Point Piper build context reflected in each.
Knockdown Rebuild
Demolition, asbestos clearance, foundation engineering and construction under one fixed-price contract — managed end-to-end.
See Point Piper knockdown rebuild approachDuplex
Attached or detached duplex on R2/R3 lots that meet local DCP minimum lot size — twin-slab engineering and approvals managed.
See Point Piper duplex approachGranny Flat
SEPP ARH complying-development pathway — 60m² maximum, no DA on most compliant R2 lots, 4–6 month pre-construction window.
See Point Piper granny flat approachCustom Home
Architect-led design, contemporary or heritage-respectful detailing — sized to the streetscape and the brief, not a template.
See Point Piper custom home approachExtension
Rear and second-storey additions on established housing stock — structural integration and roof tie-ins costed honestly upfront.
See Point Piper extension approachRenovation
Full-house refresh, kitchens, bathrooms, exterior render and roof restoration — fixed-price scope from day one.
See Point Piper renovation approachNearby suburbs we build in
Adjacent Woollahra suburbs covered by the same Woollahra Municipal Council pathway.
Ready to talk about your Point Piper build?
Free site assessment, honest feasibility, fixed-price contract. Woollahra site context priced upfront — no surprise variations.