Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Front of Smart Street at dusk with trees behind, a duplex designed and built by Buildana

Hornsby Heights 2077 · Hornsby Shire Council

Builders Hornsby Heights

In Hornsby Heights, the bushfire rating can write part of the specification before you pick a single finish.

A new home here has to suit its lot. On land mapped as bushfire prone, it also has to be built to the lot's bushfire attack level, and that shapes the windows, decks, roof and walls. I start with that rating and the lie of the land, then design the home around both.

Council
Hornsby Shire
Postcode
2077
New home, brick veneer, medium
$2,820–$3,040/m²
New home, full brick, medium
$2,940–$3,170/m²

Short answer

What should I check before building a new home in Hornsby Heights?

Check the planning certificate or the NSW spatial viewer for bushfire-prone mapping first. If the lot is mapped, a bushfire assessment sets its attack level, which decides the construction standard and can decide whether complying development is available. Then look at the slope and what's under the old house, and design the home for the lot under one contract.

Written and reviewed by

Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana

Fact-checked

The bushfire attack level comes first

Bushfire-prone land is mapped, so you can check it before buying or designing. If your lot is on the map, a bushfire assessment works out its bushfire attack level from the vegetation nearby, the slope and the distance between them. The higher the level, the tougher the construction: glazing, window frames, screens, decks, gutters, roof and wall materials all follow from it.

The rating also affects the approval. At the highest levels, complying development generally isn't available, and a development application can involve the NSW Rural Fire Service. Knowing the level before the design starts means the house is drawn to it once, not redrawn.

  • Bushfire-prone mapping on the spatial viewer
  • A bushfire assessment and attack level for the lot
  • Asset protection zone and access needs
Get the rating before the drawings, not after.

Full brick or brick veneer

Wall construction is one of the first choices on a new home. Rawlinsons gives $2,820–$3,040/m² for a medium-finish brick veneer individual house in Sydney and $2,940–$3,170/m² for full brick, excluding GST, escalated to the ABS September 2026 index. At a high finish, brick veneer is $3,940–$4,250/m².

Full brick means masonry inside and out, so the footings, the slab and any suspended floors have to be designed for the weight. Brick veneer puts a brick skin on a frame. Either can be built to a bushfire rating; the rating decides details like windows, vents and the roof, whichever wall you choose.

Entry hall with an open timber stair at The Boulevarde, a home delivered by Buildana
The entry and stair at The Boulevarde, delivered by Buildana

Building on a Hornsby Heights lot?

Send the address and, if you have it, the bushfire report. Oliver will respond within 4 working hours for a free initial conversation.

0476 300 300

No obligation. We only use your details to respond to this enquiry.

Sloping lots and the old house

Where a lot falls away from the street, a split-level plan can follow the ground rather than fight it, and keeps excavation and retaining under control. A geotechnical report tells you what's under the house before the footings are designed, and the low side of the lot decides where stormwater can go.

If an older house is coming down first, check it for asbestos before demolition is priced. The Hornsby page goes further into rock, slope and drainage across the shire.

Approval and timing

A new house that meets the State's Housing Code standards may be approved as complying development by a certifier; otherwise it's a development application to Hornsby Shire Council. A CDC must be decided within 20 days where neighbours are notified (10 days otherwise), and a DA has a 40-day assessment period. For the build itself, the ABS average build for a new NSW house was 2.99 quarters in 2025-26.

Every new home also needs a BASIX certificate, including a minimum 7-star NatHERS rating. On a bush lot, shading from trees and the glazing the bushfire rating calls for both feed into that.

What I check first in Hornsby Heights

These shape the house before any finishes are chosen.

  1. 01

    Bushfire-prone mapping and the attack level

  2. 02

    Fall across the lot and where it drains

  3. 03

    What's under the existing house

  4. 04

    Trees on the lot and their protection

  5. 05

    Driveway access for machinery and deliveries

  6. 06

    Restrictions on the title under section 88B

Building in Hornsby Heights

How do I find out if my lot is bushfire prone?

The section 10.7 planning certificate says so, and the NSW Planning Portal spatial viewer shows the bushfire-prone land map for an address.

Does a bushfire rating stop me building?

It usually changes how the house is built rather than whether it can be. It can also change how it's approved: at the highest levels, expect a development application, which can involve the NSW Rural Fire Service.

Is full brick better than brick veneer?

It's a choice, not a rule. Full brick costs more per square metre on the published rates ($2,940–$3,170/m² against $2,820–$3,040/m² at a medium finish, excluding GST) and needs footings designed for the weight.

Does the Low and Mid-Rise Housing policy apply in Hornsby Heights?

Hornsby Heights isn't one of the nominated centres. In Hornsby Shire they are Asquith town centre, Hornsby station, Pennant Hills Market Place shopping centre, Thornleigh Marketplace shopping centre and Waitara station. Only land within 800m walking distance of one is covered, and bushfire-prone land can be excluded.

Who are you?

Buildana, a Sydney builder with a studio in Fairfield, NSW contractor licence 487805C. Oliver Alameri has 15+ years' building experience and runs every job.

Start with the rating and the slope

Tell me the address and what you'd like to build. Oliver will respond within 4 working hours for a free initial conversation.