
Bathroom Renovations Cronulla — Kitchens & Whole Homes Too
We renovate across Cronulla 2230, staging the work so you can stay in the home where practical, and checking Sutherland Shire Council's approval triggers before we start.
Renovating Homes in Cronulla
A home renovation in Cronulla builds to marine grade or it fails early — N40 marine concrete, 316 stainless fixings and salt-air facade specs are the standard here, not the upgrade.
The stock rewards it: Federation beach cottages conserved and opened to the ocean, post-war brick transformed, and the Coastal Management Act's vulnerability mapping respected on the beachfront before any design is drawn.
Rock is read from the geotech, and the older fabric gets era-appropriate licensed hazard handling.
We renovate under NSW contractor licence 487805C. Get our renovation scope, with hazard and marine specs resolved, before you commit.
Buildana manages the complete home renovation process in Cronulla — from initial consultation and design through to approvals (where required) and construction to handover, with a fixed-price contract once design and scope are set. Your home, modernised.
Not sure whether to renovate or rebuild? Use our Renovation vs KDR Calculator or read the renovation vs knockdown rebuild comparison.
- Rawlinsons Sydney rates: new bathroom $37k–$42k inc GST, new kitchen $31k–$35k inc GST
- Sutherland Shire Council approvals managed (where required)
- Kitchen, bathroom, and full-home renovations
- 1920s–1960s heritage + premium contemporary-era homes — renovation specialists
- Asbestos assessment and licensed removal managed
- Waterproofing by licensed contractors, as NSW requires
- No engineered stone benchtops — banned in Australia since 1 July 2024
- Staged renovation plans to minimise disruption
- 6-year structural warranty on structural work
- Free consultation — near Cronulla station

Reviewed by Oliver Alameri
Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years
Marine grade is the entry fee
Cronulla's salt air destroys standard construction within years — N40 marine concrete, 316 stainless and coastal facade specs are where honest beachside renovations start, and I spec them as standard.
The beach cottages and post-war brick both reward the work done to that grade.
Hazard mapped on the front
The Coastal Management Act's vulnerability mapping restricts the beachfront envelope — checked before design. The older fabric's hazards run as licensed, era-appropriate processes.
All priced into the scope upfront.
Home renovation builder in Cronulla — key facts
- Suburb
- Cronulla, NSW 2230
- Council / LGA
- Sutherland Shire Council (Sutherland Shire)
- Primary zoning
- R2 Low
- Typical lot size
- 400–800m²
- Soil class
- Hawkesbury Sandstone bedrock
- Home era
- 1920s–1960s heritage + premium contemporary
- Typical price range
- New bathroom $37k–$42k inc GST; new kitchen $31k–$35k inc GST (Rawlinsons Sydney)
- Approval and build time
- Internal kitchen and bathroom work often needs no approval; structural or external changes need a CDC or DA
- Approval pathway
- Exempt development for cosmetic, CDC/DA for structural
Want a real number for YOUR block — not a generic estimate?
Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.
Quality Promise
Buildana's Cronulla renovation approach: assess the existing fabric, design the changes, price the whole job, deliver on contract.
How It Works
From First Call to Final Key
Everything that has to be right before we touch the ground. Renovation consultations look at hidden issues as much as visible ones — wiring age, plumbing condition, waterproofing in wet areas, asbestos likelihood for 1920s–1960s heritage + premium contemporary-era stock. Surface-level scoping leads to mid-job surprises; we go deeper at consultation. Renovation design covers layout changes, material selections, fixture specifications, and integration with existing structure. Kitchen, bathroom, living areas — your brief drives the design.
⏱The Cronulla construction phase. Fixed price, programmed, supervised. We check whether your renovation scope triggers Sutherland Shire Council approval requirements. If it does, we prepare and lodge all documentation. If not, we move straight to construction. Construction stage is where most renovation jobs blow out, because trades stop showing up or the scope grows. Buildana protects against both: trades on dedicated programmes, scope frozen at contract with a written variation process for any changes.
⏱The job isn't done when the site's clean; it's done when you have keys, certificates and warranties. Walk through your renovated home. Defect-free inspection, warranty documentation, appliance manuals, and maintenance guide provided. OC issued if structural work was involved.
⏱Who you deal with
Oliver Alameri
Founder and Builder · Master of Property Development · NSW Licence 487805C
Estimate Your Build Cost
Use our free calculator to get an instant cost estimate for your project
Still got questions? Talk to Oliver directly.
30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.
Frequently Asked Questions
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
Fatima Al-Rashid
Liverpool, NSW
We Build Across Sydney
Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.
Last updated: 4 September 2026
Start a Cronulla Home Renovation
Free renovation consultation for Cronulla 2230. We'll assess your home and talk through renovation options and any approvals needed, then provide a fixed-price contract once design and scope are set.
Start Your ProjectMore in Cronulla
Other Buildana services in Cronulla
Costs, approval pathway and fixed-price contract detail for every other build type we deliver in Cronulla 2230. Sutherland Shire Council regulations and local controls are covered on each page.