Skip to content
Buildana construction project in Western Sydney

Knockdown Rebuild Allambie Heights — From $450K All-In

Fixed-price knockdown rebuild in Allambie Heights 2100. Demolition, new home, all Northern Beaches Council approvals under one contract. No surprises, no variation trail.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

A knockdown rebuild in Allambie Heights costs $450,000–$1,200,000+. Standard single-storey from $450K, two-storey from $650K. Buildana manages demolition, Northern Beaches Council approvals, and construction under one fixed-price contract.

Allambie Heights Knockdown Rebuilds

KDR in Allambie Heights works 600–900m² bushland-fringe lots — Hawkesbury Sandstone rock excavation $40K–$120K, BAL-12.5 to BAL-29 on perimeter, Northern Beaches Hospital proximity. End values $2.4M–$3.6M. Pre-construction 6–9 months.

Most Allambie Heights blocks run 600–900m² on Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts ground. Knockdown rebuild on 1960s–1980s + 2010s+ premium replacements stock here usually pencils out better than deep renovation once you tally up structural, electrical, plumbing, insulation, and waterproofing upgrades against full replacement value. Median price band: $2.4M–$3.6M. Nearest rail is B-Line bus to CBD via Mosman / Brookvale (3 km).

Buildana manages the complete knockdown rebuild process in Allambie Heights — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home in Allambie Heights from $450K
  • Northern Beaches Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil — engineered slab design included
  • Typical blocks 600–900m² in Allambie Heights
  • Single and two-storey designs available
  • 6-year structural warranty
  • Free site assessment — near B-Line bus to CBD via Mosman / Brookvale (3 km) station
Knockdown-rebuild project by Buildana in Allambie Heights 2100
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

Why Knockdown Rebuild in Allambie Heights?

Allambie Heights is the elevated bushland-fringe suburb above Manly Vale — 1960s–1980s brick and contemporary on 600–900m² blocks with substantial sandstone topography. BAL-12.5 to BAL-29 bushfire ratings on perimeter lots backing Manly Dam Reserve and Garigal National Park. Hawkesbury Sandstone soil with rock excavation typical $40K–$120K. Northern Beaches Hospital proximity drives medical-staff demand.

Allambie Heights's rural-residential character and 600–900m² blocks set it apart from standard suburban development. R2 Low / R3 Medium (Manly, Dee Why, Brookvale, Mona Vale, Avalon town centres) / RU2 Rural Landscape (Ingleside, Terrey Hills, Duffys Forest, Oxford Falls) / E3/E4 Environmental on bushland fringe zoning means different controls apply — larger setbacks, on-site services, and site-specific engineering. Transport access via B-Line bus to CBD via Mosman / Brookvale (3 km) connects Allambie Heights to the wider Sydney network. 1960s–1980s + 2010s+ premium replacements-era housing stock across Allambie Heights is prime for knockdown rebuild — replacing dated layouts and materials with modern, NCC-compliant homes that maximise block potential. Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil (extremely reactive) is standard for Allambie Heights — Buildana includes engineered slab design in every quote.

KDR in the Northern Beaches splits sharply by tier. The premium oceanfront and harbour-front tier — Manly, Freshwater, Curl Curl, Collaroy, Narrabeen, Mona Vale, Newport, Avalon Beach, Bilgola Beach, Whale Beach, Palm Beach (oceanfront); Clontarf, Seaforth, Balgowlah Heights, Fairlight (harbour-front); Bayview, Church Point, Clareville (Pittwater-front) — runs end values $4M–$15M+ on direct waterfront, $2.5M–$6M+ on premium suburban. Hawkesbury Sandstone soil predominant — deep rock excavation $40K–$200K+ is LGA-defining; the Northern Beaches has the most rock-excavation territory of any Sydney LGA on a per-build basis. Bushfire-prone overlays are LGA-defining — BAL-12.5 to BAL-FZ across virtually all bushland-fringe lots (Belrose, Davidson, Killarney Heights, Frenchs Forest, Forestville, Beacon Hill, Cromer, Allambie Heights, Bayview, Church Point, Avalon, Bilgola Plateau, Whale Beach, Palm Beach, Clareville). RFS Bushfire Protection Assessment routine — non-combustible cladding, ember-screened openings, sprinklered eaves on BAL-FZ adding $40K–$120K. Coastal Hazard zones drive coastal-engineering reports on Pittwater Road oceanfront properties at Collaroy, Narrabeen, Curl Curl, Dee Why, Mona Vale, Palm Beach (2016 storm event reset baselines on Collaroy/Narrabeen). Coastal salt-grade specs (marine-grade fixings, sealed envelope, copper/zinc flashings, treated-pine timber) standard on every coastal-facing build — add $20K–$60K material premium. Coastal acid sulphate soils (CASS) on lagoon margins (Narrabeen Lagoon, Curl Curl Lagoon, Dee Why Lagoon, Manly Lagoon, Mona Vale Lagoon) drive specialist dewatering and acid neutralisation protocols. Heritage Conservation Areas extensive across the older village cores. Tree Preservation Order LGA-wide and strict. Demolition $40K–$90K with asbestos universal pre-1990. RU2 acreage at Ingleside, Terrey Hills, Duffys Forest, Oxford Falls runs AWTS on-site sewer and Sydney Drinking Water Catchment overlay (parts) — premium acreage end values $3.5M–$8M+. Realistic premium turnkey $1.8M–$3.2M for 280–450m² inland mid-tier (Brookvale, Dee Why, Cromer, Narraweena, Beacon Hill, Allambie Heights, Wheeler Heights); $2.5M–$5M on premium suburban (Balgowlah, Fairlight, Manly Vale, Forestville, Frenchs Forest, Belrose, Davidson); $4M–$10M+ on oceanfront/harbour-front (Manly, Clontarf, Seaforth, Balgowlah Heights, Curl Curl, Freshwater, Collaroy, Mona Vale, Newport, Avalon); $6M–$20M+ on Palm Beach/Whale Beach/Bilgola Beach direct beachfront. Pre-construction 5–8 months suburban; 8–14 months on bushfire-prone, coastal hazard, RU2 acreage or heritage sites.

Planning Controls — Northern Beaches Council

Northern Beaches LEP 2022 (consolidating the legacy Manly, Warringah and Pittwater LEPs) & Northern Beaches DCP. Post-2016 amalgamation LGA spanning the entire ocean-and-harbour peninsula from North Head to Barrenjoey — 252 km² with 36+ residential suburbs, four lagoons, the Garigal and Ku-ring-gai Chase National Parks, and the Pittwater estuary. R2 Low Density covers most residential streets: FSR 0.5–0.55:1, building height 8.5–9m, front setback 6–7.5m, landscaped area 40–60%, deep soil 25–35%. R3 Medium Density along Pittwater Road and around station precincts (no rail — B-Line bus equivalents at Manly, Brookvale, Dee Why, Collaroy, Narrabeen, Mona Vale interchange/terminus) permits FSR up to 0.9:1. R4 High Density and B4 Mixed Use concentrated on Manly town centre + the Corso, Dee Why town centre, Brookvale, Mona Vale town centre, Avalon village core. Northern Beaches DCP duplex minimum lot varies by precinct — 600m² (legacy Manly + Pittwater R2) to 700m² (legacy Warringah R2). RU2 Rural Landscape covers the rural acreage belt — Ingleside, Terrey Hills, Duffys Forest, Oxford Falls, parts of Belrose — restricting subdivision to 2ha+ minimum. E3 Environmental Management and E4 Environmental Living overlays on bushland-fringe lots backing Garigal NP, Ku-ring-gai Chase NP, Manly Dam Reserve and Narrabeen Lagoon catchment further restrict siting. Heritage Conservation Areas extensive — Manly heritage core (the Corso, Eastern Hill, North Head precinct), Fairlight, Balgowlah, Balgowlah Heights, Clontarf, Seaforth, Avalon village, Newport village, Mona Vale, Bilgola Beach cove, Whale Beach, Palm Beach village, Freshwater village (Duke Kahanamoku surfing precinct), Curl Curl heritage streets, Collaroy village, Narrabeen heritage streets. Aboriginal cultural heritage protocols apply across most sandstone country (extensive rock-art sites, middens, engravings) — pre-DA Aboriginal Cultural Heritage Assessment routine on bushland-fringe and waterfront sites. Tree Preservation Order LGA-wide and strict — Northern Beaches retains the most extensive remnant bushland of any Sydney LGA. Hawkesbury Sandstone soil predominant — deep rock excavation $40K–$200K+ is LGA-defining (the most rock-excavation territory of any Sydney LGA on a per-build basis). Class P/E coastal alluvial on Narrabeen Lagoon, Curl Curl Lagoon, Dee Why Lagoon, Manly Lagoon and Mona Vale Lagoon corridors — suspended slab + Class P/E footing engineering and dewatering required. Coastal acid sulphate soils (CASS) on lagoon margins drive specialist dewatering and acid neutralisation protocols. Coastal Hazard zones are LGA-defining — coastal erosion line affects Pittwater Road oceanfront properties at Collaroy, Narrabeen, Curl Curl, Dee Why, Mona Vale, Palm Beach (2016 storm event reset baselines on Collaroy/Narrabeen specifically; multiple oceanfront properties since required Council coastal-hazard reports for any DA). Bushfire-prone land overlays are LGA-defining — BAL ratings BAL-12.5 to BAL-FZ across virtually all bushland-fringe lots (Belrose, Davidson, Killarney Heights, Frenchs Forest, Forestville, Beacon Hill, Cromer, Allambie Heights, Oxford Falls, Terrey Hills, Duffys Forest, Ingleside, Bayview, Church Point, Avalon, Bilgola Plateau, Whale Beach, Palm Beach, Clareville, Newport bushland-fringe). RFS Bushfire Protection Assessment routine — non-combustible cladding, ember-screened openings, sprinklered eaves on BAL-FZ, Asset Protection Zone (APZ) 10–40m+ on most acreage. AWTS on-site sewer mandatory on RU2 acreage belt (no reticulated sewer on Ingleside/Terrey Hills/Duffys Forest/Oxford Falls). Sydney Drinking Water Catchment overlay on parts of Ingleside, Terrey Hills, Duffys Forest western edges and Pittwater foreshore — restricts AWTS dispersal field siting and adds NSW Health/WaterNSW referral. Riparian setbacks 10–60m on Narrabeen Lagoon, Curl Curl Lagoon, Dee Why Lagoon, Manly Lagoon, Mona Vale Lagoon, Pittwater foreshore, Cowan Creek tributaries, Middle Harbour and North Harbour. Foreshore Building Line restrictions on direct waterfront across Pittwater (Bayview, Church Point, Clareville, Avalon, Newport), Middle Harbour (Clontarf, Seaforth, Balgowlah Heights), North Harbour (Fairlight, Balgowlah Heights) and ocean cliffs (Manly, Freshwater, Curl Curl, Narrabeen, Mona Vale, Newport, Bilgola, Avalon, Whale Beach, Palm Beach). The LGA has no rail — B-Line bus is the primary spine (Mona Vale terminus through Warringah Mall Brookvale interchange to CBD via Mosman). Beaches Link Tunnel (under construction, opening 2028) is the LGA-defining infrastructure event — twin tunnels under Middle Harbour connecting Cammeray to Balgowlah/Seaforth with portals reshaping traffic and property values across Balgowlah, Balgowlah Heights, Seaforth, Manly Vale and Manly. Northern Beaches Hospital (opened 2018, Frenchs Forest) anchors LGA medical employment and drives granny flat hospital-staff demand on Frenchs Forest, Davidson, Allambie Heights, Forestville, Belrose. Manly Hospital site redevelopment under master plan. Mona Vale Hospital site (Northern Beaches Hospital amalgamation legacy) under redevelopment. Warriewood Valley Release Area is the LGA's only active master-planned new-release on R3/R4 medium-density 300–600m² lots. Ingleside Precinct master-plan rezoning (originally proposed for ~3,400 dwellings) under review/paused. The Corso, Manly is the heritage retail spine. Avalon, Newport, Mona Vale, Collaroy, Dee Why, Brookvale and Manly are the primary commercial centres. Premium clifftop ocean-view properties at Manly, Freshwater, Curl Curl, Avalon, Bilgola, Whale Beach, Palm Beach are among Australia's most expensive residential markets ($8M–$30M+ on Palm Beach alone).

Knockdown-rebuild builder in Allambie Heights — key facts

Suburb
Allambie Heights, NSW 2100
Council / LGA
Northern Beaches Council (Northern Beaches)
Primary zoning
R2 Low / R3 Medium (Manly, Dee Why, Brookvale, Mona Vale, Avalon town centres) / RU2 Rural Landscape (Ingleside, Terrey Hills, Duffys Forest, Oxford Falls) / E3/E4 Environmental on bushland fringe
Typical lot size
600–900m²
Soil class
Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts
Median house price
$2.4M–$3.6M
Home era
1960s–1980s + 2010s+ premium replacements
Typical price range
$450,000 – $1,200,000+
Typical timeline
14–22 months including demolition
Approval pathway
CDC where eligible or DA for complex sites

Building in Allambie Heights — Local Context

Ground Conditions That Affect Your Build

Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts is the rule across Allambie Heights — extremely reactive clay. For your knockdown rebuild, expect engineered footings in the $45,000–$80,000 range. The variables that shift you up or down inside that band: building footprint, number of storeys, point loads (heavy stone benchtops, masonry feature walls), and whether the adjacent stormwater system needs upgrading. Allambie Heights is close to B-Line bus to CBD via Mosman / Brookvale (3 km) station — site access on tighter blocks adds a logistics premium, which is why we cost cranage and material delivery before signing, not after.

Northern Beaches Council & Approval Pathway

Allambie Heights sits inside the Northern Beaches LGA, governed by Northern Beaches Council. For a knockdown rebuild, the approval question is usually CDC vs DA. Either CDC or DA can apply, depending on whether your design fits within the State Codes SEPP. We assess that before drawing anything. Either way, we manage submission, RFIs, and re-lodgement in-house — you don't deal with the council.

Allambie Heights Build Economics

Allambie Heights sits in the $2.4M–$3.6M price band, which is the framing for any knockdown rebuild decision. On a 600–900m² block here, the build-versus-buy maths usually favours knockdown rebuild on stock from before 1985 — replacement value typically beats deep renovation. Free Buildana feasibility runs the numbers against your actual block before any commitment.

Allambie Heights Housing Stock & What That Means

Most homes in Allambie Heights were built 1960s–1980s + 2010s+ premium replacements. That puts asbestos risk firmly in play — sheeting, eaves linings, vinyl floor tiles, and pipe lagging are likely. Licensed removal adds $5,000–$25,000 to a rebuild where demolition is involved, and Buildana manages SafeWork NSW notifications, removal, and clearance certificates as part of the contract.

Realistic Allambie Heights Timeline

End-to-end timeline for a knockdown rebuild in Allambie Heights, lodgement-realistic: 8-14 weeks for DA, depending on neighbour notification and any RFI rounds. Add 2-3 weeks for documentation pack assembly before lodgement (BASIX, geotech for Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts, contour survey, hydraulic). Add 1 week for Construction Certificate post-approval. Construction itself runs 8-14 months once you're on the ground. Buildana provides a dated programme in every contract, not a vague "12-18 months" range.

Builder's Take on Allambie Heights

Clients often ask whether to keep the existing slab. Almost always no. 1960s–1980s + 2010s+ premium replacements-era slabs in Allambie Heights weren't engineered for Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil to today's standards. Trying to match new construction to old footings creates structural liability. Full slab replacement is cleaner and cheaper in the long run.

1960s–1980s + 2010s+ premium replacements Allambie Heights homes are often asbestos-affected — not always, but often enough that the demolition quote should include contingency. AL/A-class licensed removal runs $8K–$25K on top of standard demolition. Any builder who doesn't flag this is either inexperienced or setting up a variation.

Allambie Heights vs Nearby Suburbs

Allambie Heights vs nearby suburbs — key metrics for knocking down and rebuilding.

SuburbMedian PriceTypical LotSoil ClassEraStation
Allambie Heights2100this suburb$2.4M–$3.6M600–900m²Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1960s–1980s + 2010s+ premium replacementsB-Line bus to CBD via Mosman / Brookvale (3 km)
Beacon Hill2100$2.0M–$3.0M550–800m²Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1960s–1980sB-Line bus to CBD (Brookvale interchange)
Manly Vale2093$2.4M–$3.6M450–700m²Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1900s–1940s + post-war + premium replacementsB-Line bus to CBD (Manly interchange)
Frenchs Forest2086$2.2M–$3.4M600–900m²Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1960s–1980sB-Line bus to CBD (Forest Way interchange)

Median price, soil class, and lot size shape build feasibility and final cost. Buildana assesses every site against these and other constraints during the free feasibility stage.

Have a question about your project?

Talk to our team — free site assessment and fixed-price quote.

Licensed Class 1 demolisher with SafeWork NSW notification
Asbestos register compiled; removal by AL/A-class licensed contractor
Sydney Water service abolishment and reinstatement per standards
Endeavour Energy disconnection and new dedicated supply to switchboard
Geotechnical reassessment after demolition — Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil verified
Hold-point inspection after demolition before any footings poured
Contamination protocol if legacy fuel tanks, asbestos piping, or lead paint found
Northern Beaches Council R2 Low / R3 Medium (Manly, Dee Why, Brookvale, Mona Vale, Avalon town centres) / RU2 Rural Landscape (Ingleside, Terrey Hills, Duffys Forest, Oxford Falls) / E3/E4 Environmental on bushland fringe compliance applied to new envelope, not old
Tree protection zones and neighbour impact assessed per DCP

How It Works

From First Call to Final Key

Free site inspection of your Allambie Heights property. We check lot dimensions, Northern Beaches Council's planning controls, existing home condition, and potential asbestos. Written assessment with budget estimate within 5 business days.

KDR is the chance to get the design right — the new build doesn't have to mimic the original layout. We start from your block's strengths (orientation, slope, views) and your family's brief, then design the home the original lot always deserved.

Licensed demolition of existing 1960s–1980s + 2010s+ premium replacements-era dwelling. Asbestos removal by certified contractors (if present). Site cleared, levelled, and ready for new slab. Typically 1–2 weeks.

Your new home goes up on the cleared site. Engineered slab sized for Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil, frame, roof, fit-out, kitchen, bathrooms, flooring, painting, driveway, and landscaping. Quality inspections at every stage.

Handover pack: OC, structural certificates, BASIX, appliance manuals and warranties, paint colour schedule, maintenance plan, and the keys. Six-year structural warranty kicks in from OC date — keep the documentation safe for any future sale.

Quality Promise

Allambie Heights knockdown rebuild done cleanly: licensed demolition, compliant slab, new home built to NCC 2025. Fixed-price contract.

Fixed-price KDR constructionNCC 2025 and BASIX compliantFull Northern Beaches Council complianceLicensed demolition and asbestos removalWeekly progress updates6-year structural warranty

Cost Guide

ItemEstimated Range
Entry-level single storey KDR$530,000 – $720,000
Mid-range double storey KDR$790,000 – $1,100,000
Architectural KDR$1,100,000 – $1,650,000
Luxury KDR (high-spec finishes)$1,650,000+

Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Ready to take the next step?

Free consultation — no obligation, no pressure.

Frequently Asked Questions

Google Reviews
5.0
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.

Fatima Al-Rashid

Liverpool, NSW

See all reviews on Google
Areas We Serve

We Build Across Sydney

Buildana builds across greater Sydney — with deep roots in Western Sydney's Fairfield, Liverpool, Cumberland, Canterbury-Bankstown, and Blacktown LGAs.

Book a Allambie Heights Knockdown Rebuild Assessment

Free KDR site assessment for Allambie Heights 2100. We'll assess your block, estimate cost, and provide a fixed-price budget.

Start Your Project