Knockdown Rebuild Davidson — House Demolition to Keys

One agreement in Davidson 2085: demolition, asbestos removal, site preparation, design, approvals, engineering, the new home and the occupation certificate.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Knockdown rebuild in Davidson. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs. Northern Beaches Council approval by CDC or DA.

Davidson Knockdown Rebuilds

A knockdown rebuild in Davidson is a bushland-edge project — 1960s to 1980s brick and contemporary on 600 to 1,000m² blocks backing Garigal National Park. The generous blocks suit a substantial rebuild, with bushfire the defining design factor.

BAL-19 to Flame Zone applies on most lots, so the RFS Bushfire Protection Assessment is standard and the design meets its rating. The sandstone means deep rock excavation is typical, priced from a geotech bore.

The older homes can carry asbestos, so a licensed strip-out leads the demolition.

We rebuild under NSW contractor licence 487805C. Get our feasibility, with the bushfire and rock costed, before you commit.

Buildana manages the complete knockdown rebuild process in Davidson — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home designed for your Davidson block
  • Northern Beaches Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • Hawkesbury Sandstone — engineered slab design included
  • Typical blocks 600–1,000m² in Davidson
  • Single and two-storey designs available
  • Statutory home warranties
  • Free site assessment — near B-Line bus to CBD (Frenchs Forest interchange) station
Knockdown-rebuild project by Buildana in Davidson 2085
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

Bushfire is the defining factor

Davidson backs Garigal National Park, so BAL-19 to Flame Zone ratings apply on most lots and the RFS Bushfire Protection Assessment is standard. The design meets its rating — materials, glazing, screening — designed in from the start.

On 600 to 1,000m² blocks, the bushfire-compliant design has room to work, and the quiet bush setting rewards it.

Deep rock, priced from the bore

The sandstone means deep rock excavation is typical, priced from a real geotech bore so it is in the fixed price.

The older homes can carry asbestos, so a licensed strip-out leads the demolition.

Knockdown-rebuild builder in Davidson — key facts

Suburb
Davidson, NSW 2085
Council / LGA
Northern Beaches Council (Northern Beaches)
Primary zoning
R2 Low
Typical lot size
600–1,000m²
Soil class
Hawkesbury Sandstone
Home era
1960s–1980s + premium contemporary
Typical price range
To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Demolition pre-approved to run alongside DA/CDC lodgement for the rebuild
Site cleared in one mobilisation, with one crew
Northern Beaches Council CDC pathway where the design complies with the Codes SEPP — a CDC must be decided within 20 days where neighbours are notified (10 days otherwise)
DA pathway if the envelope sits outside the Codes SEPP, flagged up-front — a DA has a 40-day assessment period
Construction programmed slab-to-keys — for context, the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Demolition and rebuild sequenced so trades arrive without idle waiting

How It Works

From First Call to Final Key

Site visit covers everything that affects the build cost: vehicle access for trucks and crane, services (sewer depth, water connection, electrical service rating), soil exposure for borehole, neighbouring construction, and any obvious heritage or tree constraints. Real numbers, not estimates.

⏱

Architectural design for your replacement home, structural engineering for Class Hawkesbury Sandstone soil, BASIX certification, and all approval documentation. Lodged as CDC or DA depending on design.

⏱

Demolition time for a standard Davidson cottage depends on asbestos volume and whether the structure includes a brick chimney or solid-block walls. Asbestos work happens first under a controlled removal program before mechanical demo starts.

⏱

New home built from engineered slab (Class Hawkesbury Sandstone soil) to keys under a written contract, with milestone-based progress payments. Your project manager provides weekly updates.

⏱

Walk through your finished home on your original Davidson block. OC issued, all services live, NSW statutory warranties, appliance manuals, and maintenance schedule. Move in.

⏱

Quality Promise

Davidson knockdown rebuild done cleanly: licensed demolition, compliant slab, new home built to NCC 2025. Fixed-price contract.

Fixed-price contract once the design and scope are setNCC 2025 and BASIX compliantFull Northern Beaches Council complianceLicensed demolition and asbestos removalWeekly progress updatesStatutory home warranties

Cost Guide

ItemEstimated Range
Build rate (Rawlinsons Sydney, brick veneer, medium to high finish)$2,820–$4,250/m² + GST
Single storey or double storey KDR (build only)single storey $565k–$980k + GST, double storey $735k–$1.27M + GST
Architectural KDRPriced per design and specification
Luxury KDR (high-spec finishes)Priced on your selections

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

New Home in Davidson — KDR Consultation

Free KDR site assessment for Davidson 2085. We'll assess your block and talk through demolition, approvals and the build.

Start Your Project