Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

Knock Down Rebuild Builders Drummoyne — Demolition to Handover

NSW licensed builder for knockdown rebuilds in Drummoyne 2047: licensed asbestos removal and demolition, an engineered slab for the site, BASIX and NSW statutory warranties.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300

Knockdown Rebuild Builder in Drummoyne

A knockdown rebuild in Drummoyne is a premium project on the eastern peninsula closest to the city — Federation cottages, inter-war heritage and harbourside homes on 350 to 700m² blocks, with direct Sydney Harbour outlook and ferry access. A rebuild on a fall block designs a substantial home around a genuine harbour outlook.

The ground is Wianamatta Shale, so the slab is designed off a real geotech, and on the harbour-fall blocks retaining and stepped footings come into play. Heritage Conservation Areas cover several streets including parts of the Lyons Road peninsula, so a listed block goes down the DA path.

On the R3 land, a dual-occupancy can be worth costing where a block clears the 600m² minimum. The pre-war stock can carry asbestos and lead paint, so a licensed strip-out leads the demolition.

We rebuild under NSW contractor licence 487805C. Get our feasibility before you commit.

Buildana manages the complete knockdown rebuild process in Drummoyne — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home designed for your Drummoyne block
  • City of Canada Bay Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • M–H — engineered slab design included
  • Typical blocks 350–700m² in Drummoyne
  • Single and two-storey designs available
  • Statutory home warranties
  • Free site assessment — near Drummoyne ferry / Lilyfield Light Rail (across bridge) station
Drummoyne knockdown rebuild — 1900s–1940s + apartments home replaced with new build
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

A harbour peninsula near the city

Drummoyne is the eastern peninsula closest to the city, with Federation cottages and harbourside homes on 350 to 700m² blocks, direct Sydney Harbour outlook and ferry access. A rebuild on a fall block designs a substantial home around a genuine harbour outlook.

The city proximity and the harbour setting make a quality rebuild hold real value.

Shale, harbour fall and heritage

The ground is Wianamatta Shale, so the slab is designed off a real geotech, and on the harbour-fall blocks retaining and stepped footings come into play. Heritage Conservation Areas cover several streets including parts of the Lyons Road peninsula, so a listed block goes down the DA path.

On the R3 land, a dual-occupancy can be worth costing where a block clears the 600m² minimum. The pre-war stock can carry asbestos and lead paint, so a licensed strip-out leads the demolition.

Knockdown-rebuild builder in Drummoyne — key facts

Suburb
Drummoyne, NSW 2047
Council / LGA
City of Canada Bay Council (City of Canada Bay)
Primary zoning
R2 Low
Typical lot size
350–700m²
Soil class
M–H
Home era
1900s–1940s + apartments
Typical price range
To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Book a Drummoyne Knockdown Rebuild Assessment

Free KDR site assessment for Drummoyne 2047. We'll assess your block and talk through demolition, approvals and the build.

Start Your Project