Skip to content

We’re here to make it feel like home

Buildana construction project in Western Sydney

Hammondville Knockdown Rebuild — Stay on Your Street

Buildana handles KDR across Hammondville 2170. 1950s–1970s homes on 500–650m² blocks — we know the soil, the Liverpool City Council rules, and the neighbours' expectations.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

A knockdown rebuild in Hammondville costs $450,000–$1,200,000+. Standard single-storey from $450K, two-storey from $650K. Buildana manages demolition, Liverpool City Council approvals, and construction under one fixed-price contract.

Hammondville Knockdown Rebuilds

A knockdown rebuild in Hammondville is a clean play on the post-war and 1970s stock, on standard 500 to 650m² R2 blocks in a quiet pocket near Holsworthy station. Because the homes are that old, they are well past a sensible renovation, so a rebuild resets the property entirely.

The ground is Class H reactive clay, which needs a stiffened raft engineered off a real geotech. The post-war homes almost always carry asbestos, so a licensed strip-out and clearance certificate lead the demolition.

On the blocks closer to the Georges River, flood planning levels can set a minimum floor height, which I check for your block upfront. Hammondville is R2, so this is a single-home rebuild suburb.

We rebuild fixed-price, licence HBL 487805C. Get our knockdown rebuild feasibility before you commit.

Buildana manages the complete knockdown rebuild process in Hammondville — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home in Hammondville from $450K
  • Liverpool City Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • Class H soil — engineered slab design included
  • Typical blocks 500–650m² in Hammondville
  • Single and two-storey designs available
  • 6-year structural warranty
  • Free site assessment — near Holsworthy station
Knockdown-rebuild project by Buildana in Hammondville 2170
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

Old stock past renovating

Hammondville's post-war and 1970s homes are old enough that patching around them rarely makes sense. On a standard 500 to 650m² block near Holsworthy station, a rebuild resets the property into a modern home rather than pouring money into aged bones.

It is a quiet, small residential pocket where a well-built rebuild sits comfortably.

Reactive clay, asbestos and river flood

The Class H reactive clay means the new home needs a stiffened raft engineered off a real geotech. The post-war stock almost always carries asbestos, so a licensed strip-out and clearance certificate lead the demolition.

On blocks nearer the Georges River, flood planning levels can set a minimum floor height. I check the flood mapping upfront so it is designed in from the start.

Knockdown-rebuild builder in Hammondville — key facts

Suburb
Hammondville, NSW 2170
Council / LGA
Liverpool City Council (Liverpool City)
Primary zoning
R2 Low Density
Typical lot size
500–650m²
Soil class
Class H
Median house price
$900K–$1.1M
Home era
1950s–1970s
Typical price range
$450,000 – $1,200,000+
Typical timeline
14–22 months including demolition
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Free site assessment, fixed-price contract, line-itemised quote within 48 hours. No high-pressure sales — just a real builder talking real numbers.

The house fits how your family has actually grown — not how it was in 1978
Outdoor entertaining finally connects to the living area, not the laundry
Proper master suite with ensuite — a room, not a corner of the hallway
Kids get real bedrooms with space for study, not shoebox rooms with bunks
Energy bills drop because the new envelope is insulated, sealed and shaded properly
Garaging works with modern cars — no more reverse-parking a hatchback into a 1960s carport
Home finally matches the suburb you chose to live in

How It Works

From First Call to Final Key

We assess your Hammondville block — lot size (typical 500–650m²), R2 Low Density zoning, setbacks, FSR, and existing dwelling condition. Asbestos survey included.

Complete design package: floor plans, elevations, 3D renders, structural engineering, geotech, BASIX, stormwater, and all documentation Liverpool City Council requires. Approval managed start to finish.

Pre-demolition: dilapidation report on adjoining properties (protects you against unfounded damage claims), service disconnections, asbestos clearance, neighbour notification. Then 1–2 weeks of physical demolition with material sorted at site for recycling where possible.

Fixed-price construction: engineered slab, frame, lock-up, fit-out, external works. 8–12 months depending on size.

Same address, completely different home. Permanent gas, water, electrical, NBN reconnected and tested.

Quality Promise

Buildana handles Hammondville KDR end-to-end — old house out, new house in, one contract, one contractor, one defined timeline.

Fixed-price KDR constructionNCC 2025 and BASIX compliantFull Liverpool City Council complianceLicensed demolition and asbestos removalWeekly progress updates6-year structural warranty

Cost Guide

ItemEstimated Range
Demolish 1950s–1970s fibro → modern brick double storey$500,000 – $970,000
Demolish brick veneer → new brick veneer (like-for-like uplift)$470,000 – $820,000
Demolish to downsize (smaller footprint)$450,000 – $700,000
Demolish to upsize (growing family)$680,000 – $1,160,000
Demolish older home, rebuild investment-grade$540,000 – $870,000

Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Book a Hammondville Knockdown Rebuild Assessment

Free KDR site assessment for Hammondville 2170. We'll assess your block, estimate cost, and provide a fixed-price budget.

Start Your Project