Skip to content

We’re here to make it feel like home

Buildana construction project in Western Sydney

Knockdown Rebuild Henley — From $450K All-In

Fixed-price knockdown rebuild in Henley 2111. Demolition, new home, all Hunters Hill Council approvals under one contract. No surprises, no variation trail.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

A knockdown rebuild in Henley costs $450,000–$1,200,000+. Standard single-storey from $450K, two-storey from $650K. Buildana manages demolition, Hunters Hill Council approvals, and construction under one fixed-price contract.

Henley Knockdown Rebuilds

A knockdown rebuild in Henley depends heavily on your street, because this small Parramatta River foreshore suburb of Hunters Hill has Heritage Conservation Areas over most streets. On a heritage-listed street, demolition is restricted and a sensitive restoration is the path. On the rare non-heritage block, a rebuild on the river fall is a play, but the deep rock makes it a considered, higher-cost job.

The sandstone-dominant ground means deep rock excavation on the new slab and footings, and the substantial fall to the river drives real engineering. Where the older home carries asbestos in later additions, a licensed strip-out and clearance certificate lead the demolition. The heritage layer is the first check.

What I check first on your Henley knockdown rebuild: whether you sit inside a Heritage Conservation Area where demolition is restricted, the depth to rock and the river fall, and asbestos in the demolition. Those decide the play.

We rebuild fixed-price, licence HBL 487805C. Get our knockdown rebuild feasibility before you commit.

Buildana manages the complete knockdown rebuild process in Henley — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home in Henley from $450K
  • Hunters Hill Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • Hawkesbury Sandstone bedrock — engineered slab design included
  • Typical blocks 500–1,200m² in Henley
  • Single and two-storey designs available
  • 6-year structural warranty
  • Free site assessment — near Wollstonecraft (5 km) station
Buildana knockdown-rebuild in Henley near Henley shops + Henley wharf + Parramatta River foreshore
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

Heritage covers most of Henley

Henley is a small Hunters Hill foreshore suburb with Heritage Conservation Areas over most streets, so on a contributing Federation or inter-war home demolition is restricted and a sensitive restoration is the path. A knockdown rebuild is off the table on the bulk of Henley blocks, and I would rather establish that from the heritage layer than have a rebuild refused.

On the rare non-heritage block, a rebuild designed to the Parramatta River outlook is a genuine play, but the deep rock makes it a considered, higher-cost job. So I check the heritage layer first.

Deep rock and river fall

The sandstone-dominant Henley ground means deep rock excavation on the new slab and footings is typical, priced from a real geotech rather than assumed, and the substantial fall to the river drives real structural design on any rebuild. Where the older home carries asbestos in later additions, a licensed strip-out and clearance certificate lead the demolition. I price the rock, the fall and the clearance from real assessments.

Knockdown-rebuild builder in Henley — key facts

Suburb
Henley, NSW 2111
Council / LGA
Hunters Hill Council (Hunters Hill Council)
Primary zoning
R2 Low Density
Typical lot size
500–1,200m²
Soil class
Hawkesbury Sandstone bedrock
Median house price
$3.5M–$6.5M typical heritage; $5.0M–$15M+ harbour-front Woolwich/Hunters Hill peninsula
Home era
1880s–1940s Federation/Victorian/inter-war heritage predominant
Typical price range
$450,000 – $1,200,000+
Typical timeline
14–22 months including demolition
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Free site assessment, fixed-price contract, line-itemised quote within 48 hours. No high-pressure sales — just a real builder talking real numbers.

Cost Guide

ItemEstimated Range
Single storey rebuild (150–200m²)$480,000 – $680,000
Double storey rebuild (200–300m²)$680,000 – $1,050,000
Premium rebuild (300m²+)$1,050,000+
Demolition (1880s–1940s Federation/Victorian/inter-war heritage predominant (Heritage Conservation Areas cover virtually entire LGA) + premium contemporary infill Henley home)$18,000 – $40,000
Asbestos removal (if present)$8,000 – $25,000
Service disconnections & reinstatement$3,000 – $8,000

Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.

How It Works

From First Call to Final Key

Everything that has to be right before we touch the ground. On-site assessment covers block measurements, soil conditions (Class Hawkesbury Sandstone bedrock), tree preservation checks, service locations, and asbestos identification on your 1880s–1940s Federation/Victorian/inter-war heritage predominant (Heritage Conservation Areas cover virtually entire LGA) + premium contemporary infill-era home. Clear feasibility report before you commit. Approval pathway gets locked at design stage based on FSR, height, setbacks, and any overlays. Most Henley KDRs go CDC for speed; we use DA when the design wants to push past complying development limits. Either way, all documentation prepared and lodged in-house.

The Henley construction phase. Fixed price, programmed, supervised. Existing home demolished by licensed contractors. Asbestos removed and disposed of to EPA standards. Services disconnected, site cleared and prepped for construction. Buildana manages all permits and logistics. Construction starts the week demolition finishes — no idle site, no momentum lost. Slab pour usually within the first month, frame stand soon after. From frame stand to handover runs 6–9 months for a typical Henley family home.

The job isn't done when the site's clean; it's done when you have keys, certificates and warranties. Final inspection, Occupation Certificate, 6-year structural warranty, keys, and maintenance guide. Services reconnected. Your new home near Henley shops + Henley wharf + Parramatta River foreshore.

The house fits how your family has actually grown — not how it was in 1978
Outdoor entertaining finally connects to the living area, not the laundry
Proper master suite with ensuite — a room, not a corner of the hallway
Kids get real bedrooms with space for study, not shoebox rooms with bunks
Energy bills drop because the new envelope is insulated, sealed and shaded properly
Garaging works with modern cars — no more reverse-parking a hatchback into a 1960s carport
Home finally matches the suburb you chose to live in

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Demolish and Rebuild in Henley

Free KDR site assessment for Henley 2111. We'll assess your block, estimate cost, and provide a fixed-price budget.

Start Your Project