
Licensed Knockdown Rebuild Builder Rodd Point
NSW licensed KDR specialist in Rodd Point 2046. Asbestos-accredited demolition, Class M–H (Wianamatta Shale) / H (river/bay fall) engineered slab, BASIX 2025, 6-year structural warranty on the new home.
Quick Answer
A knockdown rebuild in Rodd Point costs $450,000–$1,200,000+. Standard single-storey from $450K, two-storey from $650K. Buildana manages demolition, City of Canada Bay Council approvals, and construction under one fixed-price contract.
New Home on Your Rodd Point Block
KDR in Rodd Point is heritage-restricted — HCAs cover most streets. Where non-contributory replacement is viable, Wianamatta Shale soil. Demolition $35K–$70K. Realistic premium turnkey $1.7M–$3.2M for 280–450m² build. Pre-construction 6–8 months.
Most Rodd Point blocks run 400–700m² on Class M–H (Wianamatta Shale) / H (river/bay fall) ground. Knockdown rebuild on 1900s–1940s stock here usually pencils out better than deep renovation once you tally up structural, electrical, plumbing, insulation, and waterproofing upgrades against full replacement value. Median price band: $2.4M–$4.5M. Nearest rail is Drummoyne ferry (1 km).
Buildana manages the complete knockdown rebuild process in Rodd Point — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.
Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.
- New home in Rodd Point from $450K
- City of Canada Bay Council DA and CDC approvals managed
- Demolition and asbestos removal included
- Class M–H (Wianamatta Shale) / H (river/bay fall) soil — engineered slab design included
- Typical blocks 400–700m² in Rodd Point
- Single and two-storey designs available
- 6-year structural warranty
- Free site assessment — near Drummoyne ferry (1 km) station

Reviewed by Oliver Alameri
Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010
Why Knockdown Rebuild in Rodd Point?
Rodd Point is the small riverside enclave between Russell Lea and Drummoyne on Iron Cove — Federation cottages and inter-war heritage on 400–700m² blocks. Heritage Conservation Areas cover most streets. Wianamatta Shale soil. Premium for Iron Cove foreshore proximity.
Rodd Point's established streetscape and median house prices of $2.4M–$4.5M reflect a premium location within City of Canada Bay. Building costs sit above the metro average, offset by stronger capital growth and rental returns. Transport access via Drummoyne ferry (1 km) connects Rodd Point to the wider Sydney network. 1900s–1940s-era housing stock across Rodd Point is prime for knockdown rebuild — replacing dated layouts and materials with modern, NCC-compliant homes that maximise block potential. Class M–H (Wianamatta Shale) / H (river/bay fall) soil (moderately to highly reactive) is standard for Rodd Point — Buildana includes engineered slab design in every quote.
KDR in Canada Bay works inland village stock outside Heritage Conservation Areas — Concord, Five Dock, Russell Lea, Canada Bay, Wareemba and the inland portions of Mortlake and North Strathfield. Riverside heritage peninsulas (Abbotsford, Chiswick, Cabarita, parts of Drummoyne) are extension-restricted. Wianamatta Shale soil; rock excavation rare and shallow ($5K–$20K) on inland lots, deeper on sandstone-outcrop river-fall lots. Demolition $35K–$70K with asbestos prevalent in 50s–70s stock. Realistic premium turnkey $1.4M–$2.8M for 280–450m² build, peaking at $2.5M–$4.5M on river-fall premium blocks in Drummoyne and Abbotsford. Pre-construction 4–7 months.
Planning Controls — City of Canada Bay Council
Canada Bay LEP 2013 & Canada Bay DCP 2017. R2 Low Density covers most older residential streets: FSR 0.5–0.55:1, building height 8.5–9m, front setback 6–7.5m, landscaped area 35–40%. R3 Medium Density along Lyons Road, Great North Road, Concord Road and Parramatta Road permits FSR up to 0.85:1. R4 High Density and B4 Mixed Use concentrated on Rhodes peninsula (Rhodes Waterside, Concord Road towers), Concord West / North Strathfield station precincts, and Five Dock village (gearing up for Sydney Metro West 2030 — Five Dock station precinct already designated TOD). Heritage Conservation Areas cover the riverside peninsulas (Abbotsford, Chiswick, Cabarita, Mortlake, Drummoyne) plus pockets in Concord, Five Dock, Russell Lea, Wareemba, Rodd Point. Tree Preservation Order LGA-wide. Wianamatta Shale soil with sandstone outcrops on the river-fall peninsulas — fall to Parramatta River, Iron Cove, Hen and Chicken Bay, Canada Bay drives suspended slab engineering on premium river-fall lots. Five Dock Sydney Metro West (under construction, opening 2030) is the LGA's signature planning event — station-precinct overlay opens density bonuses inside 400m of Five Dock station. Rhodes peninsula has industrial-legacy soil contamination management protocols on remediated former Union Carbide site.
Knockdown-rebuild builder in Rodd Point — key facts
- Suburb
- Rodd Point, NSW 2046
- Council / LGA
- City of Canada Bay Council (City of Canada Bay)
- Primary zoning
- R2 Low / R3 Medium / R4 (Rhodes/Concord West)
- Typical lot size
- 400–700m²
- Soil class
- Class M–H (Wianamatta Shale) / H (river/bay fall)
- Median house price
- $2.4M–$4.5M
- Home era
- 1900s–1940s
- Typical price range
- $450,000 – $1,200,000+
- Typical timeline
- 14–22 months including demolition
- Approval pathway
- CDC where eligible or DA for complex sites
Building in Rodd Point — Local Context
Site & Ground Conditions in Rodd Point
Rodd Point sits on Class M–H (Wianamatta Shale) / H (river/bay fall) soil — moderately to highly reactive clay. For a knockdown rebuild, that rules out the cheapest off-the-shelf slab designs straight away. and pushes engineered footings into the $24,000–$42,000 range on most 400–700m² blocks here. Geotechnical testing isn't optional — every Buildana rebuild in Rodd Point starts with a borehole report so the slab and footings are sized to your actual block, not a generic spec. Skipping that step is how you end up with cracked cornices and sticking doors three years in. Drainage design matters too — overland flow paths on Rodd Point's topography can collect water against rear setbacks if the contour survey is sloppy.
What City of Canada Bay Council Wants to See
Approval in Rodd Point comes down to documentation quality. City of Canada Bay Council processes a high volume of residential applications, and the ones that get approved fast share three traits: clean drawings that show every required setback dimension on plan; a BASIX certificate that matches the actual specification (not a stand-in); and an engineering package sized correctly for the Class M–H (Wianamatta Shale) / H (river/bay fall) ground. We prepare every document at full lodgement standard the first time.
Realistic Budget for Rodd Point
For a knockdown rebuild in Rodd Point, the budget conversation starts with what you actually want versus what the site supports. Most quotes you'll get from volume builders strip out the things that matter on Class M–H (Wianamatta Shale) / H (river/bay fall) soil — engineered slab upgrade, decent waterproofing, real drainage design, BASIX-compliant glazing — and present them as variations after you sign. We don't do that. Buildana's contract is fixed-price including everything required to deliver a rebuild that complies with NCC 2025 on a 400–700m² block in Rodd Point.
Lifestyle Fit in Rodd Point
Rodd Point has a settled residential character. Drummoyne ferry (1 km) from the nearest station. Local landmark: Rodd Park & Iron Cove foreshore. For families knocking down and rebuilding here, the design considerations that matter day-to-day: orientation for natural light (north-facing living wherever the lot allows), separation between adult and kids' zones, a kitchen that opens to outdoor entertaining, garage size that fits a real family vehicle plus storage, and a layout that doesn't require renovating again in 10 years as the kids grow. Buildana designs for the long arc of how families actually use a home, not just the showroom photo.
Realistic Rodd Point Timeline
End-to-end timeline for a knockdown rebuild in Rodd Point, lodgement-realistic: 8-14 weeks for DA, depending on neighbour notification and any RFI rounds. Add 2-3 weeks for documentation pack assembly before lodgement (BASIX, geotech for Class M–H (Wianamatta Shale) / H (river/bay fall), contour survey, hydraulic). Add 1 week for Construction Certificate post-approval. Construction itself runs 8-14 months once you're on the ground. Buildana provides a dated programme in every contract, not a vague "12-18 months" range.
Builder's Take on Rodd Point
KDR maths in Rodd Point usually wins against deep renovation once renovation costs cross $300K. Below that, renovation is competitive. Above it, you're paying renovation pricing for a home that's still structurally 1970s. New build gives you 6-year warranty, NCC 2025 performance, and a genuine reset on property value.
Site contamination checks — tanks, asbestos pipework, lead paint — take 2–3 days and cost $1.5K–$3K. Worth doing before contract, not after demo starts. On older Rodd Point streets, legacy issues turn up often enough that we'd rather know before we sign.
Rodd Point vs Nearby Suburbs
Rodd Point vs nearby suburbs — key metrics for knocking down and rebuilding.
| Suburb | Median Price | Typical Lot | Soil Class | Era | Station |
|---|---|---|---|---|---|
| Rodd Point2046this suburb | $2.4M–$4.5M | 400–700m² | Class M–H (Wianamatta Shale) / H (river/bay fall) | 1900s–1940s | Drummoyne ferry (1 km) |
| Russell Lea2046 | $2.2M–$4M | 450–800m² | Class M–H (Wianamatta Shale) / H (river/bay fall) | 1900s–1940s | Drummoyne ferry (1.5 km) |
| Five Dock2046 | $2.0M–$3.8M | 450–800m² | Class M–H (Wianamatta Shale) / H (river/bay fall) | 1900s–1960s | Five Dock Metro (Sydney Metro West, opening 2030) |
| Drummoyne2047 | $2.5M–$6M | 350–700m² | Class M–H (Wianamatta Shale) / H (river/bay fall) | 1900s–1940s + apartments | Drummoyne ferry / Lilyfield Light Rail (across bridge) |
Median price, soil class, and lot size shape build feasibility and final cost. Buildana assesses every site against these and other constraints during the free feasibility stage.
Have a question about your project?
Talk to our team — free site assessment and fixed-price quote.
How It Works
From First Call to Final Key
Site visit covers everything that affects the build cost: vehicle access for trucks and crane, services (sewer depth, water connection, electrical service rating), soil exposure for borehole, neighbouring construction, and any obvious heritage or tree constraints. Real numbers, not estimates.
⏱Architectural design for your replacement home, structural engineering for Class M–H (Wianamatta Shale) / H (river/bay fall) soil, BASIX certification, and all approval documentation. Lodged as CDC (10–15 days) or DA (40–90 days) depending on design.
⏱Demolition runs 5–10 working days for a standard Rodd Point cottage — longer if asbestos volume is significant or the structure includes a brick chimney or solid-block walls. Asbestos work happens first under a controlled removal program before mechanical demo starts.
⏱New home built from engineered slab (Class M–H (Wianamatta Shale) / H (river/bay fall) soil) to keys — fixed-price, milestone-based progress payments. Your project manager provides weekly updates.
⏱Walk through your finished home on your original Rodd Point block. OC issued, all services live, 6-year structural warranty, appliance manuals, and maintenance schedule.
⏱Quality Promise
Every Buildana knockdown rebuild in Rodd Point is delivered under a fixed-price contract — site assessment through to defect-free handover.
Cost Guide
| Item | Estimated Range |
|---|---|
| Demolish 1900s–1940s fibro → modern brick double storey | $550,000 – $1,050,000 |
| Demolish brick veneer → new brick veneer (like-for-like uplift) | $500,000 – $890,000 |
| Demolish to downsize (smaller footprint) | $480,000 – $760,000 |
| Demolish to upsize (growing family) | $740,000 – $1,260,000 |
| Demolish older home, rebuild investment-grade | $590,000 – $950,000 |
Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.
Our Team
Oliver Alameri
Founder / Director / Builder · MPropDev · PhD Student
Ahmad Alameri
Accounts Manager
Claire Wendell
Project Manager
Estimate Your Build Cost
Use our free calculator to get an instant cost estimate for your project
Ready to take the next step?
Free consultation — no obligation, no pressure.
Frequently Asked Questions
“Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.”
Fatima Al-Rashid
Liverpool, NSW
We Build Across Sydney
Buildana builds across greater Sydney — with deep roots in Western Sydney's Fairfield, Liverpool, Cumberland, Canterbury-Bankstown, and Blacktown LGAs.
Last updated: 1 April 2026
Demolish and Rebuild in Rodd Point
Free KDR site assessment for Rodd Point 2046. We'll assess your block, estimate cost, and provide a fixed-price budget.
Start Your Project