Skip to content

We’re here to make it feel like home

Buildana construction project in Western Sydney

Licensed Knockdown Rebuild Builder Rodd Point

NSW licensed KDR specialist in Rodd Point 2046. Asbestos-accredited demolition, Class M–H engineered slab, BASIX 2025, 6-year structural warranty on the new home.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

A knockdown rebuild in Rodd Point costs $450,000–$1,200,000+. Standard single-storey from $450K, two-storey from $650K. Buildana manages demolition, City of Canada Bay Council approvals, and construction under one fixed-price contract.

New Home on Your Rodd Point Block

Straight up: knockdown rebuild in Rodd Point is a hard road. Heritage Conservation Areas cover most streets of this small Iron Cove enclave, and the 1900s to 1940s Federation and inter-war housing is precisely what those controls exist to keep. Canada Bay Council will resist demolition of contributory homes, and most homes here contribute. Buying in expecting a clean knockdown is buying a fight you will probably lose.

The workable paths are narrower but real, a non-contributory dwelling inside the HCA, or a rebuild that retains the front and reconstructs behind it. On 400 to 700m² blocks with a $2.4M to $4.5M median and Rodd Park at the end of the street, a heritage-sympathetic rebuild or major extension often delivers what owners actually wanted anyway. Verify your home's status before forming plans.

What I would check first on a Rodd Point block: whether your home is contributory or non-contributory, and if contributory, whether a retain-front-rebuild-behind path works. Those decide everything.

We build these fixed-price, licence HBL 487805C. We will pull the heritage mapping for your lot as step one.

Buildana manages the complete knockdown rebuild process in Rodd Point — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home in Rodd Point from $450K
  • City of Canada Bay Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • M–H — engineered slab design included
  • Typical blocks 400–700m² in Rodd Point
  • Single and two-storey designs available
  • 6-year structural warranty
  • Free site assessment — near Drummoyne ferry (1 km) station
Knockdown-rebuild project by Buildana in Rodd Point 2046
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

A hard road, said straight

Knockdown rebuild in Rodd Point is a hard road. Heritage Conservation Areas cover most streets of this small Iron Cove enclave, and the 1900s to 1940s Federation and inter-war housing is precisely what those controls exist to keep.

Canada Bay Council will resist demolition of contributory homes, and most homes here contribute. Buying in expecting a clean knockdown is buying a fight you will probably lose.

The workable paths

The paths that work are narrower but real: a non-contributory dwelling inside the HCA, or a rebuild that retains the front and reconstructs behind it.

On 400 to 700m² blocks with a $2.4M to $4.5M median and Rodd Park at the end of the street, a heritage-sympathetic rebuild or major extension often delivers what owners actually wanted anyway. Verify status first, and we pull the heritage mapping for your lot as step one.

Knockdown-rebuild builder in Rodd Point — key facts

Suburb
Rodd Point, NSW 2046
Council / LGA
City of Canada Bay Council (City of Canada Bay)
Primary zoning
R2 Low
Typical lot size
400–700m²
Soil class
M–H
Median house price
$2.4M–$4.5M
Home era
1900s–1940s
Typical price range
$450,000 – $1,200,000+
Typical timeline
14–22 months including demolition
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Free site assessment, fixed-price contract, line-itemised quote within 48 hours. No high-pressure sales — just a real builder talking real numbers.

New home on the same land — keep the suburb, keep the schools, keep the street
Faster than selling and rebuying in Rodd Point — and cheaper than two stamp duties
Single contract covers demolition and rebuild — one contractor, one timeline
Fixed-price inclusive of demolition, rubbish removal, asbestos — no surprise invoices
Modern NCC 2025 performance — 7-star NatHERS, BASIX 2025 compliant from day one
400–700m² block replanned for how you live now, not how 1970s Sydney lived
6-year structural warranty on the new home — same as a greenfield build
Property value reset to new-build benchmark in the suburb

How It Works

From First Call to Final Key

Site visit covers everything that affects the build cost: vehicle access for trucks and crane, services (sewer depth, water connection, electrical service rating), soil exposure for borehole, neighbouring construction, and any obvious heritage or tree constraints. Real numbers, not estimates.

Architectural design for your replacement home, structural engineering for Class M–H soil, BASIX certification, and all approval documentation. Lodged as CDC (10–15 days) or DA (40–90 days) depending on design.

Demolition runs 5–10 working days for a standard Rodd Point cottage — longer if asbestos volume is significant or the structure includes a brick chimney or solid-block walls. Asbestos work happens first under a controlled removal program before mechanical demo starts.

New home built from engineered slab (Class M–H soil) to keys — fixed-price, milestone-based progress payments. Your project manager provides weekly updates.

Walk through your finished home on your original Rodd Point block. OC issued, all services live, 6-year structural warranty, appliance manuals, and maintenance schedule.

Quality Promise

Every Buildana knockdown rebuild in Rodd Point is delivered under a fixed-price contract — site assessment through to defect-free handover.

Fixed-price KDR constructionNCC 2025 and BASIX compliantFull City of Canada Bay Council complianceLicensed demolition and asbestos removalWeekly progress updates6-year structural warranty

Cost Guide

ItemEstimated Range
Demolish 1900s–1940s fibro → modern brick double storey$550,000 – $1,050,000
Demolish brick veneer → new brick veneer (like-for-like uplift)$500,000 – $890,000
Demolish to downsize (smaller footprint)$480,000 – $760,000
Demolish to upsize (growing family)$740,000 – $1,260,000
Demolish older home, rebuild investment-grade$590,000 – $950,000

Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Demolish and Rebuild in Rodd Point

Free KDR site assessment for Rodd Point 2046. We'll assess your block, estimate cost, and provide a fixed-price budget.

Start Your Project