Skip to content

We’re here to make it feel like home

Buildana construction project in Western Sydney

Licensed Knockdown Rebuild Builder Turramurra

NSW licensed KDR specialist in Turramurra 2074. Asbestos-accredited demolition, Class M engineered slab, BASIX 2025, 6-year structural warranty on the new home.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

A knockdown rebuild in Turramurra costs $450,000–$1,200,000+. Standard single-storey from $450K, two-storey from $650K. Buildana manages demolition, Ku-ring-gai Council approvals, and construction under one fixed-price contract.

Turramurra Knockdown Rebuilds

A knockdown rebuild in Turramurra is a premium upper North Shore project — 700 to 1,100m² blocks holding 1920s to 1960s stock, much of it heritage, in the central village of upper Ku-ring-gai with a station on the T1 line. On the back-street blocks, a rebuild generally works with standard Council controls; nearer the village, heritage limits the options.

The Heritage Conservation Areas around the village restrict demolition on certain streets, so the first thing I check is whether your block sits inside one. Away from those, the back-street blocks generally allow a knockdown rebuild, and at Turramurra values a quality home holds up well.

The ground grades Class M on the ridge with Class E pockets near the drainage lines, so the slab is designed off a real geotech. The pre-war stock almost always carries asbestos and can carry lead paint, so a licensed strip-out leads the demolition.

We rebuild fixed-price, licence HBL 487805C. Get our knockdown rebuild feasibility, with the heritage checked, before you commit.

Buildana manages the complete knockdown rebuild process in Turramurra — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home in Turramurra from $450K
  • Ku-ring-gai Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • Class M soil — engineered slab design included
  • Typical blocks 700–1,100m² in Turramurra
  • Single and two-storey designs available
  • 6-year structural warranty
  • Free site assessment — near Turramurra station
KDR on a 700–1,100m² block in Turramurra — demolition plus new home
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

Heritage near the village, KDR on the back streets

Turramurra is the central village of upper Ku-ring-gai, with a T1 station and Heritage Conservation Areas around the village that restrict demolition on certain streets. The first thing I check is whether your block sits inside one of those areas.

Away from them, the back-street blocks of 700 to 1,100m² generally allow a knockdown rebuild under standard Council controls, and a quality home holds its value in a suburb like this.

Ridge and drainage-line ground

The ground grades Class M on the ridge with Class E pockets near the drainage lines, so the slab is designed off a real geotech for your specific block — the E pockets need more careful footing design.

The pre-war stock almost always carries asbestos and can carry lead paint, so a licensed strip-out leads any demolition.

Knockdown-rebuild builder in Turramurra — key facts

Suburb
Turramurra, NSW 2074
Council / LGA
Ku-ring-gai Council (Ku-ring-gai)
Primary zoning
R2 Low Density
Typical lot size
700–1,100m²
Soil class
Class M
Median house price
$2.8M–$4.2M
Home era
1920s–1960s
Typical price range
$450,000 – $1,200,000+
Typical timeline
14–22 months including demolition
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Free site assessment, fixed-price contract, line-itemised quote within 48 hours. No high-pressure sales — just a real builder talking real numbers.

Demolition pre-approved to run alongside DA/CDC lodgement for the rebuild
Site cleared in 5–10 business days — one mobilisation, one crew
Ku-ring-gai Council CDC pathway 10–15 business days where design complies with SEPP
DA pathway 40–90 days if envelope sits outside Codes SEPP — flagged up-front
Construction programme 24–40 weeks slab-to-keys for standard rebuild
Demolition and rebuild sequenced so trades arrive without idle waiting

How It Works

From First Call to Final Key

Everything that has to be right before we touch the ground. KDR feasibility is two questions: what can the block legally support, and is it cheaper to build new than fix old. We answer both in writing within a week, with cost ranges grounded in current Turramurra market data — not generic Sydney averages. New home designed for your Turramurra block — maximising FSR, orientation, and streetscape. Working drawings, engineering, and BASIX prepared. CDC or DA lodged with Ku-ring-gai Council.

The Turramurra construction phase. Fixed price, programmed, supervised. Full demolition management: asbestos survey report, licensed removal where required, structural demolition, site clearing, temporary fencing, and dust/noise management. Ku-ring-gai Council demolition permit obtained beforehand. Build sequence: site prep, slab pour, frame stand, roof, brickwork, lock-up, plumbing and electrical rough-in, plaster, internal fit-out, kitchen install, tiling, flooring, painting, external works, final clean. Each stage signed off before payment release.

The job isn't done when the site's clean; it's done when you have keys, certificates and warranties. Defect-free handover inspection, OC issued, keys in hand. Permanent services reconnected, landscaping complete, 6-year structural warranty, and full maintenance guide provided.

Quality Promise

Turramurra KDR projects run on one contract: demolition, asbestos clearance, approvals, construction, handover. One builder accountable.

Fixed-price KDR constructionNCC 2025 and BASIX compliantFull Ku-ring-gai Council complianceLicensed demolition and asbestos removalWeekly progress updates6-year structural warranty

Cost Guide

ItemEstimated Range
Single storey rebuild (150–200m²)$600,000 – $860,000
Double storey rebuild (200–300m²)$860,000 – $1,320,000
Premium rebuild (300m²+)$1,320,000+
Demolition (1920s–1960s (heavy heritage stock) Turramurra home)$23,000 – $50,000
Asbestos removal (if present)$10,000 – $32,000
Service disconnections & reinstatement$4,000 – $10,000

Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Demolish and Rebuild in Turramurra

Free KDR site assessment for Turramurra 2074. We'll assess your block, estimate cost, and provide a fixed-price budget.

Start Your Project