We’re here to make it feel like home

Knockdown rebuild site, established Sydney suburb
Cromer 2099 · Northern Beaches

Cromer Home Builder — Custom Homes, KDR, Duplex

Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · Northern Beaches DA and CDC pathways

Hawkesbury Sandstone with rock excavation typical. Quiet residential.

NSW Planning has nominated 9 Low and Mid-Rise areas in Northern Beaches. Whether a Cromer lot can use the state's dual occupancy standards depends on its walking distance from one and on the exclusions.

Council

Northern Beaches

Postcode

2099

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

DA assessment period

40 days (statutory)

Duplex minimum lot

Check the LEP

Low and Mid-Rise areas

9 nominated

Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.

Builder perspective

Building in Cromer: what gets checked first

Cromer shares Northern Beaches's planning controls with Beacon Hill and Narraweena, but each lot still has to be read on its own. Northern Beaches assesses a development application on its merits, and a DA has a 40-day assessment period; a design that meets every code standard can go the complying development route instead. A knockdown rebuild suits a house whose structure, layout or condition no longer justifies renovating; demolition, asbestos and site costs sit on top of the build price. If the existing house was built before 1990 it may contain asbestos; a licensed assessor confirms what's there, and a licensed removalist takes it out before demolition. Buildana's price comes after the plans, engineering and site checks, as a written contract with an inclusions schedule, so the number reflects the actual lot. Send through a Cromer address and Oliver will read the title, zoning and planning certificate before any design conversation starts.

OA

Oliver Alameri — Founder & licensed builder

Licence 487805C · 15+ years' building experience

Talk to Oliver

Cromer build context

What's known for Cromer, and the document that confirms each lot-specific fact before a price.

Council

Northern Beaches Council

Postcode

2099

Nearest station

B-Line bus to CBD (Brookvale interchange)

Local landmark

Cromer Industrial Estate + Narrabeen Lagoon proximity

Zoning

Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer

Lot area and frontage

Title plan, or a detail survey

Site classification (AS 2870)

Geotechnical report for the lot

Age of the house

Built before 1990? Asbestos inspection before demolition

Duplex minimum lot

Lot size map in the council's LEP

Low and Mid-Rise area

Walking distance to a nominated area, measured for the lot

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Why owners build with Buildana in Cromer

What every Buildana job includes, written down.

  • Licensed NSW builder (licence 487805C): the price comes as a written contract with an inclusions schedule, after plans, engineering and site checks.
  • Northern Beaches pathway explained plainly: a CDC from a certifier or the council if the design complies, a DA if it doesn't.
  • Oliver coordinates the surveyor, geotechnical and structural engineers, BASIX assessor and certifier, so the documents arrive in the right order.
  • Asbestos is identified before demolition, not discovered during it: pre-1990 houses are inspected and licensed removalists do the work.
  • Build rates come from the Rawlinsons construction handbook, escalated with the ABS house construction price index, not a guess.
  • Anchored on the amanah principle: keeping the word given. Local landmark: Cromer Industrial Estate + Narrabeen Lagoon proximity. Nearest station: B-Line bus to CBD (Brookvale interchange).

Cromer build costs from published rates

Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a Cromer lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.

Build typePublished rateBasis
Custom home, per m²$2,820–$4,250/m² + GSTRawlinsons individual house, brick veneer, medium to high finish.
Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²)single storey $565k–$980k + GST, double storey $735k–$1.27M + GSTAt $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra.
Duplex, attached four-bedroom pair$1.4M–$1.7M + GSTBoth dwellings, before site costs and subdivision.
Ground-floor addition, per m²$2,360–$2,840/m² + GSTRawlinsons ground floor addition, framed to brick veneer.
First-floor addition, per m²$3,790–$4,230/m² + GSTRawlinsons full first floor addition.
New bathroom in an addition$34k–$38k + GSTRawlinsons bathroom fit-out and services, each.
New kitchen in an addition$28k–$32k + GSTRawlinsons kitchen fit-out and services, each.
Granny flatFrom the catalogue price of the design you choose, plus site costsCatalogue designs carry their own published price.

Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.

Free Cromer feasibility

Thinking about building in Cromer? Start with the lot, not a sales pitch.

Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.

Written contract with an inclusions schedule Licence 487805C Northern Beaches DA and CDC pathways explained

Buildana services in Cromer

Six services across Northern Beaches, each priced for the lot once plans, engineering and site checks are done.

Knockdown Rebuild

Knockdown rebuild in the right order: asbestos inspection, demolition, geotechnical report, slab design, then the build.

Cromer knockdown rebuild approach

Duplex

Duplex feasibility starts with zone, area, frontage and slope, read from the title and the planning certificate.

Cromer duplex approach

Granny Flat

Secondary dwellings under Housing SEPP 2021: complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m².

Cromer granny flat approach

Custom Home

Custom plans tailored to the land, orientation and budget, priced once the drawings and engineering are done.

Cromer custom home approach

Extension

A first-floor addition needs the original footings checked by an engineer, and that happens before the design is finalised.

Cromer extension approach

Renovation

Renovations scoped properly: waterproofing, electrical compliance and smoke alarms to current standards.

Cromer renovation approach

Approval pathway in Cromer

Council: Northern Beaches Council.

Northern Beaches administers local planning controls for Cromer, including setbacks, character provisions and heritage overlays. A certifier assesses a proposed rebuild or dual occupancy against the Codes SEPP and site exclusions before confirming CDC eligibility. Where complying development is unavailable, a DA may be required. Secondary dwellings are assessed under Housing SEPP 2021 and applicable complying-development standards; lot size and zoning alone do not guarantee approval.

CDC pathway

Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.

DA pathway

Northern Beaches merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.

Local duplex minimum

Check Northern Beaches Council's local environmental plan and its lot size maps for the lot.

As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).

Low and Mid-Rise areas in Northern Beaches

Balgowlah Stockland shopping centre, Dee Why town centre, Forestville town centre, Forestway shopping centre, Frenchs Forest Precinct (Warringah Road), Manly town centre, Manly Vale town centre, Mona Vale town centre, Warringah Mall shopping centre. Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Council rules compared

Granny flats

Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to Northern Beaches as a DA.

Cromer site considerations

The planning certificate for a Cromer address says whether the lot is flood affected, bush fire prone or in a heritage area. Each brings its own consultant (flood engineer, bush fire assessor, heritage advisor) and its own cost, confirmed before the contract.

Soil & footings

A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.

Demolition & asbestos

A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.

Flood, bushfire & heritage

These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.

What to check for a Cromer lot, and where

Cromer build FAQs

The questions that come up most often on a first Cromer site walk.

How long does a DA take with Northern Beaches?
NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through Northern Beaches or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in Northern Beaches's fees and charges.
What decides the site costs on a Cromer block?
The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by Northern Beaches's tree controls and an arborist, stormwater by Northern Beaches's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
How long does a custom home build take in Cromer?
The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a Cromer timeline is set once the design and the approval pathway are known.
Can I build a duplex in Cromer?
The local minimum lot size for a duplex is set in Northern Beaches Council's local environmental plan; the lot size map for the address shows it. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
What's the granny flat pathway in Cromer?
Secondary dwellings in Cromer are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with Northern Beaches. The title, overlays and current controls are checked with the certifier or Northern Beaches before design.
What soil class is typical in Cromer?
There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
What does it cost to knock down and rebuild in Cromer?
For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
Do you do extensions and renovations in Cromer?
Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.

Ready to talk about your Cromer build?

Oliver will respond within 4 working hours for a free initial conversation about your Cromer site, the Northern Beaches pathway and what it could cost to build.