Canada Bay 2046 · City of Canada Bay
Custom Home Builders Canada Bay
In Canada Bay, the DCP draws the front of a new home before anyone else does.
The City of Canada Bay's development control plan has a part written for single dwellings, and it is specific. It sets how far back the house sits, how the facade steps, where the garage can't go, how high the walls can rise toward the boundaries and how a neighbour's water view is weighed. Design to it from the first sketch and the house holds together. Design to it last and the drawings go round again.
Short answer
What controls shape a custom home in Canada Bay?
Part E of the City of Canada Bay DCP, read with the Canada Bay LEP 2013. It sets a front setback of at least 4.5 metres or the prevailing street setback, a height plane rising at 45 degrees from 5 metres above the boundaries, a two-storey limit, and rules for the facade and garage. The planning certificate adds any heritage or flood controls.
Written and reviewed by Oliver Alameri
Licensed builder, NSW Contractor Licence 487805C · Founder, Buildana
Fact-checked
The front setback comes from the street
Part E sets the front setback at a minimum of 4.5 metres or the prevailing street setback, whichever is greater. The prevailing setback is an average of the setbacks of five neighbouring houses on each side of yours. Council adds a note that in many places the front setback in Canada Bay is 7.5 metres or more, and that new houses there have to follow it.
Nothing much can sit in that front zone. Balconies, entry porches and verandahs aren't allowed to encroach on it. Eaves and awnings for weather protection can, but without supporting posts. On a corner lot or a lot with a road at the back, the DCP has its own rules for which frontage counts as the front.
So the first survey I order measures more than your lot. It picks up the front walls of the houses either side, because they set where your house begins. On a deep waterside lot that can move the whole footprint back, which changes the garden, the pool and the rear setback before a room is drawn.

A facade in two planes, and no garage in front
The DCP wants new houses to address the street, with a front door or a living room facing it and an entry you can see. Roller shutters, security bars and grilles aren't permitted on openings facing the street or public open space.
Then it asks for an articulated front. The facade is split into a primary plane and a secondary plane set back 1.5 metres behind it, and the DCP caps how much of the site frontage each can take. A garage can't be in the primary facade. The ground floor of the primary facade has to contain a habitable room with a window. Upper levels and balconies can't sit forward of the ground floor. An entry alcove doesn't count as articulation.
Roofs should follow the pitch, form and materials that the streetscape analysis identifies as predominant, although council may accept a lower pitch where it improves a neighbour's sun or views. Dormers are limited to 1.5 metres from base to ridge. Original verandahs and balconies are to be kept open, never enclosed.
- Front door or living room facing the street
- Secondary facade 1.5 metres behind the primary facade
- No garage in the primary facade
- A habitable room with a window on the ground floor of the primary facade
- No roller shutters or security grilles on street-facing openings

Planning a new home in Canada Bay?
Send the address and a photo of the street front. Oliver will respond within 4 working hours for a free initial conversation about where the house can sit and how it can meet the street.
0476 300 300Height: a 45-degree plane and two storeys
Section E4.4 sets two tests. A dwelling must sit under a building height plane that starts 5.0 metres above ground level at every boundary and rises over the site at 45 degrees. And a dwelling house is limited to two storeys, or one storey on an internal lot. Both sit alongside the height shown on the LEP's building height map.
The plane is what shapes the upper floor. Near the side boundaries, the top of an upper wall has to lean in or step back, so a second storey usually sits toward the middle of the lot with a lower edge on each side. Ceiling heights, roof pitch and the slab level all feed into it, and on a sloping lot the ground level at the boundary moves too.
One of the stated aims is to reduce the visual impact of new houses seen from the Parramatta River, as well as from parks and streets. On a waterside lot, the house is designed to be looked at from the water as much as from the street.
Under a 45-degree plane, the upper floor finds its own place on the lot.

Views: water first, then the icons
Section E3.2 sets out how council weighs views when a new house changes what a neighbour sees. Water views count for more than land views. Iconic views, such as the Harbour Bridge or the city skyline, count for more than views without them. A whole view, where you can see the line between land and water, counts for more than a partial one.
It also says which views get the most protection: those from the front and rear of a house, from a standing position, and from living areas, with kitchens valued highly. Side views and sitting views are often unrealistic to keep. Council assesses the impact in words, from negligible to devastating, rather than as a percentage.
The part that matters most for a design is this. If a view impact comes from breaking a control, even a moderate impact is unreasonable. A design that meets the controls, and is drawn with some skill, can often give you the same house with less effect on the neighbours.

Approval, the rates and the build
The Canada Bay LEP 2013 was gazetted on 19 July 2013 and holds the zoning, height and floor space maps. If the lot is zoned R1, R2, R3, R4 or RU5, is at least 200m² and 6m wide and isn't excluded, a one- or two-storey home that meets the Housing Code can be approved as complying development, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). Heritage or flood status can rule that out, and then it's a DA to the City of Canada Bay, where a DA has a 40-day assessment period. Council can act as principal certifier in Canada Bay and its other suburbs, or you can appoint a private certifier.
Rawlinsons gives four Sydney rates for an individual house. Medium finish is $2,820–$3,040/m² in brick veneer and $2,940–$3,170/m² in full brick. High finish in brick veneer is $3,940–$4,250/m². Prestige full brick with partial air-conditioning is $5,200–$5,600/m². All exclude GST and are escalated to the ABS September 2026 index.
For the build itself, the ABS average build for a new NSW house was 2.99 quarters in 2025-26. Demolition of an existing house, with an asbestos check first, and any piling or retaining near the water are priced from the survey and a geotechnical report.
What I check first on a Canada Bay lot
These set the footprint and the front of the house before the brief is designed in.
- 01
The prevailing street setback from the five houses either side
- 02
Corner, parallel-road or internal lot, and which frontage is the front
- 03
The 45-degree height plane at each boundary
- 04
Neighbours' water and iconic views from their living areas
- 05
Heritage and flood controls on the planning certificate
- 06
The finish level, written down before design
Custom homes in Canada Bay
Is Canada Bay a suburb or the council?
Both. Canada Bay 2046 is one of the City of Canada Bay's suburbs, alongside Abbotsford, Breakfast Point, Cabarita, Chiswick, Concord, Drummoyne, Five Dock, Rodd Point, Russell Lea and others. The same DCP applies across them.
How far back from the street will my house sit?
At least 4.5 metres, or further if the five houses on each side average more. Council notes that in many streets the setback is 7.5 metres or more.
Can I build three storeys?
Part E limits a dwelling house to two storeys, and one on an internal lot. The LEP height map and the 45-degree height plane apply as well.
Do you offer design and construct in Canada Bay?
Yes. One contract can cover the design, the approval and the build. Our Five Dock and Chiswick pages walk through what that contract covers and when you sign each part.
What does a new home cost to build in Canada Bay?
On Rawlinsons' Sydney figures, excluding GST, a medium-finish brick veneer house is $2,820–$3,040/m² and a prestige full brick house is $5,200–$5,600/m². The lot, the design and your selections move it from there, so there's no fixed price from a first conversation.
Sources and references
Costs are from the Rawlinsons handbook with the local cost index applied; rules and timeframes are checked against the sources below.
- City of Canada Bay
- Rawlinsons Australian Construction Handbook, Rawlhouse Publishing
- Environmental Planning and Assessment Act 1979 (NSW)
- State Environmental Planning Policy (Exempt and Complying Development Codes) 2008
- National Construction Code, ABCB
- Asbestos, SafeWork NSW
- Search heritage databases, NSW Environment and Heritage
- NSW Planning Portal Spatial Viewer (zoning, FSR and hazard maps)
- Australia Post postcode search
- BASIX, NSW Planning Portal
Start with the street and the setback
Tell me the address and the home you have in mind. Oliver will respond within 4 working hours for a free initial conversation.