Skip to content
Buildana construction project in Western Sydney

Home Renovation Narrabeen — Design, Selections, Build, Certification

Complete renovation service in Narrabeen 2101: scope, design, selections, asbestos assessment, Northern Beaches Council approval where required, structural works, fit-out, and final certification.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

A home renovation in Narrabeen costs $100,000–$500,000+. Kitchen from $30K, bathroom from $20K, full renovation from $150K. Buildana manages design, Northern Beaches Council approvals (where required), and construction under one fixed-price contract.

Renovating Homes in Narrabeen

Renovation on Narrabeen is mid-premium oceanfront/lagoon-edge — HCAs on older streets, Coastal Hazard, CASS on lagoon-edge, salt-grade specs. Realistic budget $300K–$700K (heritage); $500K–$1.5M premium oceanfront.

On the ground in Narrabeen (2101), the practical numbers shape every renovation. Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil — extremely reactive clay — pushes engineered foundation work into the $45,000–$80,000 bracket on most 450–800m² blocks. R2 Low / R3 Medium (Manly, Dee Why, Brookvale, Mona Vale, Avalon town centres) / RU2 Rural Landscape (Ingleside, Terrey Hills, Duffys Forest, Oxford Falls) / E3/E4 Environmental on bushland fringe zoning under Northern Beaches Council sets the building envelope, with R3 Medium Density pockets that open up dual occupancy options on qualifying lots. Median sale price across Narrabeen sits at $2.6M–$5.5M+ (oceanfront), which frames the build-versus-buy decision from the start. B-Line bus to CBD (Narrabeen interchange) station services the suburb, and that proximity affects everything from rental demand to construction site access.

Buildana manages the complete home renovation process in Narrabeen — from initial consultation and design through to approvals (where required) and fixed-price construction to handover. Your home, modernised.

Not sure whether to renovate or rebuild? Use our Renovation vs KDR Calculator or read the renovation vs knockdown rebuild comparison.

  • Home renovations in Narrabeen from $100K
  • Northern Beaches Council approvals managed (where required)
  • Kitchen, bathroom, and full-home renovations
  • 1920s–1960s heritage + premium contemporary-era homes — renovation specialists
  • Asbestos assessment and removal included
  • Staged renovation plans to minimise disruption
  • 6-year structural warranty on structural work
  • Free consultation — near B-Line bus to CBD (Narrabeen interchange) station
Renovated family home in Narrabeen, Northern Beaches, NSW
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

Why Renovate in Narrabeen?

Narrabeen is the oceanfront and lagoon-edge beach suburb — Federation beach houses, inter-war heritage, post-war brick and contemporary on 450–800m² blocks. Heritage Conservation Areas across the older streets. Coastal Hazard zone on direct beachfront. Narrabeen Lagoon coastal acid sulphate soils (CASS) on lagoon-edge lots. Hawkesbury Sandstone with rock excavation typical.

Narrabeen's rural-residential character and 450–800m² blocks set it apart from standard suburban development. R2 Low / R3 Medium (Manly, Dee Why, Brookvale, Mona Vale, Avalon town centres) / RU2 Rural Landscape (Ingleside, Terrey Hills, Duffys Forest, Oxford Falls) / E3/E4 Environmental on bushland fringe zoning means different controls apply — larger setbacks, on-site services, and site-specific engineering. Transport access via B-Line bus to CBD (Narrabeen interchange) connects Narrabeen to the wider Sydney network. Renovating 1920s–1960s heritage + premium contemporary-era homes in Narrabeen is a smart play when the structure is sound. Kitchen and bathroom upgrades typically return 60–80% of investment in added property value. Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil (extremely reactive) is standard for Narrabeen — Buildana includes engineered slab design in every quote.

Renovation on the Northern Beaches splits between heritage-grade restoration on the village cores (Manly, Fairlight, Balgowlah, Avalon, Bilgola Beach, Palm Beach, Whale Beach, Freshwater, Curl Curl, Collaroy, Narrabeen, Mona Vale, Newport heritage streets), Sydney School modernist restoration on Avalon/Bilgola/Whale Beach/Palm Beach mid-century stock (Walter Burley Griffin and contemporaries' legacy), and contemporary refresh across the post-war brick stock on inland Brookvale/Dee Why/Cromer/Narraweena/Beacon Hill/Allambie Heights/Wheeler Heights/Collaroy Plateau/North Manly/North Balgowlah/North Curl Curl. Federation, inter-war heritage, mid-century modernist beach-house and 1970s pole-house detail (timber lining boards, weatherboard cladding, exposed-beam ceilings, slate/terracotta roofing, sandstone walling, Sydney School geometry) Council expects retained on protected streets. Asbestos universal pre-1990. Hawkesbury Sandstone soil predominant — sandstone footing engineering on basement/structural renovations and rock excavation on extensions. Coastal Hazard zone restricts renovation scope altering footprint on direct oceanfront. Coastal salt-grade specifications mandate marine-grade fixings, sealed envelope, copper/zinc flashings on every coastal-facing renovation — spec premium $20K–$50K. Coastal acid sulphate soils (CASS) on lagoon margins drive specialist dewatering on basement/structural renovations. Bushfire-prone overlays drive specs on renovations exceeding 50% original floor area or altering envelope materially — BAL-29 minimum on most acreage; ember-screened openings and non-combustible cladding upgrades on BAL-FZ. RFS BPA routine. Tree Preservation Order strict — AS4970 root-zone protection plans routine. RU2 acreage renovations at Ingleside, Terrey Hills, Duffys Forest, Oxford Falls run premium homestead-grade work with bushfire spec compliance, AWTS reconfiguration where required, sandstone heritage detail. Apartment renovations dominant on Manly Corso R3/R4, Dee Why town-centre R4, Mona Vale R3/R4, Brookvale R3 stock — restricted by strata bylaws, common-property approval and common-wall restrictions. Realistic budget $200K–$500K full house refresh on inland mid-tier; $400K–$1.0M on premium suburban (Balgowlah, Forestville, Frenchs Forest, Bilgola Plateau); $600K–$1.8M heritage-grade restoration on Manly/Fairlight/Avalon/Newport/Mona Vale village cores; $1.0M–$3.0M+ Sydney School modernist or Federation heritage-grade restoration on Palm Beach/Whale Beach/Bilgola Beach/Avalon Beach direct waterfront; $400K–$1.5M on RU2 acreage homestead with bushfire specs; $180K–$450K apartment-scale.

Planning Controls — Northern Beaches Council

Northern Beaches LEP 2022 (consolidating the legacy Manly, Warringah and Pittwater LEPs) & Northern Beaches DCP. Post-2016 amalgamation LGA spanning the entire ocean-and-harbour peninsula from North Head to Barrenjoey — 252 km² with 36+ residential suburbs, four lagoons, the Garigal and Ku-ring-gai Chase National Parks, and the Pittwater estuary. R2 Low Density covers most residential streets: FSR 0.5–0.55:1, building height 8.5–9m, front setback 6–7.5m, landscaped area 40–60%, deep soil 25–35%. R3 Medium Density along Pittwater Road and around station precincts (no rail — B-Line bus equivalents at Manly, Brookvale, Dee Why, Collaroy, Narrabeen, Mona Vale interchange/terminus) permits FSR up to 0.9:1. R4 High Density and B4 Mixed Use concentrated on Manly town centre + the Corso, Dee Why town centre, Brookvale, Mona Vale town centre, Avalon village core. Northern Beaches DCP duplex minimum lot varies by precinct — 600m² (legacy Manly + Pittwater R2) to 700m² (legacy Warringah R2). RU2 Rural Landscape covers the rural acreage belt — Ingleside, Terrey Hills, Duffys Forest, Oxford Falls, parts of Belrose — restricting subdivision to 2ha+ minimum. E3 Environmental Management and E4 Environmental Living overlays on bushland-fringe lots backing Garigal NP, Ku-ring-gai Chase NP, Manly Dam Reserve and Narrabeen Lagoon catchment further restrict siting. Heritage Conservation Areas extensive — Manly heritage core (the Corso, Eastern Hill, North Head precinct), Fairlight, Balgowlah, Balgowlah Heights, Clontarf, Seaforth, Avalon village, Newport village, Mona Vale, Bilgola Beach cove, Whale Beach, Palm Beach village, Freshwater village (Duke Kahanamoku surfing precinct), Curl Curl heritage streets, Collaroy village, Narrabeen heritage streets. Aboriginal cultural heritage protocols apply across most sandstone country (extensive rock-art sites, middens, engravings) — pre-DA Aboriginal Cultural Heritage Assessment routine on bushland-fringe and waterfront sites. Tree Preservation Order LGA-wide and strict — Northern Beaches retains the most extensive remnant bushland of any Sydney LGA. Hawkesbury Sandstone soil predominant — deep rock excavation $40K–$200K+ is LGA-defining (the most rock-excavation territory of any Sydney LGA on a per-build basis). Class P/E coastal alluvial on Narrabeen Lagoon, Curl Curl Lagoon, Dee Why Lagoon, Manly Lagoon and Mona Vale Lagoon corridors — suspended slab + Class P/E footing engineering and dewatering required. Coastal acid sulphate soils (CASS) on lagoon margins drive specialist dewatering and acid neutralisation protocols. Coastal Hazard zones are LGA-defining — coastal erosion line affects Pittwater Road oceanfront properties at Collaroy, Narrabeen, Curl Curl, Dee Why, Mona Vale, Palm Beach (2016 storm event reset baselines on Collaroy/Narrabeen specifically; multiple oceanfront properties since required Council coastal-hazard reports for any DA). Bushfire-prone land overlays are LGA-defining — BAL ratings BAL-12.5 to BAL-FZ across virtually all bushland-fringe lots (Belrose, Davidson, Killarney Heights, Frenchs Forest, Forestville, Beacon Hill, Cromer, Allambie Heights, Oxford Falls, Terrey Hills, Duffys Forest, Ingleside, Bayview, Church Point, Avalon, Bilgola Plateau, Whale Beach, Palm Beach, Clareville, Newport bushland-fringe). RFS Bushfire Protection Assessment routine — non-combustible cladding, ember-screened openings, sprinklered eaves on BAL-FZ, Asset Protection Zone (APZ) 10–40m+ on most acreage. AWTS on-site sewer mandatory on RU2 acreage belt (no reticulated sewer on Ingleside/Terrey Hills/Duffys Forest/Oxford Falls). Sydney Drinking Water Catchment overlay on parts of Ingleside, Terrey Hills, Duffys Forest western edges and Pittwater foreshore — restricts AWTS dispersal field siting and adds NSW Health/WaterNSW referral. Riparian setbacks 10–60m on Narrabeen Lagoon, Curl Curl Lagoon, Dee Why Lagoon, Manly Lagoon, Mona Vale Lagoon, Pittwater foreshore, Cowan Creek tributaries, Middle Harbour and North Harbour. Foreshore Building Line restrictions on direct waterfront across Pittwater (Bayview, Church Point, Clareville, Avalon, Newport), Middle Harbour (Clontarf, Seaforth, Balgowlah Heights), North Harbour (Fairlight, Balgowlah Heights) and ocean cliffs (Manly, Freshwater, Curl Curl, Narrabeen, Mona Vale, Newport, Bilgola, Avalon, Whale Beach, Palm Beach). The LGA has no rail — B-Line bus is the primary spine (Mona Vale terminus through Warringah Mall Brookvale interchange to CBD via Mosman). Beaches Link Tunnel (under construction, opening 2028) is the LGA-defining infrastructure event — twin tunnels under Middle Harbour connecting Cammeray to Balgowlah/Seaforth with portals reshaping traffic and property values across Balgowlah, Balgowlah Heights, Seaforth, Manly Vale and Manly. Northern Beaches Hospital (opened 2018, Frenchs Forest) anchors LGA medical employment and drives granny flat hospital-staff demand on Frenchs Forest, Davidson, Allambie Heights, Forestville, Belrose. Manly Hospital site redevelopment under master plan. Mona Vale Hospital site (Northern Beaches Hospital amalgamation legacy) under redevelopment. Warriewood Valley Release Area is the LGA's only active master-planned new-release on R3/R4 medium-density 300–600m² lots. Ingleside Precinct master-plan rezoning (originally proposed for ~3,400 dwellings) under review/paused. The Corso, Manly is the heritage retail spine. Avalon, Newport, Mona Vale, Collaroy, Dee Why, Brookvale and Manly are the primary commercial centres. Premium clifftop ocean-view properties at Manly, Freshwater, Curl Curl, Avalon, Bilgola, Whale Beach, Palm Beach are among Australia's most expensive residential markets ($8M–$30M+ on Palm Beach alone).

Home renovation builder in Narrabeen — key facts

Suburb
Narrabeen, NSW 2101
Council / LGA
Northern Beaches Council (Northern Beaches)
Primary zoning
R2 Low / R3 Medium (Manly, Dee Why, Brookvale, Mona Vale, Avalon town centres) / RU2 Rural Landscape (Ingleside, Terrey Hills, Duffys Forest, Oxford Falls) / E3/E4 Environmental on bushland fringe
Typical lot size
450–800m²
Soil class
Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts
Median house price
$2.6M–$5.5M+ (oceanfront)
Home era
1920s–1960s heritage + premium contemporary
Typical price range
$30,000 – $500,000+
Typical timeline
3–8 months depending on scope
Approval pathway
Exempt development for cosmetic, CDC/DA for structural

Building in Narrabeen — Local Context

What Narrabeen Soil Means for Your Renovation

Most blocks across Narrabeen (2101) classify as Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts — extremely reactive clay. Translation for a renovation: foundation cost lands somewhere between $45,000–$80,000, depending on building footprint and how the engineer reads the borehole. Reactive soils move with seasonal moisture. A waffle pod alone won't cut it on a Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts site — you need stiffened edge beams, sometimes piered footings, and careful detailing around wet areas to stop differential movement showing up as cracking. Buildana includes the geotech report, structural engineering, and slab design in every quote. No site allowance, no provisional sum.

Northern Beaches Council & Approval Pathway

Narrabeen sits inside the Northern Beaches LGA, governed by Northern Beaches Council. For a renovation, the approval question is usually CDC vs DA. Renovations in Narrabeen usually need a full DA through Northern Beaches Council — typically 40–90+ days from lodgement, longer if neighbour notification triggers objections. Either way, we manage submission, RFIs, and re-lodgement in-house — you don't deal with the council.

Narrabeen Build Economics

Narrabeen sits in the $2.6M–$5.5M+ (oceanfront) price band, which is the framing for any renovation decision. On a 450–800m² block here, the build-versus-buy maths usually favours renovation when the structural envelope is sound and the work is cosmetic to mid-scope. Free Buildana feasibility runs the numbers against your actual block before any commitment.

Building to Suit Narrabeen

Narrabeen's R2 Low / R3 Medium (Manly, Dee Why, Brookvale, Mona Vale, Avalon town centres) / RU2 Rural Landscape (Ingleside, Terrey Hills, Duffys Forest, Oxford Falls) / E3/E4 Environmental on bushland fringe zoning, 450–800m² blocks, and 1920s–1960s heritage + premium contemporary housing stock set the design context. For a renovation, the practical implications: renovations of 1920s–1960s heritage + premium contemporary homes work when you keep what's worth keeping and replace decisively — half-measures on plumbing or wiring create problems in 5-10 years. Buildana's design phase resolves all of this before you commit to construction pricing.

Why Some Narrabeen Builds Stall

Builds in Narrabeen stall for predictable reasons. Lodgement defects (missing BASIX, wrong drawing scale, undeclared overlays). Soil surprises on Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts ground when the builder didn't commission a borehole upfront. Variation creep when the contract was light on inclusions. Trade scheduling gaps when the builder is over-committed across too many sites. Northern Beaches Council delays when neighbour objection triggers committee review. Buildana protects against each of these at contract stage — fully documented lodgement pack, geotech in the price, itemised inclusions instead of allowances, and a tight project-manager-to-job ratio that keeps trades moving.

Builder's Take on Narrabeen

Bathroom renovations in Narrabeen run $25K–$55K. Waterproofing failures are the most common defect in older 1920s–1960s heritage + premium contemporary bathrooms — AS 3740 compliance is non-negotiable. A cheap renovation that skips proper waterproofing costs $20K to fix two years later.

First question on any Narrabeen renovation: is the structure worth renovating? 1920s–1960s heritage + premium contemporary homes vary — some have good bones and need cosmetic lift, others are carrying termite damage, sagging floors, or obsolete wiring that makes deep renovation worse value than KDR. We do a structural inspection before quoting, not after the contract.

Narrabeen vs Nearby Suburbs

Narrabeen vs nearby suburbs — key metrics for renovating.

SuburbMedian PriceTypical LotSoil ClassEraStation
Narrabeen2101this suburb$2.6M–$5.5M+ (oceanfront)450–800m²Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1920s–1960s heritage + premium contemporaryB-Line bus to CBD (Narrabeen interchange)
North Narrabeen2101$2.6M–$5M+ (oceanfront)450–800m²Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1920s–1960s + premium contemporaryB-Line bus to CBD (Narrabeen interchange)
Collaroy2097$2.8M–$8M+ (oceanfront)450–900m²Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1920s–1960s heritage + premium contemporaryB-Line bus to CBD (Collaroy stop)
Warriewood2102$2.4M–$5M+ (oceanfront)300–800m² (master-planned + original)Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1920s–1960s heritage + 2010s+ master-planned + premium contemporaryB-Line bus to CBD (Mona Vale interchange)

Median price, soil class, and lot size shape build feasibility and final cost. Buildana assesses every site against these and other constraints during the free feasibility stage.

Have a question about your project?

Talk to our team — free site assessment and fixed-price quote.

Cost Guide

ItemEstimated Range
Cosmetic only (paint, floors, fittings)$17,000 – $57,000
Wet area renovation (kitchens, bathrooms)$57,000 – $210,000
Wet area + structural (wall removal)$210,000 – $440,000
Full renovation + electrical/plumbing upgrade$440,000 – $690,000
Heritage-sensitive full renovation$520,000 – $920,000

Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.

How It Works

From First Call to Final Key

A Narrabeen renovation starts with what's worth keeping. Character floorboards, structural brickwork, original joinery — if it earns its place, it stays. Everything else gets a hard look.

Design is pragmatic. Removing the right wall to open a kitchen, upgrading the bathroom to function properly, fixing the laundry that was an afterthought in 1975. Structural engineer signs off before anything load-bearing moves.

Construction runs in stages so you can live in the house for parts of it. Wet areas and kitchens get a clear programme — three weeks without a kitchen is normal; three months is someone else's job.

Handover is clean. New work tied into old work with matched finishes, defects fixed before you move back into the finished zones, warranty on all new work.

Existing structure assessment — Narrabeen homes of the 1920s–1960s heritage + premium contemporary
Renovation design and specification
Structural engineering where walls are removed or loaded
Waterproofing to AS 3740 — wet areas in Narrabeen Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts conditions
Kitchen and bathroom design and fit-out
Flooring, painting and joinery
Electrical upgrade where scope requires
Plumbing upgrade including rough-in relocation
Northern Beaches Council approvals where required (DA or CDC)
Final inspection and handover

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Ready to take the next step?

Free consultation — no obligation, no pressure.

Frequently Asked Questions

Google Reviews
5.0
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.

Fatima Al-Rashid

Liverpool, NSW

See all reviews on Google
Areas We Serve

We Build Across Sydney

Buildana builds across greater Sydney — with deep roots in Western Sydney's Fairfield, Liverpool, Cumberland, Canterbury-Bankstown, and Blacktown LGAs.

Renovate Your Home in Narrabeen

Free renovation consultation for Narrabeen 2101. We'll assess your home, design the renovation, and provide a fixed-price quote.

Start Your Project