Skip to content
Buildana construction project in Western Sydney

Home Renovation Palm Beach — Design, Selections, Build, Certification

Complete renovation service in Palm Beach 2108: scope, design, selections, asbestos assessment, Northern Beaches Council approval where required, structural works, fit-out, and final certification.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

A home renovation in Palm Beach costs $100,000–$500,000+. Kitchen from $30K, bathroom from $20K, full renovation from $150K. Buildana manages design, Northern Beaches Council approvals (where required), and construction under one fixed-price contract.

Renovating Homes in Palm Beach

Renovation across Palm Beach is heritage-grade restoration territory — extensive HCAs, BAL-19 to BAL-FZ, Coastal Hazard, very deep sandstone footing, Foreshore Building Line, Sydney School modernist legacy. Realistic budget $700K–$2M (heritage); $1.5M–$5M+ direct oceanfront/Pittwater.

Most Palm Beach blocks run 600–2,500m² on Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts ground. Renovation scope here is shaped by the existing structure — most 1920s–1960s heritage + Sydney School modernist + premium contemporary homes need wiring and plumbing modernisation alongside whatever cosmetic work you plan, so it's worth scoping the whole job at once rather than splitting into phases. Median price band: $8M–$30M+ (oceanfront/Pittwater). Nearest rail is B-Line bus terminus at Mona Vale (12 km, then connecting bus).

Buildana manages the complete home renovation process in Palm Beach — from initial consultation and design through to approvals (where required) and fixed-price construction to handover. Your home, modernised.

Not sure whether to renovate or rebuild? Use our Renovation vs KDR Calculator or read the renovation vs knockdown rebuild comparison.

  • Home renovations in Palm Beach from $100K
  • Northern Beaches Council approvals managed (where required)
  • Kitchen, bathroom, and full-home renovations
  • 1920s–1960s heritage + Sydney School modernist + premium contemporary-era homes — renovation specialists
  • Asbestos assessment and removal included
  • Staged renovation plans to minimise disruption
  • 6-year structural warranty on structural work
  • Free consultation — near B-Line bus terminus at Mona Vale (12 km, then connecting bus) station
Renovated family home in Palm Beach, Northern Beaches, NSW
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

Why Renovate in Palm Beach?

Palm Beach is Sydney's most exclusive oceanfront suburb — heritage beach houses, mid-century modernist (Sydney School architecture by Walter Burley Griffin and others), 1970s pole houses and contemporary on 600–2,500m² blocks with significant sandstone fall to the beach and Pittwater. BAL-19 to BAL-FZ on most lots. Heritage Conservation Areas across the village. Hawkesbury Sandstone with very deep rock excavation $80K–$200K+. Coastal Hazard zone on direct beachfront. Foreshore Building Line on Pittwater frontage. Australia's most expensive beach property market.

Palm Beach's rural-residential character and 600–2,500m² blocks set it apart from standard suburban development. R2 Low / R3 Medium (Manly, Dee Why, Brookvale, Mona Vale, Avalon town centres) / RU2 Rural Landscape (Ingleside, Terrey Hills, Duffys Forest, Oxford Falls) / E3/E4 Environmental on bushland fringe zoning means different controls apply — larger setbacks, on-site services, and site-specific engineering. Transport access via B-Line bus terminus at Mona Vale (12 km, then connecting bus) connects Palm Beach to the wider Sydney network. Renovating 1920s–1960s heritage + Sydney School modernist + premium contemporary-era homes in Palm Beach is a smart play when the structure is sound. Kitchen and bathroom upgrades typically return 60–80% of investment in added property value. Soil conditions in Palm Beach (Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts, extremely reactive) are factored into every Buildana foundation design.

Renovation on the Northern Beaches splits between heritage-grade restoration on the village cores (Manly, Fairlight, Balgowlah, Avalon, Bilgola Beach, Palm Beach, Whale Beach, Freshwater, Curl Curl, Collaroy, Narrabeen, Mona Vale, Newport heritage streets), Sydney School modernist restoration on Avalon/Bilgola/Whale Beach/Palm Beach mid-century stock (Walter Burley Griffin and contemporaries' legacy), and contemporary refresh across the post-war brick stock on inland Brookvale/Dee Why/Cromer/Narraweena/Beacon Hill/Allambie Heights/Wheeler Heights/Collaroy Plateau/North Manly/North Balgowlah/North Curl Curl. Federation, inter-war heritage, mid-century modernist beach-house and 1970s pole-house detail (timber lining boards, weatherboard cladding, exposed-beam ceilings, slate/terracotta roofing, sandstone walling, Sydney School geometry) Council expects retained on protected streets. Asbestos universal pre-1990. Hawkesbury Sandstone soil predominant — sandstone footing engineering on basement/structural renovations and rock excavation on extensions. Coastal Hazard zone restricts renovation scope altering footprint on direct oceanfront. Coastal salt-grade specifications mandate marine-grade fixings, sealed envelope, copper/zinc flashings on every coastal-facing renovation — spec premium $20K–$50K. Coastal acid sulphate soils (CASS) on lagoon margins drive specialist dewatering on basement/structural renovations. Bushfire-prone overlays drive specs on renovations exceeding 50% original floor area or altering envelope materially — BAL-29 minimum on most acreage; ember-screened openings and non-combustible cladding upgrades on BAL-FZ. RFS BPA routine. Tree Preservation Order strict — AS4970 root-zone protection plans routine. RU2 acreage renovations at Ingleside, Terrey Hills, Duffys Forest, Oxford Falls run premium homestead-grade work with bushfire spec compliance, AWTS reconfiguration where required, sandstone heritage detail. Apartment renovations dominant on Manly Corso R3/R4, Dee Why town-centre R4, Mona Vale R3/R4, Brookvale R3 stock — restricted by strata bylaws, common-property approval and common-wall restrictions. Realistic budget $200K–$500K full house refresh on inland mid-tier; $400K–$1.0M on premium suburban (Balgowlah, Forestville, Frenchs Forest, Bilgola Plateau); $600K–$1.8M heritage-grade restoration on Manly/Fairlight/Avalon/Newport/Mona Vale village cores; $1.0M–$3.0M+ Sydney School modernist or Federation heritage-grade restoration on Palm Beach/Whale Beach/Bilgola Beach/Avalon Beach direct waterfront; $400K–$1.5M on RU2 acreage homestead with bushfire specs; $180K–$450K apartment-scale.

Planning Controls — Northern Beaches Council

Northern Beaches LEP 2022 (consolidating the legacy Manly, Warringah and Pittwater LEPs) & Northern Beaches DCP. Post-2016 amalgamation LGA spanning the entire ocean-and-harbour peninsula from North Head to Barrenjoey — 252 km² with 36+ residential suburbs, four lagoons, the Garigal and Ku-ring-gai Chase National Parks, and the Pittwater estuary. R2 Low Density covers most residential streets: FSR 0.5–0.55:1, building height 8.5–9m, front setback 6–7.5m, landscaped area 40–60%, deep soil 25–35%. R3 Medium Density along Pittwater Road and around station precincts (no rail — B-Line bus equivalents at Manly, Brookvale, Dee Why, Collaroy, Narrabeen, Mona Vale interchange/terminus) permits FSR up to 0.9:1. R4 High Density and B4 Mixed Use concentrated on Manly town centre + the Corso, Dee Why town centre, Brookvale, Mona Vale town centre, Avalon village core. Northern Beaches DCP duplex minimum lot varies by precinct — 600m² (legacy Manly + Pittwater R2) to 700m² (legacy Warringah R2). RU2 Rural Landscape covers the rural acreage belt — Ingleside, Terrey Hills, Duffys Forest, Oxford Falls, parts of Belrose — restricting subdivision to 2ha+ minimum. E3 Environmental Management and E4 Environmental Living overlays on bushland-fringe lots backing Garigal NP, Ku-ring-gai Chase NP, Manly Dam Reserve and Narrabeen Lagoon catchment further restrict siting. Heritage Conservation Areas extensive — Manly heritage core (the Corso, Eastern Hill, North Head precinct), Fairlight, Balgowlah, Balgowlah Heights, Clontarf, Seaforth, Avalon village, Newport village, Mona Vale, Bilgola Beach cove, Whale Beach, Palm Beach village, Freshwater village (Duke Kahanamoku surfing precinct), Curl Curl heritage streets, Collaroy village, Narrabeen heritage streets. Aboriginal cultural heritage protocols apply across most sandstone country (extensive rock-art sites, middens, engravings) — pre-DA Aboriginal Cultural Heritage Assessment routine on bushland-fringe and waterfront sites. Tree Preservation Order LGA-wide and strict — Northern Beaches retains the most extensive remnant bushland of any Sydney LGA. Hawkesbury Sandstone soil predominant — deep rock excavation $40K–$200K+ is LGA-defining (the most rock-excavation territory of any Sydney LGA on a per-build basis). Class P/E coastal alluvial on Narrabeen Lagoon, Curl Curl Lagoon, Dee Why Lagoon, Manly Lagoon and Mona Vale Lagoon corridors — suspended slab + Class P/E footing engineering and dewatering required. Coastal acid sulphate soils (CASS) on lagoon margins drive specialist dewatering and acid neutralisation protocols. Coastal Hazard zones are LGA-defining — coastal erosion line affects Pittwater Road oceanfront properties at Collaroy, Narrabeen, Curl Curl, Dee Why, Mona Vale, Palm Beach (2016 storm event reset baselines on Collaroy/Narrabeen specifically; multiple oceanfront properties since required Council coastal-hazard reports for any DA). Bushfire-prone land overlays are LGA-defining — BAL ratings BAL-12.5 to BAL-FZ across virtually all bushland-fringe lots (Belrose, Davidson, Killarney Heights, Frenchs Forest, Forestville, Beacon Hill, Cromer, Allambie Heights, Oxford Falls, Terrey Hills, Duffys Forest, Ingleside, Bayview, Church Point, Avalon, Bilgola Plateau, Whale Beach, Palm Beach, Clareville, Newport bushland-fringe). RFS Bushfire Protection Assessment routine — non-combustible cladding, ember-screened openings, sprinklered eaves on BAL-FZ, Asset Protection Zone (APZ) 10–40m+ on most acreage. AWTS on-site sewer mandatory on RU2 acreage belt (no reticulated sewer on Ingleside/Terrey Hills/Duffys Forest/Oxford Falls). Sydney Drinking Water Catchment overlay on parts of Ingleside, Terrey Hills, Duffys Forest western edges and Pittwater foreshore — restricts AWTS dispersal field siting and adds NSW Health/WaterNSW referral. Riparian setbacks 10–60m on Narrabeen Lagoon, Curl Curl Lagoon, Dee Why Lagoon, Manly Lagoon, Mona Vale Lagoon, Pittwater foreshore, Cowan Creek tributaries, Middle Harbour and North Harbour. Foreshore Building Line restrictions on direct waterfront across Pittwater (Bayview, Church Point, Clareville, Avalon, Newport), Middle Harbour (Clontarf, Seaforth, Balgowlah Heights), North Harbour (Fairlight, Balgowlah Heights) and ocean cliffs (Manly, Freshwater, Curl Curl, Narrabeen, Mona Vale, Newport, Bilgola, Avalon, Whale Beach, Palm Beach). The LGA has no rail — B-Line bus is the primary spine (Mona Vale terminus through Warringah Mall Brookvale interchange to CBD via Mosman). Beaches Link Tunnel (under construction, opening 2028) is the LGA-defining infrastructure event — twin tunnels under Middle Harbour connecting Cammeray to Balgowlah/Seaforth with portals reshaping traffic and property values across Balgowlah, Balgowlah Heights, Seaforth, Manly Vale and Manly. Northern Beaches Hospital (opened 2018, Frenchs Forest) anchors LGA medical employment and drives granny flat hospital-staff demand on Frenchs Forest, Davidson, Allambie Heights, Forestville, Belrose. Manly Hospital site redevelopment under master plan. Mona Vale Hospital site (Northern Beaches Hospital amalgamation legacy) under redevelopment. Warriewood Valley Release Area is the LGA's only active master-planned new-release on R3/R4 medium-density 300–600m² lots. Ingleside Precinct master-plan rezoning (originally proposed for ~3,400 dwellings) under review/paused. The Corso, Manly is the heritage retail spine. Avalon, Newport, Mona Vale, Collaroy, Dee Why, Brookvale and Manly are the primary commercial centres. Premium clifftop ocean-view properties at Manly, Freshwater, Curl Curl, Avalon, Bilgola, Whale Beach, Palm Beach are among Australia's most expensive residential markets ($8M–$30M+ on Palm Beach alone).

Home renovation builder in Palm Beach — key facts

Suburb
Palm Beach, NSW 2108
Council / LGA
Northern Beaches Council (Northern Beaches)
Primary zoning
R2 Low / R3 Medium (Manly, Dee Why, Brookvale, Mona Vale, Avalon town centres) / RU2 Rural Landscape (Ingleside, Terrey Hills, Duffys Forest, Oxford Falls) / E3/E4 Environmental on bushland fringe
Typical lot size
600–2,500m²
Soil class
Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts
Median house price
$8M–$30M+ (oceanfront/Pittwater)
Home era
1920s–1960s heritage + Sydney School modernist + premium contemporary
Typical price range
$30,000 – $500,000+
Typical timeline
3–8 months depending on scope
Approval pathway
Exempt development for cosmetic, CDC/DA for structural

Building in Palm Beach — Local Context

Site & Ground Conditions in Palm Beach

Palm Beach sits on Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil — extremely reactive clay. For a renovation, that rules out the cheapest off-the-shelf slab designs straight away. and pushes engineered footings into the $45,000–$80,000 range on most 600–2,500m² blocks here. Geotechnical testing isn't optional — every Buildana renovation in Palm Beach starts with a borehole report so the slab and footings are sized to your actual block, not a generic spec. Skipping that step is how you end up with cracked cornices and sticking doors three years in. Drainage design matters too — overland flow paths on Palm Beach's topography can collect water against rear setbacks if the contour survey is sloppy.

Northern Beaches Planning Context

Northern Beaches has its own LEP and DCP layered over State planning controls. For renovating in Palm Beach, the practical impact: Northern Beaches Council's DCP sets local rules for streetscape character, materials palette in some precincts, vehicle crossover widths, and tree retention. R2 Low / R3 Medium (Manly, Dee Why, Brookvale, Mona Vale, Avalon town centres) / RU2 Rural Landscape (Ingleside, Terrey Hills, Duffys Forest, Oxford Falls) / E3/E4 Environmental on bushland fringe zoning on most Palm Beach blocks permits single dwellings, alterations, and additions. Buildana checks every overlay (heritage, bushfire, flood, acid sulfate soil, biodiversity) before quoting.

Realistic Budget for Palm Beach

For a renovation in Palm Beach, the budget conversation starts with what you actually want versus what the site supports. Most quotes you'll get from volume builders strip out the things that matter on Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil — engineered slab upgrade, decent waterproofing, real drainage design, BASIX-compliant glazing — and present them as variations after you sign. We don't do that. Buildana's contract is fixed-price including everything required to deliver a renovation that complies with NCC 2025 on a 600–2,500m² block in Palm Beach.

Lifestyle Fit in Palm Beach

Palm Beach has a settled residential character. B-Line bus terminus at Mona Vale (12 km, then connecting bus) from the nearest station. Local landmark: Palm Beach + Barrenjoey Lighthouse + The Boathouse Palm Beach + Pittwater–Palm Beach ferry. For families renovating here, the design considerations that matter day-to-day: orientation for natural light (north-facing living wherever the lot allows), separation between adult and kids' zones, a kitchen that opens to outdoor entertaining, garage size that fits a real family vehicle plus storage, and a layout that doesn't require renovating again in 10 years as the kids grow. Buildana designs for the long arc of how families actually use a home, not just the showroom photo.

Realistic Palm Beach Timeline

End-to-end timeline for a renovation in Palm Beach, lodgement-realistic: 8-14 weeks for DA, depending on neighbour notification and any RFI rounds. Add 2-3 weeks for documentation pack assembly before lodgement (BASIX, geotech for Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts, contour survey, hydraulic). Add 1 week for Construction Certificate post-approval. Construction varies by scope but most runs 2-6 months. Buildana provides a dated programme in every contract, not a vague "12-18 months" range.

Builder's Take on Palm Beach

The single biggest renovation timeline killer in Palm Beach is client indecision at selections stage. When tiles, tapware, and joinery aren't locked before site start, the build stops for weeks waiting on decisions. Buildana pushes hard for selections to be signed off pre-contract — that's where programmes hold or fail.

Kitchen renovations in Palm Beach typically run $35K–$80K end to end. What drives the range: cabinetry (stone vs laminate, matt vs gloss, soft-close vs basic), appliances ($8K–$25K), plumbing relocation ($3K–$10K), and electrical upgrades. Standard kitchens come in mid-range; premium "entertainer" kitchens push $80K+.

Palm Beach vs Nearby Suburbs

Palm Beach vs nearby suburbs — key metrics for renovating.

SuburbMedian PriceTypical LotSoil ClassEraStation
Palm Beach2108this suburb$8M–$30M+ (oceanfront/Pittwater)600–2,500m²Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1920s–1960s heritage + Sydney School modernist + premium contemporaryB-Line bus terminus at Mona Vale (12 km, then connecting bus)
Whale Beach2107$5M–$20M+ (oceanfront)600–2,000m²Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1920s–1960s heritage + Sydney School modernist + premium contemporaryB-Line bus terminus at Mona Vale (10 km, then connecting bus)
Avalon Beach2107$3.5M–$10M+ (clifftop/oceanfront)500–1,500m²Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1920s–1960s heritage + 1970s pole houses + contemporaryB-Line bus to CBD (Mona Vale interchange)

Median price, soil class, and lot size shape build feasibility and final cost. Buildana assesses every site against these and other constraints during the free feasibility stage.

Have a question about your project?

Talk to our team — free site assessment and fixed-price quote.

Cost Guide

ItemEstimated Range
Single-room renovation (bathroom, kitchen)$33,000 – $106,000
Multi-room (kitchen + 1 bathroom)$106,000 – $210,000
Full internal renovation (kitchen, bathrooms, floors)$210,000 – $420,000
Full home renovation (all wet areas + living zones)$420,000 – $790,000
Premium full renovation (high-spec finishes)$790,000+

Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.

How It Works

From First Call to Final Key

Everything that has to be right before we touch the ground. On-site meeting to walk through your Palm Beach home room by room. We identify what needs to change, what can stay, and where the budget delivers the most impact. Written scope and cost estimate within a week. Design includes selections for everything you'll touch: tapware, tiles, benchtops, splashbacks, joinery handles, paint colours, lighting, flooring. We lock these at design stage with cost-confirmed inclusions, not provisional sums that creep up during construction.

The Palm Beach construction phase. Fixed price, programmed, supervised. If your renovation involves structural work, we lodge DA or CDC with Northern Beaches Council. Most kitchen and bathroom renovations don't require approval. Buildana advises on what needs lodgement and what doesn't. Trade sequencing is the difference between a 6-week renovation and a 12-week one. Demo, structural, plumbing rough-in, electrical rough-in, plaster, waterproofing, tiling, joinery install, fit-off, paint — each trade in and out cleanly, no waiting on the next sub.

The job isn't done when the site's clean; it's done when you have keys, certificates and warranties. Final inspection, Occupation Certificate (if required), 6-year structural warranty on any structural work, and maintenance guide. Your Palm Beach home, transformed.

Scope lock-in at design stage — the biggest timeline risk isn't trades, it's client indecision
Cosmetic renovations (paint, floors, kitchen) typically 4–10 weeks
Full-home renovations (kitchen, bathrooms, living zones) 10–20 weeks
Northern Beaches Council CDC only where required — most cosmetic work doesn't need approval
DA only for structural change or heritage-affected homes
Trades sequenced to avoid idle crews and rework — pace is programmed, not hopeful

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Ready to take the next step?

Free consultation — no obligation, no pressure.

Frequently Asked Questions

Google Reviews
5.0
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.

Fatima Al-Rashid

Liverpool, NSW

See all reviews on Google
Areas We Serve

We Build Across Sydney

Buildana builds across greater Sydney — with deep roots in Western Sydney's Fairfield, Liverpool, Cumberland, Canterbury-Bankstown, and Blacktown LGAs.

Modernise Your Palm Beach Home

Free renovation consultation for Palm Beach 2108. We'll assess your home, design the renovation, and provide a fixed-price quote.

Start Your Project