Knockdown Rebuild Palm Beach — One Contract, Demo to Keys

Everything under one agreement in Palm Beach 2108: demolition, asbestos removal, site prep, design, approvals, engineering, new home construction, landscaping and Occupation Certificate.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

A knockdown rebuild in Palm Beach costs $450,000–$1,200,000+. Standard single-storey from $450K, two-storey from $650K. Buildana manages demolition, Northern Beaches Council approvals, and construction under one fixed-price contract.

New Home on Your Palm Beach Block

KDR in Palm Beach is Australia's most exclusive oceanfront — 600–2,500m², HCAs across the village, BAL-19 to BAL-FZ, Coastal Hazard zone, very deep sandstone rock excavation $80K–$200K+, Foreshore Building Line on Pittwater frontage. End values $8M–$30M+. Pre-construction 12–18 months.

Most Palm Beach blocks run 600–2,500m² on Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts ground. Knockdown rebuild on 1920s–1960s heritage + Sydney School modernist + premium contemporary stock here usually pencils out better than deep renovation once you tally up structural, electrical, plumbing, insulation, and waterproofing upgrades against full replacement value. Median price band: $8M–$30M+ (oceanfront/Pittwater). Nearest rail is B-Line bus terminus at Mona Vale (12 km, then connecting bus).

Buildana manages the complete knockdown rebuild process in Palm Beach — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home in Palm Beach from $450K
  • Northern Beaches Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil — engineered slab design included
  • Typical blocks 600–2,500m² in Palm Beach
  • Single and two-storey designs available
  • 6-year structural warranty
  • Free site assessment — near B-Line bus terminus at Mona Vale (12 km, then connecting bus) station
Palm Beach knockdown rebuild — 1920s–1960s heritage + Sydney School modernist + premium contemporary home replaced with new build
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

Why Knockdown Rebuild in Palm Beach?

Palm Beach is Sydney's most exclusive oceanfront suburb — heritage beach houses, mid-century modernist (Sydney School architecture by Walter Burley Griffin and others), 1970s pole houses and contemporary on 600–2,500m² blocks with significant sandstone fall to the beach and Pittwater. BAL-19 to BAL-FZ on most lots. Heritage Conservation Areas across the village. Hawkesbury Sandstone with very deep rock excavation $80K–$200K+. Coastal Hazard zone on direct beachfront. Foreshore Building Line on Pittwater frontage. Australia's most expensive beach property market.

Palm Beach's rural-residential character and 600–2,500m² blocks set it apart from standard suburban development. R2 Low / R3 Medium (Manly, Dee Why, Brookvale, Mona Vale, Avalon town centres) / RU2 Rural Landscape (Ingleside, Terrey Hills, Duffys Forest, Oxford Falls) / E3/E4 Environmental on bushland fringe zoning means different controls apply — larger setbacks, on-site services, and site-specific engineering. Transport access via B-Line bus terminus at Mona Vale (12 km, then connecting bus) connects Palm Beach to the wider Sydney network. 1920s–1960s heritage + Sydney School modernist + premium contemporary-era housing stock across Palm Beach is prime for knockdown rebuild — replacing dated layouts and materials with modern, NCC-compliant homes that maximise block potential. Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil (extremely reactive) is standard for Palm Beach — Buildana includes engineered slab design in every quote.

KDR in the Northern Beaches splits sharply by tier. The premium oceanfront and harbour-front tier — Manly, Freshwater, Curl Curl, Collaroy, Narrabeen, Mona Vale, Newport, Avalon Beach, Bilgola Beach, Whale Beach, Palm Beach (oceanfront); Clontarf, Seaforth, Balgowlah Heights, Fairlight (harbour-front); Bayview, Church Point, Clareville (Pittwater-front) — runs end values $4M–$15M+ on direct waterfront, $2.5M–$6M+ on premium suburban. Hawkesbury Sandstone soil predominant — deep rock excavation $40K–$200K+ is LGA-defining; the Northern Beaches has the most rock-excavation territory of any Sydney LGA on a per-build basis. Bushfire-prone overlays are LGA-defining — BAL-12.5 to BAL-FZ across virtually all bushland-fringe lots (Belrose, Davidson, Killarney Heights, Frenchs Forest, Forestville, Beacon Hill, Cromer, Allambie Heights, Bayview, Church Point, Avalon, Bilgola Plateau, Whale Beach, Palm Beach, Clareville). RFS Bushfire Protection Assessment routine — non-combustible cladding, ember-screened openings, sprinklered eaves on BAL-FZ adding $40K–$120K. Coastal Hazard zones drive coastal-engineering reports on Pittwater Road oceanfront properties at Collaroy, Narrabeen, Curl Curl, Dee Why, Mona Vale, Palm Beach (2016 storm event reset baselines on Collaroy/Narrabeen). Coastal salt-grade specs (marine-grade fixings, sealed envelope, copper/zinc flashings, treated-pine timber) standard on every coastal-facing build — add $20K–$60K material premium. Coastal acid sulphate soils (CASS) on lagoon margins (Narrabeen Lagoon, Curl Curl Lagoon, Dee Why Lagoon, Manly Lagoon, Mona Vale Lagoon) drive specialist dewatering and acid neutralisation protocols. Heritage Conservation Areas extensive across the older village cores. Tree Preservation Order LGA-wide and strict. Demolition $40K–$90K with asbestos universal pre-1990. RU2 acreage at Ingleside, Terrey Hills, Duffys Forest, Oxford Falls runs AWTS on-site sewer and Sydney Drinking Water Catchment overlay (parts) — premium acreage end values $3.5M–$8M+. Realistic premium turnkey $1.8M–$3.2M for 280–450m² inland mid-tier (Brookvale, Dee Why, Cromer, Narraweena, Beacon Hill, Allambie Heights, Wheeler Heights); $2.5M–$5M on premium suburban (Balgowlah, Fairlight, Manly Vale, Forestville, Frenchs Forest, Belrose, Davidson); $4M–$10M+ on oceanfront/harbour-front (Manly, Clontarf, Seaforth, Balgowlah Heights, Curl Curl, Freshwater, Collaroy, Mona Vale, Newport, Avalon); $6M–$20M+ on Palm Beach/Whale Beach/Bilgola Beach direct beachfront. Pre-construction 5–8 months suburban; 8–14 months on bushfire-prone, coastal hazard, RU2 acreage or heritage sites.

Planning Controls — Northern Beaches Council

Northern Beaches LEP 2022 (consolidating the legacy Manly, Warringah and Pittwater LEPs) & Northern Beaches DCP. Post-2016 amalgamation LGA spanning the entire ocean-and-harbour peninsula from North Head to Barrenjoey — 252 km² with 36+ residential suburbs, four lagoons, the Garigal and Ku-ring-gai Chase National Parks, and the Pittwater estuary. R2 Low Density covers most residential streets: FSR 0.5–0.55:1, building height 8.5–9m, front setback 6–7.5m, landscaped area 40–60%, deep soil 25–35%. R3 Medium Density along Pittwater Road and around station precincts (no rail — B-Line bus equivalents at Manly, Brookvale, Dee Why, Collaroy, Narrabeen, Mona Vale interchange/terminus) permits FSR up to 0.9:1. R4 High Density and B4 Mixed Use concentrated on Manly town centre + the Corso, Dee Why town centre, Brookvale, Mona Vale town centre, Avalon village core. Northern Beaches DCP duplex minimum lot varies by precinct — 600m² (legacy Manly + Pittwater R2) to 700m² (legacy Warringah R2). RU2 Rural Landscape covers the rural acreage belt — Ingleside, Terrey Hills, Duffys Forest, Oxford Falls, parts of Belrose — restricting subdivision to 2ha+ minimum. E3 Environmental Management and E4 Environmental Living overlays on bushland-fringe lots backing Garigal NP, Ku-ring-gai Chase NP, Manly Dam Reserve and Narrabeen Lagoon catchment further restrict siting. Heritage Conservation Areas extensive — Manly heritage core (the Corso, Eastern Hill, North Head precinct), Fairlight, Balgowlah, Balgowlah Heights, Clontarf, Seaforth, Avalon village, Newport village, Mona Vale, Bilgola Beach cove, Whale Beach, Palm Beach village, Freshwater village (Duke Kahanamoku surfing precinct), Curl Curl heritage streets, Collaroy village, Narrabeen heritage streets. Aboriginal cultural heritage protocols apply across most sandstone country (extensive rock-art sites, middens, engravings) — pre-DA Aboriginal Cultural Heritage Assessment routine on bushland-fringe and waterfront sites. Tree Preservation Order LGA-wide and strict — Northern Beaches retains the most extensive remnant bushland of any Sydney LGA. Hawkesbury Sandstone soil predominant — deep rock excavation $40K–$200K+ is LGA-defining (the most rock-excavation territory of any Sydney LGA on a per-build basis). Class P/E coastal alluvial on Narrabeen Lagoon, Curl Curl Lagoon, Dee Why Lagoon, Manly Lagoon and Mona Vale Lagoon corridors — suspended slab + Class P/E footing engineering and dewatering required. Coastal acid sulphate soils (CASS) on lagoon margins drive specialist dewatering and acid neutralisation protocols. Coastal Hazard zones are LGA-defining — coastal erosion line affects Pittwater Road oceanfront properties at Collaroy, Narrabeen, Curl Curl, Dee Why, Mona Vale, Palm Beach (2016 storm event reset baselines on Collaroy/Narrabeen specifically; multiple oceanfront properties since required Council coastal-hazard reports for any DA). Bushfire-prone land overlays are LGA-defining — BAL ratings BAL-12.5 to BAL-FZ across virtually all bushland-fringe lots (Belrose, Davidson, Killarney Heights, Frenchs Forest, Forestville, Beacon Hill, Cromer, Allambie Heights, Oxford Falls, Terrey Hills, Duffys Forest, Ingleside, Bayview, Church Point, Avalon, Bilgola Plateau, Whale Beach, Palm Beach, Clareville, Newport bushland-fringe). RFS Bushfire Protection Assessment routine — non-combustible cladding, ember-screened openings, sprinklered eaves on BAL-FZ, Asset Protection Zone (APZ) 10–40m+ on most acreage. AWTS on-site sewer mandatory on RU2 acreage belt (no reticulated sewer on Ingleside/Terrey Hills/Duffys Forest/Oxford Falls). Sydney Drinking Water Catchment overlay on parts of Ingleside, Terrey Hills, Duffys Forest western edges and Pittwater foreshore — restricts AWTS dispersal field siting and adds NSW Health/WaterNSW referral. Riparian setbacks 10–60m on Narrabeen Lagoon, Curl Curl Lagoon, Dee Why Lagoon, Manly Lagoon, Mona Vale Lagoon, Pittwater foreshore, Cowan Creek tributaries, Middle Harbour and North Harbour. Foreshore Building Line restrictions on direct waterfront across Pittwater (Bayview, Church Point, Clareville, Avalon, Newport), Middle Harbour (Clontarf, Seaforth, Balgowlah Heights), North Harbour (Fairlight, Balgowlah Heights) and ocean cliffs (Manly, Freshwater, Curl Curl, Narrabeen, Mona Vale, Newport, Bilgola, Avalon, Whale Beach, Palm Beach). The LGA has no rail — B-Line bus is the primary spine (Mona Vale terminus through Warringah Mall Brookvale interchange to CBD via Mosman). Beaches Link Tunnel (under construction, opening 2028) is the LGA-defining infrastructure event — twin tunnels under Middle Harbour connecting Cammeray to Balgowlah/Seaforth with portals reshaping traffic and property values across Balgowlah, Balgowlah Heights, Seaforth, Manly Vale and Manly. Northern Beaches Hospital (opened 2018, Frenchs Forest) anchors LGA medical employment and drives granny flat hospital-staff demand on Frenchs Forest, Davidson, Allambie Heights, Forestville, Belrose. Manly Hospital site redevelopment under master plan. Mona Vale Hospital site (Northern Beaches Hospital amalgamation legacy) under redevelopment. Warriewood Valley Release Area is the LGA's only active master-planned new-release on R3/R4 medium-density 300–600m² lots. Ingleside Precinct master-plan rezoning (originally proposed for ~3,400 dwellings) under review/paused. The Corso, Manly is the heritage retail spine. Avalon, Newport, Mona Vale, Collaroy, Dee Why, Brookvale and Manly are the primary commercial centres. Premium clifftop ocean-view properties at Manly, Freshwater, Curl Curl, Avalon, Bilgola, Whale Beach, Palm Beach are among Australia's most expensive residential markets ($8M–$30M+ on Palm Beach alone).

Knockdown-rebuild builder in Palm Beach — key facts

Suburb
Palm Beach, NSW 2108
Council / LGA
Northern Beaches Council (Northern Beaches)
Primary zoning
R2 Low / R3 Medium (Manly, Dee Why, Brookvale, Mona Vale, Avalon town centres) / RU2 Rural Landscape (Ingleside, Terrey Hills, Duffys Forest, Oxford Falls) / E3/E4 Environmental on bushland fringe
Typical lot size
600–2,500m²
Soil class
Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts
Median house price
$8M–$30M+ (oceanfront/Pittwater)
Home era
1920s–1960s heritage + Sydney School modernist + premium contemporary
Typical price range
$450,000 – $1,200,000+
Typical timeline
14–22 months including demolition
Approval pathway
CDC where eligible or DA for complex sites

Building in Palm Beach — Local Context

Site & Ground Conditions in Palm Beach

Palm Beach sits on Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil — extremely reactive clay. For a knockdown rebuild, that rules out the cheapest off-the-shelf slab designs straight away. and pushes engineered footings into the $45,000–$80,000 range on most 600–2,500m² blocks here. Geotechnical testing isn't optional — every Buildana rebuild in Palm Beach starts with a borehole report so the slab and footings are sized to your actual block, not a generic spec. Skipping that step is how you end up with cracked cornices and sticking doors three years in. Drainage design matters too — overland flow paths on Palm Beach's topography can collect water against rear setbacks if the contour survey is sloppy.

Northern Beaches Planning Context

Northern Beaches has its own LEP and DCP layered over State planning controls. For knocking down and rebuilding in Palm Beach, the practical impact: Northern Beaches Council's DCP sets local rules for streetscape character, materials palette in some precincts, vehicle crossover widths, and tree retention. R2 Low / R3 Medium (Manly, Dee Why, Brookvale, Mona Vale, Avalon town centres) / RU2 Rural Landscape (Ingleside, Terrey Hills, Duffys Forest, Oxford Falls) / E3/E4 Environmental on bushland fringe zoning on most Palm Beach blocks permits single dwellings, alterations, and additions. Buildana checks every overlay (heritage, bushfire, flood, acid sulfate soil, biodiversity) before quoting.

Realistic Budget for Palm Beach

For a knockdown rebuild in Palm Beach, the budget conversation starts with what you actually want versus what the site supports. Most quotes you'll get from volume builders strip out the things that matter on Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil — engineered slab upgrade, decent waterproofing, real drainage design, BASIX-compliant glazing — and present them as variations after you sign. We don't do that. Buildana's contract is fixed-price including everything required to deliver a rebuild that complies with NCC 2025 on a 600–2,500m² block in Palm Beach.

Lifestyle Fit in Palm Beach

Palm Beach has a settled residential character. B-Line bus terminus at Mona Vale (12 km, then connecting bus) from the nearest station. Local landmark: Palm Beach + Barrenjoey Lighthouse + The Boathouse Palm Beach + Pittwater–Palm Beach ferry. For families knocking down and rebuilding here, the design considerations that matter day-to-day: orientation for natural light (north-facing living wherever the lot allows), separation between adult and kids' zones, a kitchen that opens to outdoor entertaining, garage size that fits a real family vehicle plus storage, and a layout that doesn't require renovating again in 10 years as the kids grow. Buildana designs for the long arc of how families actually use a home, not just the showroom photo.

Realistic Palm Beach Timeline

End-to-end timeline for a knockdown rebuild in Palm Beach, lodgement-realistic: 8-14 weeks for DA, depending on neighbour notification and any RFI rounds. Add 2-3 weeks for documentation pack assembly before lodgement (BASIX, geotech for Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts, contour survey, hydraulic). Add 1 week for Construction Certificate post-approval. Construction itself runs 8-14 months once you're on the ground. Buildana provides a dated programme in every contract, not a vague "12-18 months" range.

Builder's Take on Palm Beach

Service abolishment and reinstatement in Palm Beach typically costs $3K–$8K. Sydney Water cap-off, Endeavour Energy disconnection, gas cap. Cheap KDR quotes often bundle this into "demolition" as a line item worth $1K — which is wrong and gets billed later.

The biggest surprise on KDR for clients is how much the new house improves the suburb feel. Same street, same neighbours, same kids' schools — but the house finally fits. Palm Beach residents who KDR rarely regret it; the ones who renovate instead often tell me they wish they'd gone the rebuild path.

Palm Beach vs Nearby Suburbs

Palm Beach vs nearby suburbs — key metrics for knocking down and rebuilding.

SuburbMedian PriceTypical LotSoil ClassEraStation
Palm Beach2108this suburb$8M–$30M+ (oceanfront/Pittwater)600–2,500m²Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1920s–1960s heritage + Sydney School modernist + premium contemporaryB-Line bus terminus at Mona Vale (12 km, then connecting bus)
Whale Beach2107$5M–$20M+ (oceanfront)600–2,000m²Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1920s–1960s heritage + Sydney School modernist + premium contemporaryB-Line bus terminus at Mona Vale (10 km, then connecting bus)
Avalon Beach2107$3.5M–$10M+ (clifftop/oceanfront)500–1,500m²Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts1920s–1960s heritage + 1970s pole houses + contemporaryB-Line bus to CBD (Mona Vale interchange)

Median price, soil class, and lot size shape build feasibility and final cost. Buildana assesses every site against these and other constraints during the free feasibility stage.

Have a question about your project?

Talk to our team — free site assessment and fixed-price quote.

Cost Guide

ItemEstimated Range
Entry-level single storey KDR$630,000 – $860,000
Mid-range double storey KDR$950,000 – $1,320,000
Architectural KDR$1,320,000 – $1,980,000
Luxury KDR (high-spec finishes)$1,980,000+

Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.

Demolition pre-approved to run alongside DA/CDC lodgement for the rebuild
Site cleared in 5–10 business days — one mobilisation, one crew
Northern Beaches Council CDC pathway 10–15 business days where design complies with SEPP
DA pathway 40–90 days if envelope sits outside Codes SEPP — flagged up-front
Construction programme 24–40 weeks slab-to-keys for standard rebuild
Demolition and rebuild sequenced so trades arrive without idle waiting

How It Works

From First Call to Final Key

Site visit covers everything that affects the build cost: vehicle access for trucks and crane, services (sewer depth, water connection, electrical service rating), soil exposure for borehole, neighbouring construction, and any obvious heritage or tree constraints. Real numbers, not estimates.

Architectural design for your replacement home, structural engineering for Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil, BASIX certification, and all approval documentation. Lodged as CDC (10–15 days) or DA (40–90 days) depending on design.

Demolition runs 5–10 working days for a standard Palm Beach cottage — longer if asbestos volume is significant or the structure includes a brick chimney or solid-block walls. Asbestos work happens first under a controlled removal program before mechanical demo starts.

New home built from engineered slab (Class Hawkesbury Sandstone predominant (deep rock excavation $40K–$150K+ on most lots) / Class P/E coastal alluvial on Narrabeen/Curl Curl/Dee Why/Manly/Mona Vale lagoon corridors / coastal acid sulphate soils (CASS) on lagoon margins / coastal hazard zones on Collaroy–Narrabeen, Curl Curl, Dee Why, Manly, Mona Vale, Palm Beach beachfronts soil) to keys — fixed-price, milestone-based progress payments. Your project manager provides weekly updates.

Walk through your finished home on your original Palm Beach block. OC issued, all services live, 6-year structural warranty, appliance manuals, and maintenance schedule. Move in.

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Ready to take the next step?

Free consultation — no obligation, no pressure.

Frequently Asked Questions

Google Reviews
5.0
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.

Fatima Al-Rashid

Liverpool, NSW

See all reviews on Google
Areas We Serve

We Build Across Sydney

Buildana builds across greater Sydney — with deep roots in Western Sydney's Fairfield, Liverpool, Cumberland, Canterbury-Bankstown, and Blacktown LGAs.

Knockdown Rebuild in Palm Beach

Free KDR site assessment for Palm Beach 2108. We'll assess your block, estimate cost, and provide a fixed-price budget.

Start Your Project