Skip to content

We’re here to make it feel like home

Buildana construction project in Western Sydney

Knockdown Rebuild Beverly Hills — Demo to Handover in 12 Months

Beverly Hills 2209 KDR with tight programme: demolition (3–4 weeks), new home (24–40 weeks). CDC fast-track or Georges River Council DA. Weekly progress updates.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

A knockdown rebuild in Beverly Hills costs $450,000–$1,200,000+. Standard single-storey from $450K, two-storey from $650K. Buildana manages demolition, Georges River Council approvals, and construction under one fixed-price contract.

Beverly Hills Knockdown Rebuilds

A knockdown rebuild in Beverly Hills is a solid station-suburb play — Federation cottages, inter-war heritage and 1960s-90s brick on 400 to 600m² R2 blocks with its own station and renewal already strong. The commuter convenience keeps demand genuine.

On the R2 streets, a rebuild resets a dated home. Along King Georges Road, the R3 can make medium-density the bigger play on qualifying blocks, and the 600m² duplex minimum puts a dual-occupancy in play on the larger lots.

The shale-sandstone interface means the slab is designed off a real geotech, and the pre-war stock carries asbestos and lead paint, so a licensed strip-out leads the demolition.

We rebuild fixed-price, licence HBL 487805C. Get our feasibility before you commit.

Buildana manages the complete knockdown rebuild process in Beverly Hills — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home in Beverly Hills from $450K
  • Georges River Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • M — engineered slab design included
  • Typical blocks 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) in Beverly Hills
  • Single and two-storey designs available
  • 6-year structural warranty
  • Free site assessment — near Beverly Hills station
KDR construction in Beverly Hills — R2 Low Density zoned
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

Station-side renewal

Beverly Hills' own station and the renewal already running make it a well-timed rebuild suburb. The aging Federation-to-brick stock on 400 to 600m² blocks suits a modern rebuild with the commuter convenience built in.

Along King Georges Road, the R3 can make medium-density the bigger play — I check first.

Interface ground and old stock

The shale-sandstone interface means the slab is designed off a real geotech. The pre-war stock carries asbestos and lead paint, so a licensed strip-out leads the demolition.

Both are in the feasibility and the fixed price.

Knockdown-rebuild builder in Beverly Hills — key facts

Suburb
Beverly Hills, NSW 2209
Council / LGA
Georges River Council (Georges River Council)
Primary zoning
R2 Low Density
Typical lot size
400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point)
Soil class
M
Median house price
$1.5M–$2.4M typical; $2.0M–$3.5M Oatley/Lugarno/Peakhurst Heights premium foreshore; $3.0M–$8.0M+ direct waterfront
Home era
1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs
Typical price range
$450,000 – $1,200,000+
Typical timeline
14–22 months including demolition
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Free site assessment, fixed-price contract, line-itemised quote within 48 hours. No high-pressure sales — just a real builder talking real numbers.

The house fits how your family has actually grown — not how it was in 1978
Outdoor entertaining finally connects to the living area, not the laundry
Proper master suite with ensuite — a room, not a corner of the hallway
Kids get real bedrooms with space for study, not shoebox rooms with bunks
Energy bills drop because the new envelope is insulated, sealed and shaded properly
Garaging works with modern cars — no more reverse-parking a hatchback into a 1960s carport
Home finally matches the suburb you chose to live in

How It Works

From First Call to Final Key

Site visit covers everything that affects the build cost: vehicle access for trucks and crane, services (sewer depth, water connection, electrical service rating), soil exposure for borehole, neighbouring construction, and any obvious heritage or tree constraints. Real numbers, not estimates.

Architectural design for your replacement home, structural engineering for Class M soil, BASIX certification, and all approval documentation. Lodged as CDC (10–15 days) or DA (40–90 days) depending on design.

Demolition runs 5–10 working days for a standard Beverly Hills cottage — longer if asbestos volume is significant or the structure includes a brick chimney or solid-block walls. Asbestos work happens first under a controlled removal program before mechanical demo starts.

New home built from engineered slab (Class M soil) to keys — fixed-price, milestone-based progress payments. Your project manager provides weekly updates.

Walk through your finished home on your original Beverly Hills block. OC issued, all services live, 6-year structural warranty, appliance manuals, and maintenance schedule. Move in.

Quality Promise

Every Buildana knockdown rebuild in Beverly Hills is delivered under a fixed-price contract — site assessment through to defect-free handover.

Fixed-price KDR constructionNCC 2025 and BASIX compliantFull Georges River Council complianceLicensed demolition and asbestos removalWeekly progress updates6-year structural warranty

Cost Guide

ItemEstimated Range
Entry-level single storey KDR$480,000 – $650,000
Mid-range double storey KDR$720,000 – $1,000,000
Architectural KDR$1,000,000 – $1,500,000
Luxury KDR (high-spec finishes)$1,500,000+

Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Knockdown Rebuild in Beverly Hills

Free KDR site assessment for Beverly Hills 2209. We'll assess your block, estimate cost, and provide a fixed-price budget.

Start Your Project