Knockdown Rebuild Beverly Hills — Demo to Handover in 12 Months
Beverly Hills 2209 KDR with tight programme: demolition (3–4 weeks), new home (24–40 weeks). CDC fast-track or Georges River Council DA. Weekly progress updates.
Quick Answer
A knockdown rebuild in Beverly Hills costs $450,000–$1,200,000+. Standard single-storey from $450K, two-storey from $650K. Buildana manages demolition, Georges River Council approvals, and construction under one fixed-price contract.
Beverly Hills Knockdown Rebuilds
Beverly Hills's 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs-era housing stock on 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) blocks makes the suburb a strong candidate for knockdown rebuild. Many older homes in Beverly Hills have reached the point where renovation costs approach or exceed the cost of a complete KDR — and a new build delivers a home designed exclusively for your lifestyle, built to current NCC standards. Georges River Council manages approvals across Georges River Council, and Buildana has deep experience with KDR projects in the area.
Practical realities of knocking down and rebuilding in Beverly Hills: Local services anchor around Beverly Hills shops + King Georges Road + Beverly Hills Park, which influences site access during construction (deliveries, cranage, skip placement). 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) blocks usually have enough room for proper site set-up, but tight battle-axe lots and narrow frontages need staging plans factored into the build program. Georges River Council processes a steady volume of residential applications — clean documentation moves fast, and Buildana lodges everything at full standard the first time. Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil (extremely reactive clay) sets foundation cost in the $45,000–$80,000 range; budget allocation for that line item is fixed in your contract, not estimated.
Buildana manages the complete knockdown rebuild process in Beverly Hills — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.
Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.
- New home in Beverly Hills from $450K
- Georges River Council DA and CDC approvals managed
- Demolition and asbestos removal included
- Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil — engineered slab design included
- Typical blocks 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) in Beverly Hills
- Single and two-storey designs available
- 6-year structural warranty
- Free site assessment — near Beverly Hills station

Reviewed by Oliver Alameri
Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010
Why Knockdown Rebuild in Beverly Hills?
Beverly Hills is the rail-line residential suburb between Hurstville and Kingsgrove — Federation cottages, inter-war heritage and 1960s–1990s brick on 400–600m² R2 blocks with R3 Medium Density along King Georges Road. Strong renewal activity.
Residential blocks of 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) across Beverly Hills (2209) provide solid building envelopes for a range of project types. Georges River Council manages planning controls with well-established DCP provisions. Direct rail access from Beverly Hills station adds genuine value to Beverly Hills property. 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs-era housing stock across Beverly Hills is prime for knockdown rebuild — replacing dated layouts and materials with modern, NCC-compliant homes that maximise block potential. Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil (extremely reactive) is standard for Beverly Hills — Buildana includes engineered slab design in every quote.
Knockdown-rebuild builder in Beverly Hills — key facts
- Suburb
- Beverly Hills, NSW 2209
- Council / LGA
- Georges River Council (Georges River Council)
- Primary zoning
- R2 Low Density / R3 Medium Density on station precincts / R4 (Hurstville CBD/Kogarah CBD high-rise + Beverly Hills/Penshurst/Mortdale precincts)
- Typical lot size
- 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point)
- Soil class
- Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works
- Median house price
- $1.5M–$2.4M typical; $2.0M–$3.5M Oatley/Lugarno/Peakhurst Heights premium foreshore; $3.0M–$8.0M+ direct waterfront
- Home era
- 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs
- Typical price range
- $450,000 – $1,200,000+
- Typical timeline
- 14–22 months including demolition
- Approval pathway
- CDC where eligible or DA for complex sites
Building in Beverly Hills — Local Context
Site & Ground Conditions in Beverly Hills
Beverly Hills sits on Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil — extremely reactive clay. For a knockdown rebuild, that rules out the cheapest off-the-shelf slab designs straight away. and pushes engineered footings into the $45,000–$80,000 range on most 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) blocks here. Geotechnical testing isn't optional — every Buildana rebuild in Beverly Hills starts with a borehole report so the slab and footings are sized to your actual block, not a generic spec. Skipping that step is how you end up with cracked cornices and sticking doors three years in. Drainage design matters too — overland flow paths on Beverly Hills's topography can collect water against rear setbacks if the contour survey is sloppy.
Approval Timeline for Beverly Hills
Realistic timeline for a rebuild in Beverly Hills: 10–15 business days CDC, or 8–14 weeks DA — depends on the design. Add 2–4 weeks before lodgement for documentation, BASIX certificate, geotech report, and survey if you don't already have one. Construction Certificate is issued separately before works commence.
Cost vs Value in Beverly Hills
Median sale price in Beverly Hills is $1.5M–$2.4M typical; $2.0M–$3.5M Oatley/Lugarno/Peakhurst Heights premium foreshore; $3.0M–$8.0M+ direct waterfront. For a rebuild, the decision tree runs through three numbers: build cost, expected post-completion value, and how long you plan to hold. New custom homes in Beverly Hills re-set the property at the top of the local price band, with new-build premium of 10–20% over comparable established stock. We map this in feasibility before you commit.
Designing for the Beverly Hills Streetscape
Beverly Hills's housing stock is predominantly from the 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs.. The local anchor is Beverly Hills shops + King Georges Road + Beverly Hills Park. For a knockdown rebuild, the streetscape question matters more than most builders admit — a brand-new double-storey on a street of single-storey 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs weatherboards will draw council attention on bulk and scale, even if technically compliant. Buildana designs the front elevation to read appropriately for the street while modernising the floor plan and structure behind it. Materials palette, roof pitch, fenestration rhythm — all chosen to settle into the existing rhythm rather than fight it.
Why Some Beverly Hills Builds Stall
Builds in Beverly Hills stall for predictable reasons. Lodgement defects (missing BASIX, wrong drawing scale, undeclared overlays). Soil surprises on Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works ground when the builder didn't commission a borehole upfront. Variation creep when the contract was light on inclusions. Trade scheduling gaps when the builder is over-committed across too many sites. Georges River Council delays when neighbour objection triggers committee review. Buildana protects against each of these at contract stage — fully documented lodgement pack, geotech in the price, itemised inclusions instead of allowances, and a tight project-manager-to-job ratio that keeps trades moving.
Builder's Take on Beverly Hills
Clients often ask whether to keep the existing slab. Almost always no. 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs-era slabs in Beverly Hills weren't engineered for Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil to today's standards. Trying to match new construction to old footings creates structural liability. Full slab replacement is cleaner and cheaper in the long run.
1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs Beverly Hills homes are often asbestos-affected — not always, but often enough that the demolition quote should include contingency. AL/A-class licensed removal runs $8K–$25K on top of standard demolition. Any builder who doesn't flag this is either inexperienced or setting up a variation.
Beverly Hills vs Nearby Suburbs
Beverly Hills vs nearby suburbs — key metrics for knocking down and rebuilding.
| Suburb | Median Price | Typical Lot | Soil Class | Era | Station |
|---|---|---|---|---|---|
| Beverly Hills2209this suburb | $1.5M–$2.4M typical; $2.0M–$3.5M Oatley/Lugarno/Peakhurst Heights premium foreshore; $3.0M–$8.0M+ direct waterfront | 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) | Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works | 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs | Beverly Hills |
| Hurstville2220 | $1.5M–$2.4M typical; $2.0M–$3.5M Oatley/Lugarno/Peakhurst Heights premium foreshore; $3.0M–$8.0M+ direct waterfront | 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) | Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works | 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs | Hurstville |
| Penshurst2222 | $1.5M–$2.4M typical; $2.0M–$3.5M Oatley/Lugarno/Peakhurst Heights premium foreshore; $3.0M–$8.0M+ direct waterfront | 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) | Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works | 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs | Penshurst |
| Roselands2196 | $1.1M–$1.35M | 500–700m² | Class M | 1940s–1970s | Lakemba (1 km) |
Median price, soil class, and lot size shape build feasibility and final cost. Buildana assesses every site against these and other constraints during the free feasibility stage.
Have a question about your project?
Talk to our team — free site assessment and fixed-price quote.
How It Works
From First Call to Final Key
Site visit covers everything that affects the build cost: vehicle access for trucks and crane, services (sewer depth, water connection, electrical service rating), soil exposure for borehole, neighbouring construction, and any obvious heritage or tree constraints. Real numbers, not estimates.
⏱Architectural design for your replacement home, structural engineering for Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil, BASIX certification, and all approval documentation. Lodged as CDC (10–15 days) or DA (40–90 days) depending on design.
⏱Demolition runs 5–10 working days for a standard Beverly Hills cottage — longer if asbestos volume is significant or the structure includes a brick chimney or solid-block walls. Asbestos work happens first under a controlled removal program before mechanical demo starts.
⏱New home built from engineered slab (Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil) to keys — fixed-price, milestone-based progress payments. Your project manager provides weekly updates.
⏱Walk through your finished home on your original Beverly Hills block. OC issued, all services live, 6-year structural warranty, appliance manuals, and maintenance schedule. Move in.
⏱Quality Promise
Every Buildana knockdown rebuild in Beverly Hills is delivered under a fixed-price contract — site assessment through to defect-free handover.
Cost Guide
| Item | Estimated Range |
|---|---|
| Entry-level single storey KDR | $480,000 – $650,000 |
| Mid-range double storey KDR | $720,000 – $1,000,000 |
| Architectural KDR | $1,000,000 – $1,500,000 |
| Luxury KDR (high-spec finishes) | $1,500,000+ |
Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.
Our Team
Oliver Alameri
Founder / Director / Builder · MPropDev · PhD Student
Ahmad Alameri
Accounts Manager
Claire Wendell
Project Manager
Estimate Your Build Cost
Use our free calculator to get an instant cost estimate for your project
Ready to take the next step?
Free consultation — no obligation, no pressure.
Frequently Asked Questions
“Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.”
Fatima Al-Rashid
Liverpool, NSW
We Build Across Sydney
Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.
Last updated: 1 April 2026
Explore Related Topics
Knockdown Rebuild in Beverly Hills
Free KDR site assessment for Beverly Hills 2209. We'll assess your block, estimate cost, and provide a fixed-price budget.
Start Your Project