Knockdown Rebuild Beverly Hills — Demo to Handover in 12 Months

Beverly Hills 2209 KDR with tight programme: demolition (3–4 weeks), new home (24–40 weeks). CDC fast-track or Georges River Council DA. Weekly progress updates.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

A knockdown rebuild in Beverly Hills costs $450,000–$1,200,000+. Standard single-storey from $450K, two-storey from $650K. Buildana manages demolition, Georges River Council approvals, and construction under one fixed-price contract.

Beverly Hills Knockdown Rebuilds

Beverly Hills's 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs-era housing stock on 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) blocks makes the suburb a strong candidate for knockdown rebuild. Many older homes in Beverly Hills have reached the point where renovation costs approach or exceed the cost of a complete KDR — and a new build delivers a home designed exclusively for your lifestyle, built to current NCC standards. Georges River Council manages approvals across Georges River Council, and Buildana has deep experience with KDR projects in the area.

Practical realities of knocking down and rebuilding in Beverly Hills: Local services anchor around Beverly Hills shops + King Georges Road + Beverly Hills Park, which influences site access during construction (deliveries, cranage, skip placement). 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) blocks usually have enough room for proper site set-up, but tight battle-axe lots and narrow frontages need staging plans factored into the build program. Georges River Council processes a steady volume of residential applications — clean documentation moves fast, and Buildana lodges everything at full standard the first time. Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil (extremely reactive clay) sets foundation cost in the $45,000–$80,000 range; budget allocation for that line item is fixed in your contract, not estimated.

Buildana manages the complete knockdown rebuild process in Beverly Hills — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home in Beverly Hills from $450K
  • Georges River Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil — engineered slab design included
  • Typical blocks 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) in Beverly Hills
  • Single and two-storey designs available
  • 6-year structural warranty
  • Free site assessment — near Beverly Hills station
KDR construction in Beverly Hills — R2 Low Density / R3 Medium Density on station precincts / R4 (Hurstville CBD/Kogarah CBD high-rise + Beverly Hills/Penshurst/Mortdale precincts) zoned
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

Why Knockdown Rebuild in Beverly Hills?

Beverly Hills is the rail-line residential suburb between Hurstville and Kingsgrove — Federation cottages, inter-war heritage and 1960s–1990s brick on 400–600m² R2 blocks with R3 Medium Density along King Georges Road. Strong renewal activity.

Residential blocks of 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) across Beverly Hills (2209) provide solid building envelopes for a range of project types. Georges River Council manages planning controls with well-established DCP provisions. Direct rail access from Beverly Hills station adds genuine value to Beverly Hills property. 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs-era housing stock across Beverly Hills is prime for knockdown rebuild — replacing dated layouts and materials with modern, NCC-compliant homes that maximise block potential. Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil (extremely reactive) is standard for Beverly Hills — Buildana includes engineered slab design in every quote.

Knockdown-rebuild builder in Beverly Hills — key facts

Suburb
Beverly Hills, NSW 2209
Council / LGA
Georges River Council (Georges River Council)
Primary zoning
R2 Low Density / R3 Medium Density on station precincts / R4 (Hurstville CBD/Kogarah CBD high-rise + Beverly Hills/Penshurst/Mortdale precincts)
Typical lot size
400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point)
Soil class
Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works
Median house price
$1.5M–$2.4M typical; $2.0M–$3.5M Oatley/Lugarno/Peakhurst Heights premium foreshore; $3.0M–$8.0M+ direct waterfront
Home era
1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs
Typical price range
$450,000 – $1,200,000+
Typical timeline
14–22 months including demolition
Approval pathway
CDC where eligible or DA for complex sites

Building in Beverly Hills — Local Context

Site & Ground Conditions in Beverly Hills

Beverly Hills sits on Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil — extremely reactive clay. For a knockdown rebuild, that rules out the cheapest off-the-shelf slab designs straight away. and pushes engineered footings into the $45,000–$80,000 range on most 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) blocks here. Geotechnical testing isn't optional — every Buildana rebuild in Beverly Hills starts with a borehole report so the slab and footings are sized to your actual block, not a generic spec. Skipping that step is how you end up with cracked cornices and sticking doors three years in. Drainage design matters too — overland flow paths on Beverly Hills's topography can collect water against rear setbacks if the contour survey is sloppy.

Approval Timeline for Beverly Hills

Realistic timeline for a rebuild in Beverly Hills: 10–15 business days CDC, or 8–14 weeks DA — depends on the design. Add 2–4 weeks before lodgement for documentation, BASIX certificate, geotech report, and survey if you don't already have one. Construction Certificate is issued separately before works commence.

Cost vs Value in Beverly Hills

Median sale price in Beverly Hills is $1.5M–$2.4M typical; $2.0M–$3.5M Oatley/Lugarno/Peakhurst Heights premium foreshore; $3.0M–$8.0M+ direct waterfront. For a rebuild, the decision tree runs through three numbers: build cost, expected post-completion value, and how long you plan to hold. New custom homes in Beverly Hills re-set the property at the top of the local price band, with new-build premium of 10–20% over comparable established stock. We map this in feasibility before you commit.

Designing for the Beverly Hills Streetscape

Beverly Hills's housing stock is predominantly from the 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs.. The local anchor is Beverly Hills shops + King Georges Road + Beverly Hills Park. For a knockdown rebuild, the streetscape question matters more than most builders admit — a brand-new double-storey on a street of single-storey 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs weatherboards will draw council attention on bulk and scale, even if technically compliant. Buildana designs the front elevation to read appropriately for the street while modernising the floor plan and structure behind it. Materials palette, roof pitch, fenestration rhythm — all chosen to settle into the existing rhythm rather than fight it.

Why Some Beverly Hills Builds Stall

Builds in Beverly Hills stall for predictable reasons. Lodgement defects (missing BASIX, wrong drawing scale, undeclared overlays). Soil surprises on Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works ground when the builder didn't commission a borehole upfront. Variation creep when the contract was light on inclusions. Trade scheduling gaps when the builder is over-committed across too many sites. Georges River Council delays when neighbour objection triggers committee review. Buildana protects against each of these at contract stage — fully documented lodgement pack, geotech in the price, itemised inclusions instead of allowances, and a tight project-manager-to-job ratio that keeps trades moving.

Builder's Take on Beverly Hills

Clients often ask whether to keep the existing slab. Almost always no. 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs-era slabs in Beverly Hills weren't engineered for Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil to today's standards. Trying to match new construction to old footings creates structural liability. Full slab replacement is cleaner and cheaper in the long run.

1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs Beverly Hills homes are often asbestos-affected — not always, but often enough that the demolition quote should include contingency. AL/A-class licensed removal runs $8K–$25K on top of standard demolition. Any builder who doesn't flag this is either inexperienced or setting up a variation.

Beverly Hills vs Nearby Suburbs

Beverly Hills vs nearby suburbs — key metrics for knocking down and rebuilding.

SuburbMedian PriceTypical LotSoil ClassEraStation
Beverly Hills2209this suburb$1.5M–$2.4M typical; $2.0M–$3.5M Oatley/Lugarno/Peakhurst Heights premium foreshore; $3.0M–$8.0M+ direct waterfront400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point)Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDsBeverly Hills
Hurstville2220$1.5M–$2.4M typical; $2.0M–$3.5M Oatley/Lugarno/Peakhurst Heights premium foreshore; $3.0M–$8.0M+ direct waterfront400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point)Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDsHurstville
Penshurst2222$1.5M–$2.4M typical; $2.0M–$3.5M Oatley/Lugarno/Peakhurst Heights premium foreshore; $3.0M–$8.0M+ direct waterfront400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point)Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDsPenshurst
Roselands2196$1.1M–$1.35M500–700m²Class M1940s–1970sLakemba (1 km)

Median price, soil class, and lot size shape build feasibility and final cost. Buildana assesses every site against these and other constraints during the free feasibility stage.

Have a question about your project?

Talk to our team — free site assessment and fixed-price quote.

The house fits how your family has actually grown — not how it was in 1978
Outdoor entertaining finally connects to the living area, not the laundry
Proper master suite with ensuite — a room, not a corner of the hallway
Kids get real bedrooms with space for study, not shoebox rooms with bunks
Energy bills drop because the new envelope is insulated, sealed and shaded properly
Garaging works with modern cars — no more reverse-parking a hatchback into a 1960s carport
Home finally matches the suburb you chose to live in

How It Works

From First Call to Final Key

Site visit covers everything that affects the build cost: vehicle access for trucks and crane, services (sewer depth, water connection, electrical service rating), soil exposure for borehole, neighbouring construction, and any obvious heritage or tree constraints. Real numbers, not estimates.

Architectural design for your replacement home, structural engineering for Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil, BASIX certification, and all approval documentation. Lodged as CDC (10–15 days) or DA (40–90 days) depending on design.

Demolition runs 5–10 working days for a standard Beverly Hills cottage — longer if asbestos volume is significant or the structure includes a brick chimney or solid-block walls. Asbestos work happens first under a controlled removal program before mechanical demo starts.

New home built from engineered slab (Class M (Wianamatta Shale + Hawkesbury Sandstone interface) / Class H reactive clay pockets / Class P/E alluvial on Georges River foreshore (Oatley/Peakhurst/Lugarno/Como) / Foreshore Building Line + Crown Lands referral on river-frontage works soil) to keys — fixed-price, milestone-based progress payments. Your project manager provides weekly updates.

Walk through your finished home on your original Beverly Hills block. OC issued, all services live, 6-year structural warranty, appliance manuals, and maintenance schedule. Move in.

Quality Promise

Every Buildana knockdown rebuild in Beverly Hills is delivered under a fixed-price contract — site assessment through to defect-free handover.

Fixed-price KDR constructionNCC 2025 and BASIX compliantFull Georges River Council complianceLicensed demolition and asbestos removalWeekly progress updates6-year structural warranty

Cost Guide

ItemEstimated Range
Entry-level single storey KDR$480,000 – $650,000
Mid-range double storey KDR$720,000 – $1,000,000
Architectural KDR$1,000,000 – $1,500,000
Luxury KDR (high-spec finishes)$1,500,000+

Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Ready to take the next step?

Free consultation — no obligation, no pressure.

Frequently Asked Questions

Google Reviews
5.0
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.

Fatima Al-Rashid

Liverpool, NSW

See all reviews on Google
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Knockdown Rebuild in Beverly Hills

Free KDR site assessment for Beverly Hills 2209. We'll assess your block, estimate cost, and provide a fixed-price budget.