
Licensed Knockdown Rebuild Builder Penshurst
NSW licensed KDR specialist in Penshurst 2222. Asbestos-accredited demolition, Class M engineered slab, BASIX 2025, 6-year structural warranty on the new home.
New Home on Your Penshurst Block
A knockdown rebuild in Penshurst is a solid station-suburb play — Federation cottages, inter-war heritage and 1960s-90s brick on 400 to 600m² R2 blocks between Hurstville and Mortdale, with renewal strong on the wider streets.
On the R2 streets, a rebuild resets a dated home. Around the station, the R3 precinct can make medium-density the bigger play on qualifying blocks, and the 600m² duplex minimum applies on the larger lots.
The shale-sandstone interface means the slab is designed off a real geotech, and the pre-war stock carries asbestos and lead paint, so a licensed strip-out leads the demolition.
We rebuild fixed-price, licence HBL 487805C. Get our feasibility before you commit.
Buildana manages the complete knockdown rebuild process in Penshurst — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.
Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.
- New home in Penshurst from $450K
- Georges River Council DA and CDC approvals managed
- Demolition and asbestos removal included
- M — engineered slab design included
- Typical blocks 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point) in Penshurst
- Single and two-storey designs available
- 6-year structural warranty
- Free site assessment — near Penshurst station

Reviewed by Oliver Alameri
Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010
Renewal on the wider streets
Penshurst's renewal is already strong on the wider streets, where the aging Federation-to-brick stock on 400 to 600m² blocks suits a modern rebuild with the station close.
Around the station, the R3 precinct can make medium-density the bigger play — I check first.
Interface ground and old stock
The shale-sandstone interface means the slab is designed off a real geotech. The pre-war stock carries asbestos and lead paint, so a licensed strip-out leads the demolition.
Both are in the feasibility and the fixed price.
Knockdown-rebuild builder in Penshurst — key facts
- Suburb
- Penshurst, NSW 2222
- Council / LGA
- Georges River Council (Georges River Council)
- Primary zoning
- R2 Low Density
- Typical lot size
- 400–700m² typical (Hurstville/Kogarah/Beverly Hills/Penshurst/Mortdale/Carlton/Kingsgrove/Allawah); 600–1,200m² premium foreshore (Oatley/Lugarno/Peakhurst Heights/Connells Point)
- Soil class
- M
- Median house price
- $1.5M–$2.4M typical; $2.0M–$3.5M Oatley/Lugarno/Peakhurst Heights premium foreshore; $3.0M–$8.0M+ direct waterfront
- Home era
- 1920s–1960s heritage Federation/Californian Bungalow + 1960s–1990s brick veneer + 2010s+ R3/R4 redevelopment around Hurstville/Kogarah/Beverly Hills CBDs
- Typical price range
- $450,000 – $1,200,000+
- Typical timeline
- 14–22 months including demolition
- Approval pathway
- CDC where eligible or DA for complex sites
Want a real number for YOUR block — not a generic estimate?
Free site assessment, fixed-price contract, line-itemised quote within 48 hours. No high-pressure sales — just a real builder talking real numbers.
Quality Promise
Our Penshurst knockdown rebuilds sequence demolition, slab, frame, lockup, handover. Fixed price locked before demolition starts.
How It Works
From First Call to Final Key
KDR feasibility is two questions: what can the block legally support, and is it cheaper to build new than fix old. We answer both in writing within a week, with cost ranges grounded in current Penshurst market data — not generic Sydney averages.
⏱New home designed for your Penshurst block — maximising FSR, orientation, and streetscape. Working drawings, engineering, and BASIX prepared. CDC or DA lodged with Georges River Council.
⏱Full demolition management: asbestos survey report, licensed removal where required, structural demolition, site clearing, temporary fencing, and dust/noise management. Georges River Council demolition permit obtained beforehand.
⏱Build sequence: site prep, slab pour, frame stand, roof, brickwork, lock-up, plumbing and electrical rough-in, plaster, internal fit-out, kitchen install, tiling, flooring, painting, external works, final clean. Each stage signed off before payment release.
⏱Defect-free handover inspection, OC issued, keys in hand. Permanent services reconnected, landscaping complete, 6-year structural warranty, and full maintenance guide provided.
⏱Our Team
Oliver Alameri
Founder / Director / Builder · MPropDev · PhD Student
Ahmad Alameri
Accounts Manager
Claire Wendell
Project Manager
Estimate Your Build Cost
Use our free calculator to get an instant cost estimate for your project
Still got questions? Talk to Oliver directly.
30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.
Frequently Asked Questions
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
Fatima Al-Rashid
Liverpool, NSW
We Build Across Sydney
Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.
Last updated: 1 April 2026
Explore Related Topics
Book a Penshurst Knockdown Rebuild Assessment
Free KDR site assessment for Penshurst 2222. We'll assess your block, estimate cost, and provide a fixed-price budget.
Start Your ProjectMore in Penshurst
Other Buildana services in Penshurst
Costs, approval pathway and fixed-price contract detail for every other build type we deliver in Penshurst 2222. Georges River Council regulations and local controls are covered on each page.