Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

House Demolition & Knockdown Rebuild Brighton-Le-Sands

Demolition and a new home in Brighton-Le-Sands 2216, approved together and built under one contract. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Knockdown rebuild in Brighton-Le-Sands. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs. Bayside Council approval by CDC or DA.

Brighton-Le-Sands KDR — Single Contract, New Home

A knockdown rebuild in Brighton-Le-Sands suits the tired inter-war and post-war stock a walk from Botany Bay, but the sandy ground and the flight path shape any rebuild. The homes sit on 400 to 700m² blocks, and the Botany Sands soil with an elevated water table means the new slab and footings get designed against groundwater. Some streets sit under the ANEF flight-path overlay.

The sandy ground with a high water table means the new slab and footings are designed against groundwater from a real geotech, sometimes with a suspended slab or specific waterproofing. The flight-path overlay on affected streets brings acoustic construction requirements. Where the older home carries asbestos, a licensed strip-out and clearance certificate lead the demolition.

What I check first on your Brighton-Le-Sands knockdown rebuild: the water table on the sandy ground, whether the flight-path overlay hits your street, and asbestos in the demolition. Those decide the play and the price.

We rebuild under NSW contractor licence 487805C. Get our knockdown rebuild feasibility before you commit.

Buildana manages the complete knockdown rebuild process in Brighton-Le-Sands — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home designed for your Brighton-Le-Sands block
  • Bayside Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • M — engineered slab design included
  • Typical blocks 400–700m² in Brighton-Le-Sands
  • Single and two-storey designs available
  • Statutory home warranties
  • Free site assessment — near Rockdale (T4, 1.5 km) station
KDR on a 400–700m² block in Brighton-Le-Sands — demolition plus new home
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

Sandy ground changes the rebuild

Brighton-Le-Sands sits on Botany Sands with an elevated water table, and that changes the rebuild fundamentals. The new slab and footings get designed against groundwater from a real geotech, sometimes with a suspended slab or specific waterproofing, rather than a standard slab-on-ground. I would rather have that priced from a real assessment than discovered when the excavation fills with water.

Where a rebuild does stack up, the beachfront setting a walk from The Grand Parade gives a new custom home a genuinely desirable location worth designing to.

Flight path and asbestos

Some Brighton-Le-Sands streets sit under the ANEF flight-path overlay, which brings acoustic construction requirements on the new home worth pricing at design rather than at DA. Where the older home carries asbestos, a licensed strip-out and clearance certificate lead the demolition before the rebuild. I check the overlay, the water table and the clearance on your block first.

Knockdown-rebuild builder in Brighton-Le-Sands — key facts

Suburb
Brighton-Le-Sands, NSW 2216
Council / LGA
Bayside Council (Bayside)
Primary zoning
R2 Low
Typical lot size
400–700m²
Soil class
M
Home era
1920s–1970s + apartments
Typical price range
To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Cost Guide

ItemEstimated Range
New single storey house (build only)$565k–$980k + GST
New double storey house (build only)$735k–$1.27M + GST
Premium rebuildPriced per design and specification
Demolition (1920s–1970s + apartments Brighton-Le-Sands home)Depends on house size, construction and asbestos
Asbestos removal (if present)Depends on the type and quantity found
Service disconnections & reinstatementDepends on the services connected to the site

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Site assessment and feasibility
Demolition and asbestos management (licensed)
Service disconnections — Sydney Water, Endeavour Energy, gas in Brighton-Le-Sands
Architectural design for your 400–700m² block
Geotechnical report (Class M soil — Brighton-Le-Sands)
BASIX certificate and compliance with the applicable NCC
Bayside Council DA or CDC lodgement
Engineered slab and full construction
Kitchen, bathroom and fit-out
Driveway, landscaping and external works

How It Works

From First Call to Final Key

Everything that has to be right before we touch the ground. KDR feasibility is two questions: what can the block legally support, and is it cheaper to build new than fix old. We answer both in writing, with costs worked out for your block rather than a generic per-square-metre guess. New home designed for your Brighton-Le-Sands block — maximising FSR, orientation, and streetscape. Working drawings, engineering, and BASIX prepared. CDC or DA lodged with Bayside Council.

⏱

The Brighton-Le-Sands construction phase. Fixed price, programmed, supervised. Full demolition management: asbestos survey report, licensed removal where required, structural demolition, site clearing, temporary fencing, and dust/noise management. Bayside Council demolition permit obtained beforehand. Build sequence: site prep, slab pour, frame stand, roof, brickwork, lock-up, plumbing and electrical rough-in, plaster, internal fit-out, kitchen install, tiling, flooring, painting, external works, final clean. Each stage signed off before payment release.

⏱

The job isn't done when the site's clean; it's done when you have keys, certificates and warranties. Defect-free handover inspection, OC issued, keys in hand. Permanent services reconnected, landscaping complete, NSW statutory warranties, and full maintenance guide provided.

⏱

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Knockdown Rebuild in Brighton-Le-Sands

Free KDR site assessment for Brighton-Le-Sands 2216. We'll assess your block and talk through demolition, approvals and the build.

Start Your Project