Skip to content

We’re here to make it feel like home

Buildana construction project in Western Sydney

Monterey Knockdown Rebuild — Stay on Your Street

Buildana handles KDR across Monterey 2217. 1930s–1970s homes on 450–700m² blocks — we know the soil, the Bayside Council rules, and the neighbours' expectations.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

A knockdown rebuild in Monterey costs $450,000–$1,200,000+. Standard single-storey from $450K, two-storey from $650K. Buildana manages demolition, Bayside Council approvals, and construction under one fixed-price contract.

Monterey Knockdown Rebuilds

A knockdown rebuild in Monterey is a quiet bayside play — inter-war heritage and post-war brick on 450 to 700m² blocks, a short walk from the Brighton-Le-Sands beachfront without the beachfront prices. A rebuild resets a dated home into a modern one in a settled pocket.

The flight-path overlay calls for acoustic glazing in the design, and the Botany Sands soil shapes the footing off a real geotech. On the R3 along The Grand Parade, medium-density can be an option where a block qualifies.

The older stock carries asbestos, so a licensed strip-out leads the demolition.

We rebuild fixed-price, licence HBL 487805C. Get our knockdown rebuild feasibility before you commit.

Buildana manages the complete knockdown rebuild process in Monterey — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home in Monterey from $450K
  • Bayside Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • M — engineered slab design included
  • Typical blocks 450–700m² in Monterey
  • Single and two-storey designs available
  • 6-year structural warranty
  • Free site assessment — near Rockdale (T4, 2 km) station
New home on a demolished Monterey lot, Bayside, NSW
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

Near the beach, without the premium

Monterey gives you the Brighton-Le-Sands beachfront a short walk away without the beachfront prices, on 450 to 700m² blocks of aging inter-war and post-war stock. A rebuild resets a dated home into a modern bayside one.

On the R3 along The Grand Parade, medium-density can be worth costing where a block qualifies.

Acoustics, sands and old stock

The flight-path overlay calls for acoustic glazing and insulation, factored into the design upfront. The Botany Sands soil shapes the footing design off a real geotech.

The older stock carries asbestos, so a licensed strip-out leads the demolition.

Knockdown-rebuild builder in Monterey — key facts

Suburb
Monterey, NSW 2217
Council / LGA
Bayside Council (Bayside)
Primary zoning
R2 Low
Typical lot size
450–700m²
Soil class
M
Median house price
$1.8M–$2.7M
Home era
1930s–1970s
Typical price range
$450,000 – $1,200,000+
Typical timeline
14–22 months including demolition
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Free site assessment, fixed-price contract, line-itemised quote within 48 hours. No high-pressure sales — just a real builder talking real numbers.

Cost Guide

ItemEstimated Range
Single storey rebuild (150–200m²)$480,000 – $680,000
Double storey rebuild (200–300m²)$680,000 – $1,050,000
Premium rebuild (300m²+)$1,050,000+
Demolition (1930s–1970s Monterey home)$18,000 – $40,000
Asbestos removal (if present)$8,000 – $25,000
Service disconnections & reinstatement$3,000 – $8,000

Prices are indicative for Western Sydney (2025). Actual costs depend on site, specifications, and approvals.

How It Works

From First Call to Final Key

Everything that has to be right before we touch the ground. KDR feasibility is two questions: what can the block legally support, and is it cheaper to build new than fix old. We answer both in writing within a week, with cost ranges grounded in current Monterey market data — not generic Sydney averages. New home designed for your Monterey block — maximising FSR, orientation, and streetscape. Working drawings, engineering, and BASIX prepared. CDC or DA lodged with Bayside Council.

The Monterey construction phase. Fixed price, programmed, supervised. Full demolition management: asbestos survey report, licensed removal where required, structural demolition, site clearing, temporary fencing, and dust/noise management. Bayside Council demolition permit obtained beforehand. Build sequence: site prep, slab pour, frame stand, roof, brickwork, lock-up, plumbing and electrical rough-in, plaster, internal fit-out, kitchen install, tiling, flooring, painting, external works, final clean. Each stage signed off before payment release.

The job isn't done when the site's clean; it's done when you have keys, certificates and warranties. Defect-free handover inspection, OC issued, keys in hand. Permanent services reconnected, landscaping complete, 6-year structural warranty, and full maintenance guide provided.

Site assessment and feasibility
Demolition and asbestos management (licensed)
Service disconnections — Sydney Water, Endeavour Energy, gas in Monterey
Architectural design for your 450–700m² block
Geotechnical report (Class M soil — Monterey)
BASIX certificate and NCC 2025 compliance
Bayside Council DA or CDC lodgement
Engineered slab and full construction
Kitchen, bathroom and fit-out
Driveway, landscaping and external works

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Knockdown Rebuild in Monterey

Free KDR site assessment for Monterey 2217. We'll assess your block, estimate cost, and provide a fixed-price budget.

Start Your Project