Skip to content

We’re here to make it feel like home

Buildana construction project in Western Sydney

Knockdown Rebuild Clareville — Demo to Handover in 12 Months

Clareville 2107 KDR with tight programme: demolition (3–4 weeks), new home (24–40 weeks). CDC fast-track or Northern Beaches Council DA. Weekly progress updates.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300

Clareville KDR — Single Contract, New Home

A knockdown rebuild in Clareville is a premium Pittwater project on the calm-water side — Federation, mid-century and contemporary on 600 to 1,500m² blocks with substantial sandstone fall to Clareville Beach. The Pittwater outlook and the quiet beach make it one of the peninsula's most desirable pockets.

The stack applies: deep sandstone rock priced from a geotech bore, BAL-19 to Flame Zone on the bushland-fringe lots, and the Foreshore Building Line on direct waterfront. I check all of it upfront so the design and price account for it.

The older stock can carry asbestos, so a licensed strip-out leads the demolition.

We rebuild fixed-price, licence HBL 487805C. Get our feasibility, with the rock, bushfire and foreshore costed, before you commit.

Buildana manages the complete knockdown rebuild process in Clareville — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home in Clareville from $450K
  • Northern Beaches Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • Hawkesbury Sandstone — engineered slab design included
  • Typical blocks 600–1,500m² in Clareville
  • Single and two-storey designs available
  • 6-year structural warranty
  • Free site assessment — near B-Line bus to CBD (Avalon interchange) station
KDR on a 600–1,500m² block in Clareville — demolition plus new home
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2010

Calm-water premium

Clareville's calm-water position on Pittwater, with the quiet beach and the outlook, makes it one of the peninsula's most desirable pockets. On 600 to 1,500m² blocks with substantial fall, a rebuild designs a substantial home around the water.

The waterfront lots carry a real premium that good design captures.

Rock, bushfire and foreshore

The deep sandstone rock is priced from a real geotech bore, the BAL-19 to Flame Zone ratings on the bush-fringe lots shape the design from the RFS assessment, and the Foreshore Building Line restricts the direct waterfront.

The older stock can carry asbestos, so a licensed strip-out leads the demolition.

Knockdown-rebuild builder in Clareville — key facts

Suburb
Clareville, NSW 2107
Council / LGA
Northern Beaches Council (Northern Beaches)
Primary zoning
R2 Low
Typical lot size
600–1,500m²
Soil class
Hawkesbury Sandstone
Median house price
$3.5M–$10M+ (waterfront)
Home era
1920s–1970s + premium contemporary
Typical price range
$450,000 – $1,200,000+
Typical timeline
14–22 months including demolition
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Free site assessment, fixed-price contract, line-itemised quote within 48 hours. No high-pressure sales — just a real builder talking real numbers.

Quality Promise

Every Buildana knockdown rebuild in Clareville is delivered under a fixed-price contract — site assessment through to defect-free handover.

Fixed-price KDR constructionNCC 2025 and BASIX compliantFull Northern Beaches Council complianceLicensed demolition and asbestos removalWeekly progress updates6-year structural warranty

How It Works

From First Call to Final Key

KDR starts with an honest look at the existing house. Sometimes it's worth keeping. Most Clareville homes from the 1920s–1970s + premium contemporary — especially fibro and brick-veneer — are beyond the point where renovation makes sense. We tell you straight.

Demolition is pre-approved to run parallel with rebuild design. Asbestos cleared, services abolished, site stripped in a single mobilisation. Geotech reconfirms Class Hawkesbury Sandstone soil with the old house gone.

New house goes up on the same footprint or a better one, whichever serves the block. Modern NCC envelope, better orientation, fit-for-purpose room sizes. The suburb stays the same; the house finally fits it.

Final handover: new OC, six-year structural warranty, all the documentation on your Clareville block you'd get on a greenfield build. The only difference is you still live in the street you chose.

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

New Home in Clareville — KDR Consultation

Free KDR site assessment for Clareville 2107. We'll assess your block, estimate cost, and provide a fixed-price budget.

Start Your Project