Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

House Demolition & Knockdown Rebuild Coogee — Stay on Your Street

Rebuilding in Coogee 2034 keeps the street you know. We work to Randwick City Council's rules and protect the neighbours through demolition and the build.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300

Demolish and Rebuild in Coogee

A knockdown rebuild in Coogee is a premium coastal project in the LGA's signature beachside suburb — Federation cottages, inter-war heritage, mid-century apartments and contemporary builds on 250 to 600m² blocks fronting Coogee Beach. A rebuild designs a modern coastal home, and on the ocean-view lots the premium is significant.

Coastal salt-grade specs are mandatory here — corrosion-resistant fixings and marine-suitable detailing that stands up to the exposure. Heritage Conservation Areas cover most older streets, so a rebuild generally goes down the DA path, and on the R3 land along Coogee Bay Road and Carrington Road, medium-density can be an option.

The sandstone-dominant ground, with substantial fall to the beach, means rock excavation and retaining on the fall lots, all priced from a real geotech. The pre-war stock can carry asbestos and lead paint, so a licensed strip-out leads the demolition.

We rebuild under NSW contractor licence 487805C. Get our feasibility, with salt-grade detailing, rock and fall costed, before you commit.

Buildana manages the complete knockdown rebuild process in Coogee — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home designed for your Coogee block
  • Randwick City Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • M — engineered slab design included
  • Typical blocks 250–600m² in Coogee
  • Single and two-storey designs available
  • Statutory home warranties
  • Free site assessment — near Light Rail Randwick (2 km) station
KDR construction in Coogee — R2 Low zoned
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

The signature beachside suburb

Coogee is the LGA's signature beachside suburb, on 250 to 600m² blocks fronting Coogee Beach, with Federation cottages, mid-century apartments and contemporary builds. A rebuild designs a modern coastal home, and on the ocean-view lots the premium is significant.

It is one of the eastern beaches' most desirable addresses, where the build has to last in the environment.

Salt-grade, heritage and cliff fall

Coastal salt-grade specs are mandatory — corrosion-resistant fixings and marine-suitable detailing that lasts in the exposure. Heritage Conservation Areas cover most older streets, so a rebuild generally goes down the DA path, and on the R3 land along Coogee Bay Road and Carrington Road, medium-density can be an option.

The sandstone-dominant ground, with substantial fall to the beach, means rock excavation and retaining on the fall lots, all priced from a real geotech. The pre-war stock can carry asbestos and lead paint, so a licensed strip-out leads the demolition.

Knockdown-rebuild builder in Coogee — key facts

Suburb
Coogee, NSW 2034
Council / LGA
Randwick City Council (Randwick)
Primary zoning
R2 Low
Typical lot size
250–600m²
Soil class
M
Home era
1900s–1940s + apartments
Typical price range
To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Knockdown Rebuild in Coogee

Free KDR site assessment for Coogee 2034. We'll assess your block and talk through demolition, approvals and the build.

Start Your Project