Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

Knockdown Rebuild Edmondson Park — House Demolition to Keys

One agreement in Edmondson Park 2174: demolition, asbestos removal, site preparation, design, approvals, engineering, the new home and the occupation certificate.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Knockdown rebuild in Edmondson Park. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs. Liverpool City Council approval by CDC or DA.

Edmondson Park KDR — Single Contract, New Home

Nobody should be knocking down a ten-year-old house, and that is most of Edmondson Park, the suburb is 2010s-to-present, master-planned around its own station and Ed Square. A knockdown rebuild here rarely makes sense on paper: the dwelling still holds real value, and lots of 300 to 450m² do not offer an upside a demolition would create. If someone is pitching you a KDR on a near-new home, ask them whose interest that serves.

Where it does get interesting is the handful of early builds that under-used their sites, cheap first-stage project homes on corner or R3-zoned lots, where the 400m² duplex minimum opens a dual-occupancy play. Soil rates H-E, so any new footing design starts with geotech. For most owners here the honest answer is extend or hold, not demolish.

What I would check first on an Edmondson Park block: whether the house genuinely under-uses the site, the R3 or corner duplex potential, and the reactive-soil footings. Those decide if a rebuild even makes sense.

We build these fixed-price, licence HBL 487805C. Run your address past us and we will tell you which camp you are in, no charge for the truth.

Buildana manages the complete knockdown rebuild process in Edmondson Park — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home designed for your Edmondson Park block
  • Liverpool City Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • Class H–E soil — engineered slab design included
  • Typical blocks 300–450m² in Edmondson Park
  • Single and two-storey designs available
  • Statutory home warranties
  • Free site assessment — near Edmondson Park station
Knockdown-rebuild project by Buildana in Edmondson Park 2174
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building across Western Sydney since 2018

Too new to knock down, usually

Edmondson Park is 2010s-to-present, master-planned around its own station and Ed Square, so a knockdown rebuild rarely makes sense on paper. The dwelling still holds real value, and 300 to 450m² lots do not offer an upside a demolition would create.

If someone is pitching a KDR on a near-new home, ask whose interest that serves. For most owners here the honest answer is extend or hold, not demolish.

The rare exception

Where it gets interesting is the handful of early builds that under-used their sites, cheap first-stage project homes on corner or R3-zoned lots, where the 400m² duplex minimum opens a dual-occupancy play.

Soil rates H-E, so any new footing design starts with geotech. Run your address past us and we will tell you which camp you are in, no charge for the truth.

Knockdown-rebuild builder in Edmondson Park — key facts

Suburb
Edmondson Park, NSW 2174
Council / LGA
Liverpool City Council (Liverpool City)
Primary zoning
R2 Low Density & R3 Medium Density
Typical lot size
300–450m²
Soil class
Class H–E
Home era
2010s–present
Typical price range
To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Cost Guide

ItemEstimated Range
Demolish 2010s–present fibro → new double storey (build only)$735k–$1.27M + GST
Demolish brick veneer → new single storey (build only)$565k–$980k + GST
Demolition of the existing homeDepends on house size, construction and asbestos
Asbestos removal (if present)Depends on the type and quantity found
Service disconnections & reinstatementDepends on the services connected to the site

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Site assessment and feasibility
Demolition and asbestos management (licensed)
Service disconnections — Sydney Water, Endeavour Energy, gas in Edmondson Park
Architectural design for your 300–450m² block
Geotechnical report (Class H–E soil — Edmondson Park)
BASIX certificate and compliance with the applicable NCC
Liverpool City Council DA or CDC lodgement
Engineered slab and full construction
Kitchen, bathroom and fit-out
Driveway, landscaping and external works

How It Works

From First Call to Final Key

Site visit covers everything that affects the build cost: vehicle access for trucks and crane, services (sewer depth, water connection, electrical service rating), soil exposure for borehole, neighbouring construction, and any obvious heritage or tree constraints. Real numbers, not estimates.

⏱

Architectural design for your replacement home, structural engineering for Class H–E soil, BASIX certification, and all approval documentation. Lodged as CDC or DA depending on design.

⏱

Demolition time for a standard Edmondson Park cottage depends on asbestos volume and whether the structure includes a brick chimney or solid-block walls. Asbestos work happens first under a controlled removal program before mechanical demo starts.

⏱

New home built from engineered slab (Class H–E soil) to keys under a written contract, with milestone-based progress payments. Your project manager provides weekly updates.

⏱

Walk through your finished home on your original Edmondson Park block. OC issued, all services live, NSW statutory warranties, appliance manuals, and maintenance schedule.

⏱

Our Team

OA

Oliver Alameri

Founder / Director / Builder · MPropDev · PhD Student

AA

Ahmad Alameri

Accounts Manager

CW

Claire Wendell

Project Manager

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Demolish and Rebuild in Edmondson Park

Free KDR site assessment for Edmondson Park 2174. We'll assess your block and talk through demolition, approvals and the build.

Start Your Project