
Knockdown Rebuild Seaforth — House Demolition to Keys
One agreement in Seaforth 2092: demolition, asbestos removal, site preparation, design, approvals, engineering, the new home and the occupation certificate.
Quick Answer
Knockdown rebuild in Seaforth. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs. Northern Beaches Council approval by CDC or DA.
Knockdown Rebuild Builder in Seaforth
A knockdown rebuild in Seaforth is an ultra-premium Middle Harbour project — Federation, inter-war and contemporary on 600 to 1,500m² blocks with substantial sandstone fall to the harbour, and the Beaches Link tunnel portal set to lift connectivity when it opens.
Deep rock excavation is typical, and the harbour fall means suspended slabs and substantial retaining on the fall lots, all priced from a real geotech bore. Heritage Conservation Areas cover the older streets.
The pre-war stock carries asbestos and lead paint, so a licensed strip-out leads the demolition.
We rebuild under NSW contractor licence 487805C. Get our feasibility, with the deep rock and fall costed, before you commit.
Buildana manages the complete knockdown rebuild process in Seaforth — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.
Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.
- New home designed for your Seaforth block
- Northern Beaches Council DA and CDC approvals managed
- Demolition and asbestos removal included
- Hawkesbury Sandstone — engineered slab design included
- Typical blocks 600–1,500m² in Seaforth
- Single and two-storey designs available
- Statutory home warranties
- Free site assessment — near B-Line bus to CBD via Mosman + Beaches Link Tunnel (opening 2028) station

Reviewed by Oliver Alameri
Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years
A premium harbour peninsula, better connected
Seaforth's 600 to 1,500m² blocks fall to Middle Harbour in one of the Beaches' premium harbour-front markets, and the Beaches Link tunnel portal will lift connectivity when it opens. A rebuild designs a substantial home around the harbour outlook.
It is an address where the build has to match the setting.
Deep rock, fall and heritage
Deep rock excavation is typical, with suspended slabs and substantial retaining on the fall lots — all priced from a real geotech bore. Heritage Conservation Areas cover the older streets.
The pre-war stock carries asbestos and lead paint, so a licensed strip-out leads the demolition.
Knockdown-rebuild builder in Seaforth — key facts
- Suburb
- Seaforth, NSW 2092
- Council / LGA
- Northern Beaches Council (Northern Beaches)
- Primary zoning
- R2 Low
- Typical lot size
- 600–1,500m²
- Soil class
- Hawkesbury Sandstone
- Home era
- 1900s–1940s heritage + premium contemporary
- Typical price range
- To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
- Approval and build time
- Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
- Approval pathway
- CDC where eligible or DA for complex sites
Want a real number for YOUR block — not a generic estimate?
Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.
How It Works
From First Call to Final Key
Site visit covers everything that affects the build cost: vehicle access for trucks and crane, services (sewer depth, water connection, electrical service rating), soil exposure for borehole, neighbouring construction, and any obvious heritage or tree constraints. Real numbers, not estimates.
⏱Architectural design for your replacement home, structural engineering for Class Hawkesbury Sandstone soil, BASIX certification, and all approval documentation. Lodged as CDC or DA depending on design.
⏱Demolition time for a standard Seaforth cottage depends on asbestos volume and whether the structure includes a brick chimney or solid-block walls. Asbestos work happens first under a controlled removal program before mechanical demo starts.
⏱New home built from engineered slab (Class Hawkesbury Sandstone soil) to keys under a written contract, with milestone-based progress payments. Your project manager provides weekly updates.
⏱Walk through your finished home on your original Seaforth block. OC issued, all services live, NSW statutory warranties, appliance manuals, and maintenance schedule. Move in.
⏱Quality Promise
Seaforth KDR projects run on one contract: demolition, asbestos clearance, approvals, construction, handover. One builder accountable.
Cost Guide
| Item | Estimated Range |
|---|---|
| Build rate (Rawlinsons Sydney, brick veneer, medium to high finish) | $2,820–$4,250/m² + GST |
| Single storey or double storey KDR (build only) | single storey $565k–$980k + GST, double storey $735k–$1.27M + GST |
| Architectural KDR | Priced per design and specification |
| Luxury KDR (high-spec finishes) | Priced on your selections |
Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.
Who you deal with
Oliver Alameri
Founder and Builder · Master of Property Development · NSW Licence 487805C
Estimate Your Build Cost
Use our free calculator to get an instant cost estimate for your project
Still got questions? Talk to Oliver directly.
30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.
Frequently Asked Questions
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
Fatima Al-Rashid
Liverpool, NSW
We Build Across Sydney
Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.
Last updated: 4 September 2026
Explore Related Topics
New Home in Seaforth — KDR Consultation
Free KDR site assessment for Seaforth 2092. We'll assess your block and talk through demolition, approvals and the build.
Start Your ProjectMore in Seaforth
Other Buildana services in Seaforth
Costs, approval pathway and fixed-price contract detail for every other build type we deliver in Seaforth 2092. Northern Beaches Council regulations and local controls are covered on each page.