We’re here to make it feel like home

Buildana construction project in Western Sydney

House Demolition & Knockdown Rebuild The Spit

Demolition and a new home in The Spit 2088, approved together and built under one contract. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Knockdown rebuild in The Spit. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs. Mosman Council approval by CDC or DA.

Knockdown Rebuild Builder in The Spit

A knockdown rebuild at The Spit is a premium harbour-fall project at the southern end of the Spit Bridge — Federation mansions, inter-war heritage and contemporary harbour-fall builds on 600 to 1,500m² blocks with Middle Harbour outlook. A rebuild lets you design a substantial home around a genuine harbour setting.

Deep rock excavation is typical here, and combined with the substantial harbour fall, a rebuild needs suspended slabs and substantial retaining. I get a real geotech so the deep rock, fall and retaining are all costed properly, because on a Spit block that is the bulk of the substructure budget.

Heritage Conservation Areas cover most older streets, so a rebuild generally goes down the DA path, and on a heritage mansion a restoration is worth weighing. The pre-war stock can carry asbestos and lead paint, so a licensed strip-out leads the demolition.

We rebuild under NSW contractor licence 487805C. Get our feasibility, with the deep rock and fall costed, before you commit.

Buildana manages the complete knockdown rebuild process in The Spit — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home designed for your The Spit block
  • Mosman Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • M — engineered slab design included
  • Typical blocks 600–1,500m² in The Spit
  • Single and two-storey designs available
  • Statutory home warranties
  • Free site assessment — near North Sydney (7 km) station
Knockdown-rebuild project by Buildana in The Spit 2088
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

Premium Middle Harbour setting

The Spit is the harbour-fall locality at the southern end of the Spit Bridge, with Federation mansions and contemporary harbour-fall builds on 600 to 1,500m² blocks and Middle Harbour outlook. A rebuild here designs a substantial home around a genuine harbour setting.

It is a premium address where the build has to match the outlook.

Deep rock and harbour fall

Deep rock excavation is typical here, and with the substantial harbour fall, a rebuild needs suspended slabs and substantial retaining. I get a real geotech so the deep rock, fall and retaining are all costed properly — on a Spit block, that is the bulk of the substructure budget.

Heritage Conservation Areas cover most older streets, so a rebuild generally goes down the DA path. The pre-war stock can carry asbestos and lead paint, so a licensed strip-out leads the demolition.

Knockdown-rebuild builder in The Spit — key facts

Suburb
The Spit, NSW 2088
Council / LGA
Mosman Council (Mosman)
Primary zoning
R2 Low Density
Typical lot size
600–1,500m²
Soil class
M
Home era
1900s–1950s heritage
Typical price range
To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Cost Guide

ItemEstimated Range
Demolish 1900s–1950s heritage fibro → new double storey (build only)$735k–$1.27M + GST
Demolish brick veneer → new single storey (build only)$565k–$980k + GST
Demolition of the existing homeDepends on house size, construction and asbestos
Asbestos removal (if present)Depends on the type and quantity found
Service disconnections & reinstatementDepends on the services connected to the site

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

How It Works

From First Call to Final Key

Free site inspection of your The Spit property. We check lot dimensions, Mosman Council's planning controls, existing home condition, and potential asbestos.

⏱

KDR is the chance to get the design right — the new build doesn't have to mimic the original layout. We start from your block's strengths (orientation, slope, views) and your family's brief, then design the home the original lot always deserved.

⏱

Licensed demolition of existing 1900s–1950s heritage-era dwelling. Asbestos removal by certified contractors (if present).

⏱

Your new home goes up on the cleared site. Engineered slab sized for Class M soil, frame, roof, fit-out, kitchen, bathrooms, flooring, painting, driveway, and landscaping.

⏱

Handover pack: OC, structural certificates, BASIX, appliance manuals and warranties, paint colour schedule, maintenance plan, and the keys. Statutory warranty periods are measured from completion, not simply the OC date — keep the documentation safe for any future sale.

⏱
Demolition pre-approved to run alongside DA/CDC lodgement for the rebuild
Site cleared in one mobilisation, with one crew
Mosman Council CDC pathway where the design complies with the Codes SEPP — a CDC must be decided within 20 days where neighbours are notified (10 days otherwise)
DA pathway if the envelope sits outside the Codes SEPP, flagged up-front — a DA has a 40-day assessment period
Construction programmed slab-to-keys — for context, the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Demolition and rebuild sequenced so trades arrive without idle waiting

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Book a The Spit Knockdown Rebuild Assessment

Free KDR site assessment for The Spit 2088. We'll assess your block and talk through demolition, approvals and the build.