Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

House Demolition & Knockdown Rebuild Westleigh

Demolition and a new home in Westleigh 2120, approved together and built under one contract. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Knockdown rebuild in Westleigh. To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs. Hornsby Shire Council approval by CDC or DA.

Westleigh Knockdown Rebuilds

A knockdown rebuild in Westleigh is a bushland-fringe family play — 1970s to 1990s brick on generous 700 to 1,200m² R2 blocks backing Berowra Valley National Park. The aging stock and generous blocks suit a substantial modern rebuild, with bushfire designed in.

BAL-12.5 to BAL-29 is typical on the bush-fringe lots, so the RFS assessment shapes those designs. The Hawkesbury Sandstone bedrock means rock excavation, priced from a geotech bore.

The older 1970s homes can carry asbestos, so a licensed strip-out leads the demolition where needed.

We rebuild under NSW contractor licence 487805C. Get our feasibility, with the bushfire and rock costed, before you commit.

Buildana manages the complete knockdown rebuild process in Westleigh — from site assessment and architectural design through to DA or CDC approval, demolition management, and fixed-price construction to handover. One builder, one contract, one new home.

Read our KDR Cost Guide 2026 or use the Renovation vs KDR Calculator to compare options.

  • New home designed for your Westleigh block
  • Hornsby Shire Council DA and CDC approvals managed
  • Demolition and asbestos removal included
  • Hawkesbury Sandstone bedrock — engineered slab design included
  • Typical blocks 700–1,200m² in Westleigh
  • Single and two-storey designs available
  • Statutory home warranties
  • Free site assessment — near Thornleigh (2 km) station
Knockdown-rebuild project by Buildana in Westleigh 2120
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

Room to build on the bush edge

Westleigh's 700 to 1,200m² blocks backing Berowra Valley National Park give a rebuild genuine room, and the aging 1970s-90s brick is well into rebuild territory. A substantial modern family home fits comfortably.

On the bush-fringe lots, BAL-12.5 to BAL-29 shapes the design from the RFS assessment — designed in from the start.

Rock and era demolition

The sandstone bedrock means rock excavation, priced from a geotech bore. The older 1970s homes can carry asbestos, so a licensed strip-out leads the demolition where needed.

Both are in the feasibility and the fixed price.

Knockdown-rebuild builder in Westleigh — key facts

Suburb
Westleigh, NSW 2120
Council / LGA
Hornsby Shire Council (Hornsby Shire)
Primary zoning
R2 Low Density predominant
Typical lot size
700–1,200m²
Soil class
Hawkesbury Sandstone bedrock
Home era
1900s–1940s Federation heritage
Typical price range
To build the new house: single storey $565k–$980k + GST, double storey $735k–$1.27M + GST, before demolition and site costs
Approval and build time
Approval: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Build: the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Approval pathway
CDC where eligible or DA for complex sites

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Demolition pre-approved to run alongside DA/CDC lodgement for the rebuild
Site cleared in one mobilisation, with one crew
Hornsby Shire Council CDC pathway where the design complies with the Codes SEPP — a CDC must be decided within 20 days where neighbours are notified (10 days otherwise)
DA pathway if the envelope sits outside the Codes SEPP, flagged up-front — a DA has a 40-day assessment period
Construction programmed slab-to-keys — for context, the ABS average build for a new NSW house was 2.99 quarters in 2025-26
Demolition and rebuild sequenced so trades arrive without idle waiting

How It Works

From First Call to Final Key

Free site inspection of your Westleigh property. We check lot dimensions, Hornsby Shire Council's planning controls, existing home condition, and potential asbestos. Written assessment with budget estimate to follow.

⏱

KDR is the chance to get the design right — the new build doesn't have to mimic the original layout. We start from your block's strengths (orientation, slope, views) and your family's brief, then design the home the original lot always deserved.

⏱

Licensed demolition of existing 1900s–1940s Federation heritage (Beecroft/Cheltenham/Pennant Hills/Wahroonga boundary) + 1960s–1990s brick (Cherrybrook/Asquith/Mount Colah/Mount Kuring-gai) + 2010s+ R3/R4 redevelopment around Hornsby/Asquith/Waitara stations-era dwelling. Asbestos removal by certified contractors (if present). Site cleared, levelled, and ready for new slab.

⏱

Your new home goes up on the cleared site. Engineered slab sized for Class Hawkesbury Sandstone bedrock soil, frame, roof, fit-out, kitchen, bathrooms, flooring, painting, driveway, and landscaping. Quality inspections at every stage.

⏱

Handover pack: OC, structural certificates, BASIX, appliance manuals and warranties, paint colour schedule, maintenance plan, and the keys. Statutory warranty periods are measured from completion, not simply the OC date — keep the documentation safe for any future sale.

⏱

Quality Promise

Our Westleigh knockdown rebuilds sequence demolition, slab, frame, lockup, handover. Fixed price locked before demolition starts.

Fixed-price contract once the design and scope are setNCC 2025 and BASIX compliantFull Hornsby Shire Council complianceLicensed demolition and asbestos removalWeekly progress updatesStatutory home warranties

Cost Guide

ItemEstimated Range
Build rate (Rawlinsons Sydney, brick veneer, medium to high finish)$2,820–$4,250/m² + GST
Single storey or double storey KDR (build only)single storey $565k–$980k + GST, double storey $735k–$1.27M + GST
Architectural KDRPriced per design and specification
Luxury KDR (high-spec finishes)Priced on your selections

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Demolish and Rebuild in Westleigh

Free KDR site assessment for Westleigh 2120. We'll assess your block and talk through demolition, approvals and the build.

Start Your Project