Skip to content

We’re here to make it feel like home

Custom home alfresco and landscaping
Wentworth Point 2127 · Parramatta

Wentworth Point Home Builder — Custom Homes, KDR, Duplex

Licensed NSW builder (HBL 487805C) · Fixed-price contracts · Parramatta DA + CDC managed in-house

Wentworth Point is the master-planned waterfront residential precinct on the former Homebush Bay industrial site — R4 high-rise apartment towers built 2010s onwards on 300–500m² strata blocks. No detached stock. Wianamatta Shale and reclaimed alluvial soil. Heavy industrial-legacy contamination management on remediated parcels. Bennelong Bridge and ferry to the CBD.

City of Parramatta Council controls planning across Wentworth Point, with R2 Low / R3 Medium (station precincts) / R4 High (Parramatta CBD, Westmead, Harris Park, Wentworth Point, Sydney Olympic Park, Telopea, Epping town centre) as the dominant zone and a duplex minimum of 600m² (R2) under Parramatta DCP 2023 where dual occupancy applies. Soil sits at M (Wianamatta Shale predominant) / Class P/E (alluvial Parramatta River corridor: Rydalmere, Ermington, Sydney Olympic Park, Wentworth Point) / industrial-legacy contamination overlays on Camellia, Rosehill, Silverwater fringe and Sydney Olympic Park, and most homes here date from 2010s+ apartment towers — so demolition, slab and structural assumptions all need to be set against that, not a generic Sydney average.

Council

City of Parramatta

Median price

$750K–$1.5M

Build cost (mid-spec)

$2,000–$3,000/m²

Typical lot

N/A

Soil class

M

DA timing

11–15 wks

Builder perspective

Building in Wentworth Point — what we actually look at first

When clients ring about a Wentworth Point build, the first half-hour is always spent on the same set of variables: the existing structure, the M (Wianamatta Shale predominant) / Class P/E (alluvial Parramatta River corridor: Rydalmere, Ermington, Sydney Olympic Park, Wentworth Point) / industrial-legacy contamination overlays on Camellia, Rosehill, Silverwater fringe and Sydney Olympic Park soil, the R2 Low / R3 Medium (station precincts) / R4 High (Parramatta CBD, Westmead, Harris Park, Wentworth Point, Sydney Olympic Park, Telopea, Epping town centre) planning frame and Parramatta Council, Sydney's second CBD and a major growth-and-renewal authority. City of Parramatta Council runs the planning, and 11–15 weeks for a single-dwelling da where the lot is outside a strategic centre — fast for routine matters, slower when referrals land. Where the lot sits in R3, attached duplex is the next conversation if the lot can support the dual-occupancy minimum of 600m² (R2) under Parramatta DCP 2023. Geotech-first costing is non-negotiable on M (Wianamatta Shale predominant) / Class P/E (alluvial Parramatta River corridor: Rydalmere, Ermington, Sydney Olympic Park, Wentworth Point) / industrial-legacy contamination overlays on Camellia, Rosehill, Silverwater fringe and Sydney Olympic Park soil — the difference between a waffle pod and a piered raft is roughly twenty to forty thousand dollars, and that's not a number you guess. Buildana is a licensed NSW builder (HBL 487805C) based in Fairfield — we build through the western, southern and northern Sydney basins on fixed-price contracts. Wentworth Point sits inside our active service area. If you're sitting on a Wentworth Point block — or about to buy one — we'll walk you through what's realistic on it, what isn't, and what it actually costs to build the version that is.

Wentworth Point build context

The data we use to feasibility-check a Wentworth Point lot before quoting.

Council
City of Parramatta
Postcode
2127
Primary zoning
R2 Low / R3 Medium (station precincts) / R4 High (Parramatta CBD, Westmead, Harris Park, Wentworth Point, Sydney Olympic Park, Telopea, Epping town centre)
Typical lot size
N/A (apartment-led precinct)
Predominant home era
2010s+ apartment towers
Soil class (AS 2870)
M (Wianamatta Shale predominant) / Class P/E (alluvial Parramatta River corridor: Rydalmere, Ermington, Sydney Olympic Park, Wentworth Point) / industrial-legacy contamination overlays on Camellia, Rosehill, Silverwater fringe and Sydney Olympic Park
Duplex minimum lot
600m² (R2) under Parramatta DCP 2023
Median price band
$750K–$1.5M (apartments)
Granny flat rental
$520–$750/week (Westmead Health Precinct demand drives premium)
Train station
Olympic Park (T7, 1.5 km) / ferry to Circular Quay
Build cost (mid-spec)
$2,000–$3,000/m² (Rawlinsons 2026)

Why owners build with Buildana in Wentworth Point

Same six facts on every contract — we just write them down so you can hold us to them.

  • Fully licensed (HBL 487805C) and insured — fixed-price scope from contract through to handover with HBCF cover.
  • City of Parramatta approval pathway managed end-to-end — CDC where compliant, full DA where the merit pathway is the right call.
  • Structural, BASIX and RFS work coordinated by our team — no juggling separate consultants.
  • Fibro and old-stock asbestos handled by SafeWork-licensed crews — priced upfront, not back-charged later.
  • Fixed-price HIA contract — every inclusion itemised, every PC sum justified, no "see clause 17" mid-build surprises.
  • Anchored on the amanah principle — the scope on contract day is the scope at handover. Local landmark: Wentworth Point Marina + Bennelong Bridge. Train: Olympic Park (T7, 1.5 km) / ferry to Circular Quay.

Wentworth Point build economics

Indicative cost ranges for a Buildana build in Wentworth Point, benchmarked against the Rawlinsons Australian Construction Handbook 2026 Sydney baseline and adjusted for the local cost profile (Wentworth Point sits above the Sydney median by 5%). Every figure is a starting point — a real feasibility shifts it by site condition, brief and finish spec.

Build typeIndicative rangeSpec assumptions
Single-storey custom home (200m² GFA, mid-spec)$2,000–$3,000/m² × 200m²Brick veneer, ColorBond roof, mid-tier joinery and finishes — Rawlinsons 2026 Sydney medium-spec baseline.
Double-storey custom home (300m² GFA, mid-spec)$3,000–$3,000/m² × 300m²Two-storey brick veneer, light-frame upper, ColorBond or tile, mid-spec finishes — first-floor adds engineering and access loadings.
Premium custom home (350m²+, full-brick or rendered)$3,000–$5,000/m² × 350m²+Full-brick or rendered structure, hardwood or stone external, custom joinery throughout — Rawlinsons high-spec baseline.
Detached duplex (combined 350m² GFA)$3,000–$3,000/m² combinedTwin-slab on separate footings or party-wall slab; independent services; BCA Vol 2 acoustic separation.
Knockdown rebuild (200m², mid-spec, includes demo)$2,000–$3,000/m² × 200m² + $0–$0K demoDemolition (incl. SafeWork-licensed asbestos clearance), geotech, slab, frame, full mid-spec finish.
Granny flat (60m², Class 1a)$190,000–$280,000 turnkeyClass 1a secondary dwelling, full kitchen + bathroom, BASIX-compliant, SEPP-pathway CDC where lot qualifies.

Source: Rawlinsons Australian Construction Handbook 2026 (Sydney section), adjusted for Wentworth Point cost profile via Buildana's internal suburb cost-adjustment matrix. Figures exclude land, professional fees, council contributions and FF&E.

Buildana services in Wentworth Point

All six core services delivered across the Parramatta — each one priced against Wentworth Point's specific site context, not a generic Sydney baseline.

Knockdown Rebuild

We tear down, dig the right footings for the soil profile, then rebuild — same crew the whole way through.

Wentworth Point knockdown rebuild approach

Duplex

Detached duplex on the lots that allow it — twin homes, independent driveways, independent BASIX, often Torrens-title at completion.

Wentworth Point duplex approach

Granny Flat

Secondary dwellings under SEPP — 60m², usually CDC, often no neighbour notification needed.

Wentworth Point granny flat approach

Custom Home

Design and construct under one fixed-price contract — the architect and the builder are on the same team from concept.

Wentworth Point custom home approach

Extension

Extensions that look like the home grew that way — not a clear before/after line at the addition boundary.

Wentworth Point extension approach

Renovation

Renovation done by a licensed builder, not a generalist — structural changes, waterproofing and finishes all in one contract.

Wentworth Point renovation approach

Approval pathway in Wentworth Point

Parramatta Council, Sydney's second CBD and a major growth-and-renewal authority.

City of Parramatta Council runs the local planning controls for Wentworth Point — DCP setbacks, character provisions, heritage overlays where they apply. For a standard knockdown rebuild on R2 Low / R3 Medium (station precincts) / R4 High (Parramatta CBD, Westmead, Harris Park, Wentworth Point, Sydney Olympic Park, Telopea, Epping town centre), the CDC pathway through a private certifier usually clears in 15–25 working days on code-compliant rebuilds if the design hits every code requirement. For duplex on 600m² (R2) under Parramatta DCP 2023+ lots or attached dual occupancy on R3 land, a DA is almost always required and 11–15 weeks for a single-dwelling da where the lot is outside a strategic centre. Granny flats under SEPP (Affordable Rental Housing) are CDC on most compliant secondary-dwelling lots — 60m² cap, no neighbour notification.

CDC pathway

Private certifier · 15–25 working days on code-compliant rebuilds · no neighbour notification. Design must comply exactly with the Codes SEPP.

DA pathway

City of Parramatta merit assessment · 11–15 weeks for a single-dwelling DA where the lot is outside a Strategic Centre · DA fees $2,000–$3,500 base for a Class 1a residential DA. Used where the design pushes a code limit.

Section 7.11 / 7.12 developer contributions in Wentworth Point: Apply across most precincts — typical $8K–$25K per dwelling outside Strategic Centres.

Wentworth Point site considerations

On M (Wianamatta Shale predominant) / Class P/E (alluvial Parramatta River corridor: Rydalmere, Ermington, Sydney Olympic Park, Wentworth Point) / industrial-legacy contamination overlays on Camellia, Rosehill, Silverwater fringe and Sydney Olympic Park soil — typical for Wentworth Point — the slab system is one of three: waffle pod (cheapest, only on lower reactivity), stiffened raft (mid-range, most common), or piered slab into bedrock (highest cost, where reactivity is extreme or bedrock is shallow). The geotech report tells us which, and we price the contract against that report — not against the cheapest option we hope we can get away with.

Soil & footings

Class M (Wianamatta Shale predominant) / Class P/E (alluvial Parramatta River corridor: Rydalmere, Ermington, Sydney Olympic Park, Wentworth Point) / industrial-legacy contamination overlays on Camellia, Rosehill, Silverwater fringe and Sydney Olympic Park reactivity drives waffle-pod, stiffened raft or piered slab — engineered to a real geotech, not a desktop guess.

Demolition

Pre-1990 2010s+ apartment towers stock means SafeWork-licensed asbestos clearance — priced into the contract upfront, with the clearance certificate before slab pour.

Flood & bushfire

Flood risk: moderate. Bushfire risk: very low. Heritage exposure: moderate. We map your lot against each before quoting.

Local overlays the City of Parramatta planner will check first

  • Parramatta River flood planning
  • Toongabbie Creek + Darling Mills Creek flood overlays
  • Heritage (Parramatta CBD edges, Granville, Harris Park)
  • Acid sulfate soils on river flats
City of Parramatta note: The 2024 LEP harmonisation consolidated controls from the pre-merger Parramatta, Holroyd and Hornsby fragments — older planning advice may reference repealed provisions.
City of Parramatta note: Parramatta CBD and Strategic Centres operate under separate built-form controls.
City of Parramatta note: Heritage Conservation Areas in Harris Park, Parramatta CBD edges and parts of Granville trigger Council Heritage Advisor referral.

Recent builds nearby

Buildana projects in the Parramatta

We work continuously across Parramatta — single-storey customs, double-storey rebuilds, side-by-side duplex on R2 lots that comply with City of Parramatta's DCP minimum frontage, granny flats on SEPP secondary-dwelling pathways. Most projects start with the same conversation we'd have about your Wentworth Point site: title, zone, slope, frontage, soil. Then design. Then fixed-price contract.

Wentworth Point build FAQs

The questions we get asked most often on a first Wentworth Point site walk.

What soil class is typical in Wentworth Point 2127?
Wentworth Point sits in the M (Wianamatta Shale predominant) / Class P/E (alluvial Parramatta River corridor: Rydalmere, Ermington, Sydney Olympic Park, Wentworth Point) / industrial-legacy contamination overlays on Camellia, Rosehill, Silverwater fringe and Sydney Olympic Park reactivity range based on AS 2870 site classifications we've worked with in the suburb. That drives slab design — generally waffle-pod or stiffened raft. We never assume the class; every Buildana build commissions a geotechnical investigation before slab engineering. The geotech report is yours to keep, regardless of which builder you use after.
What does it cost to knock down and rebuild in Wentworth Point?
End values in Wentworth Point sit in the $750K–$1.5M (apartments) range based on recent sales. A typical knockdown rebuild — demo, asbestos clearance, geotech, slab, frame, full mid-spec finish for a 200m² single-storey — runs $2,000–$3,000/m² × 200m² + $0–$0k demo as a Rawlinsons-aligned 2026 baseline. We benchmark every line to the Rawlinsons Australian Construction Handbook, not back-of-envelope figures. Send through your block address and we'll run a proper feasibility against what's actually achievable on the lot.
Do you do extensions and renovations in Wentworth Point?
Yes — ground-floor additions, second-storey adds, full-house renovations, kitchens and bathrooms in Wentworth Point. The complication on 2010s+ apartment towers housing stock is that you can't price an extension off the plans alone — we pre-investigate the existing slab, frame, roof tie-in and wet-area waterproofing before quoting. Surprises during demolition are the most common reason renos blow their budget; we eliminate that by inspecting first.
How long does a DA take with City of Parramatta Council?
11–15 weeks for a single-dwelling DA where the lot is outside a Strategic Centre. CDC through a private certifier is the alternative where the design complies with the Codes SEPP — 15–25 working days on code-compliant rebuilds. Council DA application fees fall in the $2,000–$3,500 base for a class 1a residential da range. Buildana lodges either pathway and runs all RFI responses through to determination.
Why does Wentworth Point cost different from a generic Sydney average?
Wentworth Point sits very close to the Sydney metropolitan median build cost, with small adjustments for local site access and trade availability.
How long does a custom home build take in Wentworth Point?
From contract signed to handover, a single-storey 4-bedroom custom home in Wentworth Point typically takes 9–11 months on a CDC pathway, or 12–14 months if the design needs a DA through City of Parramatta Council. Add 4–6 weeks for double-storey. Pre-construction (design, engineering, BASIX, approval, contract) runs in parallel and adds another 8–16 weeks before site start. Buildana sequences both phases so the design effort and the approval effort don't sit waiting on each other.
Can I build a duplex in Wentworth Point?
Duplex feasibility in Wentworth Point depends on lot size and zoning. The minimum lot for dual occupancy under City of Parramatta Council's DCP is 600m² (R2) under Parramatta DCP 2023, and R3 Medium Density lots in the suburb can support attached duplex or townhouse configurations. We run a feasibility check on title, zone, area, frontage and slope before quoting — no point designing what won't approve.
What's the granny flat pathway in Wentworth Point?
Granny flats in Wentworth Point are usually built under State Environmental Planning Policy (Affordable Rental Housing) 2009 — secondary dwellings up to 60m², CDC pathway, no DA required on most compliant R2 Low / R3 Medium (station precincts) / R4 High (Parramatta CBD, Westmead, Harris Park, Wentworth Point, Sydney Olympic Park, Telopea, Epping town centre) lots. Typical rental return is $520–$750/week (Westmead Health Precinct demand drives premium). The block needs minimum 450m², a primary dwelling already on it, and compliance with side/rear setbacks. Where the lot doesn't comply with SEPP, we lodge a DA with City of Parramatta Council.

Nearby Parramatta suburbs we build in

Adjacent Parramatta suburbs covered by the same City of Parramatta approval pathway and a similar site-cost profile.

Ready to talk about your Wentworth Point build?

Free site feasibility, honest cost framing against $2,000–$3,000/m²/m² baseline, fixed-price contract. City of Parramatta pathway managed in-house — no surprise variations.