Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Custom home alfresco and landscaping
Wentworth Point 2127 · Parramatta

Wentworth Point Home Builder — Custom Homes, KDR, Duplex

Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · Parramatta DA and CDC pathways

No detached stock. Wianamatta Shale and reclaimed alluvial soil. Heavy industrial-legacy contamination management on remediated parcels. Bennelong Bridge and ferry to the CBD.

Wentworth Point (2127) is in Parramatta. Before a design or a price, Buildana checks the title, the planning certificate and the site, so the advice fits the lot.

Council

City of Parramatta

Postcode

2127

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

DA assessment period

40 days (statutory)

Duplex minimum lot

600m² (LEP)

Low and Mid-Rise areas

5 nominated

Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.

Builder perspective

Building in Wentworth Point: what gets checked first

Every Wentworth Point feasibility begins with paperwork: the title plan, the planning certificate for the address and, before any slab design, a geotechnical report. Approval runs through City of Parramatta or a certifier: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise), and a DA has a 40-day assessment period. New house versus a large renovation is a cost question: Rawlinsons rates for a new Sydney house run $2,820–$4,250/m² + GST, an addition has its own rates, and the condition of the existing house decides which makes sense. Slope drives retaining walls, drainage and the slab design, which is why a detail survey comes before any design or price. Buildana is a Fairfield-based builder holding NSW contractor licence 487805C, and Oliver Alameri, with 15+ years' building experience, runs every job himself. If you're sitting on a Wentworth Point block, or about to buy one, send the address and Oliver will tell you what's realistic on it and which checks come next.

OA

Oliver Alameri — Founder & licensed builder

Licence 487805C · 15+ years' building experience

Talk to Oliver

Wentworth Point build context

What's known for Wentworth Point, and the document that confirms each lot-specific fact before a price.

Council

City of Parramatta

Postcode

2127

Nearest station

Olympic Park (T7, / ferry to Circular Quay

Local landmark

Wentworth Point Marina + Bennelong Bridge

Zoning

Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer

Lot area and frontage

Title plan, or a detail survey

Site classification (AS 2870)

Geotechnical report for the lot

Age of the house

Built before 1990? Asbestos inspection before demolition

Duplex minimum lot

600m² (LEP)

Low and Mid-Rise area

Walking distance to a nominated area, measured for the lot

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Why owners build with Buildana in Wentworth Point

What every Buildana job includes, written down.

  • Licence 487805C, home building compensation cover where the law requires it, and a written contract with an inclusions schedule.
  • City of Parramatta rules are read before design: a CDC where the design meets every code standard, a DA where it needs merit assessment.
  • One point of contact: Oliver sequences the survey, geotechnical report, engineering and BASIX so each informs the next.
  • If the house was built before 1990, an asbestos inspection comes before demolition, and removal is by a SafeWork NSW licensed contractor.
  • Changes to the scope are agreed in writing before the work is done, as NSW home building law requires.
  • Anchored on the amanah principle: keeping the word given. Local landmark: Wentworth Point Marina + Bennelong Bridge. Nearest station: Olympic Park (T7, / ferry to Circular Quay.

Wentworth Point build costs from published rates

Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a Wentworth Point lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.

Build typePublished rateBasis
Custom home, per m²$2,820–$4,250/m² + GSTRawlinsons individual house, brick veneer, medium to high finish.
Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²)single storey $565k–$980k + GST, double storey $735k–$1.27M + GSTAt $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra.
Duplex, attached four-bedroom pair$1.4M–$1.7M + GSTBoth dwellings, before site costs and subdivision.
Ground-floor addition, per m²$2,360–$2,840/m² + GSTRawlinsons ground floor addition, framed to brick veneer.
First-floor addition, per m²$3,790–$4,230/m² + GSTRawlinsons full first floor addition.
New bathroom in an addition$34k–$38k + GSTRawlinsons bathroom fit-out and services, each.
New kitchen in an addition$28k–$32k + GSTRawlinsons kitchen fit-out and services, each.
Granny flatFrom the catalogue price of the design you choose, plus site costsCatalogue designs carry their own published price.

Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.

Free Wentworth Point feasibility

Thinking about building in Wentworth Point? Start with the lot, not a sales pitch.

Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.

Written contract with an inclusions schedule Licence 487805C City of Parramatta DA and CDC pathways explained

Buildana services in Wentworth Point

Six services across Parramatta, each priced for the lot once plans, engineering and site checks are done.

Knockdown Rebuild

The new house is costed from published Rawlinsons rates; demolition and site costs are confirmed for the lot before the contract.

Wentworth Point knockdown rebuild approach

Duplex

Two homes on one lot with separate services, fire separation and sound insulation designed to the National Construction Code.

Wentworth Point duplex approach

Granny Flat

A granny flat built as a proper home: its own kitchen, bathroom, BASIX certificate and statutory warranty.

Wentworth Point granny flat approach

Custom Home

Architect-led design sized to the block, the streetscape and the brief, not a catalogue plan.

Wentworth Point custom home approach

Extension

Extensions that tie into the existing roof line, brickwork and slab so the addition reads as part of the house.

Wentworth Point extension approach

Renovation

Structural changes, waterproofing and finishes in one contract with a licensed builder.

Wentworth Point renovation approach

Approval pathway in Wentworth Point

Council: City of Parramatta.

The approval question on a Wentworth Point build is whether the design complies with every clause of the Codes SEPP, or needs merit assessment by City of Parramatta. Complying development: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). Development application: a DA has a 40-day assessment period. Application fees are in City of Parramatta's fees and charges, and contributions depend on its contributions plans.

CDC pathway

Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.

DA pathway

City of Parramatta merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.

Local duplex minimum

As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).

Low and Mid-Rise areas in Parramatta

Epping station and town centre, Carlingford Court shopping centre, Northmead Village shopping centre, Westmead station, Winston Hills Mall shopping centre. Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Council rules compared

Granny flats

Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to City of Parramatta as a DA.

Wentworth Point site considerations

Site costs in Wentworth Point come from the lot, not the suburb. The footings depend on the site classification, which a geotechnical engineer sets under AS 2870 and the structural engineer designs to. Demolition depends on the existing house: if it was built before 1990, a licensed asbestos assessor confirms what's there before a licensed removalist takes it out.

Soil & footings

A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.

Demolition & asbestos

A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.

Flood, bushfire & heritage

These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.

What to check for a Wentworth Point lot, and where

Wentworth Point build FAQs

The questions that come up most often on a first Wentworth Point site walk.

What soil class is typical in Wentworth Point?
There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
What does it cost to knock down and rebuild in Wentworth Point?
For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
Do you do extensions and renovations in Wentworth Point?
Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.
How long does a DA take with City of Parramatta?
NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through City of Parramatta or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in City of Parramatta's fees and charges.
What decides the site costs on a Wentworth Point block?
The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by City of Parramatta's tree controls and an arborist, stormwater by City of Parramatta's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
How long does a custom home build take in Wentworth Point?
The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a Wentworth Point timeline is set once the design and the approval pathway are known.
Can I build a duplex in Wentworth Point?
Parramatta LEP 2023, cl 4.1C (Zones R2, R3 and R4): at least 600m² and 15m of frontage. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
What's the granny flat pathway in Wentworth Point?
Secondary dwellings in Wentworth Point are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with City of Parramatta. The title, overlays and current controls are checked with the certifier or City of Parramatta before design.

Nearby Parramatta suburbs we build in

Other Parramatta suburbs, assessed by the same council: City of Parramatta.

Ready to talk about your Wentworth Point build?

Oliver will respond within 4 working hours for a free initial conversation about your Wentworth Point site, the City of Parramatta pathway and what it could cost to build.