Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Hamptons-inspired custom home
Old Toongabbie 2146 · Parramatta

Old Toongabbie Home Builder — Custom Homes, KDR, Duplex

Licensed NSW builder (licence 487805C) · Written contracts with an inclusions schedule · Parramatta DA and CDC pathways

Wianamatta Shale soil. Quiet residential. Strong KDR and duplex market on the larger blocks. Bus connections to Parramatta.

Old Toongabbie shares City of Parramatta's planning controls with Toongabbie and Winston Hills. What changes from lot to lot is zoning, area, frontage, slope and soil, and each is checked on paper before design.

Council

City of Parramatta

Postcode

2146

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

DA assessment period

40 days (statutory)

Duplex minimum lot

600m² (LEP)

Low and Mid-Rise areas

5 nominated

Build rate: Rawlinsons individual house, brick veneer, medium to high finish, Sydney, excluding GST, escalated to the ABS September 2026 index.

Builder perspective

Building in Old Toongabbie: what gets checked first

The honest answer to "what does it cost to build in Old Toongabbie?" starts with the lot: its area and frontage from the title, its zoning from the planning certificate, and its site classification from a geotechnical report. City of Parramatta assesses a development application on its merits, and a DA has a 40-day assessment period; a design that meets every code standard can go the complying development route instead. For a duplex, Parramatta LEP 2023, cl 4.1C (Zones R2, R3 and R4): at least 600m² and 15m of frontage. If the existing house was built before 1990 it may contain asbestos; a licensed assessor confirms what's there, and a licensed removalist takes it out before demolition. Buildana's price comes after the plans, engineering and site checks, as a written contract with an inclusions schedule, so the number reflects the actual lot. Send through a Old Toongabbie address and Oliver will read the title, zoning and planning certificate before any design conversation starts.

OA

Oliver Alameri — Founder & licensed builder

Licence 487805C · 15+ years' building experience

Talk to Oliver

Old Toongabbie build context

What's known for Old Toongabbie, and the document that confirms each lot-specific fact before a price.

Council

City of Parramatta

Postcode

2146

Nearest station

Toongabbie (T1, / bus to Parramatta

Local landmark

Old Toongabbie Public School

Zoning

Planning certificate (section 10.7) for the address, or the NSW Planning Portal Spatial Viewer

Lot area and frontage

Title plan, or a detail survey

Site classification (AS 2870)

Geotechnical report for the lot

Age of the house

Built before 1990? Asbestos inspection before demolition

Duplex minimum lot

600m² (LEP)

Low and Mid-Rise area

Walking distance to a nominated area, measured for the lot

Build rate (Rawlinsons)

$2,820–$4,250/m² + GST

Why owners build with Buildana in Old Toongabbie

What every Buildana job includes, written down.

  • Licence 487805C, home building compensation cover where the law requires it, and a written contract with an inclusions schedule.
  • City of Parramatta rules are read before design: a CDC where the design meets every code standard, a DA where it needs merit assessment.
  • Oliver coordinates the surveyor, geotechnical and structural engineers, BASIX assessor and certifier, so the documents arrive in the right order.
  • Asbestos is identified before demolition, not discovered during it: pre-1990 houses are inspected and licensed removalists do the work.
  • Build rates come from the Rawlinsons construction handbook, escalated with the ABS house construction price index, not a guess.
  • Anchored on the amanah principle: keeping the word given. Local landmark: Old Toongabbie Public School. Nearest station: Toongabbie (T1, / bus to Parramatta.

Old Toongabbie build costs from published rates

Rawlinsons Australian Construction Handbook rates, Sydney, excluding GST, escalated to the ABS September 2026 index. They are the same across Sydney: what changes for a Old Toongabbie lot is the site cost, covered below, and the design you choose. A written price comes once plans, engineering and site checks are done.

Build typePublished rateBasis
Custom home, per m²$2,820–$4,250/m² + GSTRawlinsons individual house, brick veneer, medium to high finish.
Knockdown rebuild, new house only (single storey 200–230m², double storey 260–300m²)single storey $565k–$980k + GST, double storey $735k–$1.27M + GSTAt $2,820–$4,250/m²; demolition, asbestos removal and site costs are extra.
Duplex, attached four-bedroom pair$1.4M–$1.7M + GSTBoth dwellings, before site costs and subdivision.
Ground-floor addition, per m²$2,360–$2,840/m² + GSTRawlinsons ground floor addition, framed to brick veneer.
First-floor addition, per m²$3,790–$4,230/m² + GSTRawlinsons full first floor addition.
New bathroom in an addition$34k–$38k + GSTRawlinsons bathroom fit-out and services, each.
New kitchen in an addition$28k–$32k + GSTRawlinsons kitchen fit-out and services, each.
Granny flatFrom the catalogue price of the design you choose, plus site costsCatalogue designs carry their own published price.

Source: Rawlinsons Australian Construction Handbook, Edition 29, Sydney, escalated from the March 2021 to the September 2026 quarter with the ABS producer price index for NSW house construction (ABS). Floor area to the inner face of external walls. Excludes land, demolition, site costs, professional fees, council contributions and GST.

Free Old Toongabbie feasibility

Thinking about building in Old Toongabbie? Start with the lot, not a sales pitch.

Send your address and a rough brief. Oliver will come back with a straight read on the block: zoning, frontage, approval pathway, the checks it needs and a cost range from published Rawlinsons rates. Oliver will respond within 4 working hours for a free initial conversation. A written price follows once plans, engineering and site checks are done.

Written contract with an inclusions schedule Licence 487805C City of Parramatta DA and CDC pathways explained

Buildana services in Old Toongabbie

Six services across Parramatta, each priced for the lot once plans, engineering and site checks are done.

Knockdown Rebuild

Knockdown rebuild in the right order: asbestos inspection, demolition, geotechnical report, slab design, then the build.

Old Toongabbie knockdown rebuild approach

Duplex

Duplex feasibility starts with zone, area, frontage and slope, read from the title and the planning certificate.

Old Toongabbie duplex approach

Granny Flat

Secondary dwellings under Housing SEPP 2021: complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m².

Old Toongabbie granny flat approach

Custom Home

Custom plans tailored to the land, orientation and budget, priced once the drawings and engineering are done.

Old Toongabbie custom home approach

Extension

A first-floor addition needs the original footings checked by an engineer, and that happens before the design is finalised.

Old Toongabbie extension approach

Renovation

Renovations scoped properly: waterproofing, electrical compliance and smoke alarms to current standards.

Old Toongabbie renovation approach

Approval pathway in Old Toongabbie

Council: City of Parramatta.

City of Parramatta administers local planning controls for Old Toongabbie, including setbacks, character provisions and heritage overlays. A certifier assesses a proposed rebuild or dual occupancy against the Codes SEPP and site exclusions before confirming CDC eligibility. Where complying development is unavailable, a DA may be required. Secondary dwellings are assessed under Housing SEPP 2021 and applicable complying-development standards; lot size and zoning alone do not guarantee approval.

CDC pathway

Council or private certifier. Under the EP&A Regulation, a CDC must be decided within 20 days where neighbours are notified (10 days otherwise). The design must meet every standard of the codes.

DA pathway

City of Parramatta merit assessment. Under the EP&A Regulation, a DA has a 40-day assessment period. Used where the design needs to flex.

Local duplex minimum

As complying development (Low Rise Housing Diversity Code): a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane).

Low and Mid-Rise areas in Parramatta

Epping station and town centre, Carlingford Court shopping centre, Northmead Village shopping centre, Westmead station, Winston Hills Mall shopping centre. Within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies (NSW Planning). Council rules compared

Granny flats

Under Housing SEPP 2021, Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m². Otherwise a granny flat goes to City of Parramatta as a DA.

Old Toongabbie site considerations

The planning certificate for a Old Toongabbie address says whether the lot is flood affected, bush fire prone or in a heritage area. Each brings its own consultant (flood engineer, bush fire assessor, heritage advisor) and its own cost, confirmed before the contract.

Soil & footings

A geotechnical engineer classifies the site under AS 2870; the structural engineer designs a waffle pod, stiffened raft or piered slab to that class.

Demolition & asbestos

A house built before 1990 may contain asbestos. A licensed assessor confirms it, a SafeWork NSW licensed removalist takes it out, and a clearance certificate comes before demolition continues.

Flood, bushfire & heritage

These are mapped lot by lot, not suburb by suburb. The lot's planning certificate and the maps below show whether any apply.

What to check for a Old Toongabbie lot, and where

Old Toongabbie build FAQs

The questions that come up most often on a first Old Toongabbie site walk.

How long does a DA take with City of Parramatta?
NSW law sets the clock: a DA has a 40-day assessment period, and a CDC must be decided within 20 days where neighbours are notified (10 days otherwise) for complying development through City of Parramatta or a private certifier. These are deadlines for a decision, not a promise; requests for more information, referrals and design changes add time. Application fees are in City of Parramatta's fees and charges.
What decides the site costs on a Old Toongabbie block?
The lot does. Soil is confirmed by a geotechnical report, slope by a detail survey, trees by City of Parramatta's tree controls and an arborist, stormwater by City of Parramatta's requirements and an engineer's design, asbestos in a pre-1990 house by a licensed assessor, and connections by Sydney Water and the electricity network. Each is confirmed for the address before the contract, which is why no suburb-wide allowance is given here.
How long does a custom home build take in Old Toongabbie?
The ABS average build for a new NSW house was 2.99 quarters in 2025-26, measured from the start of work to completion; for townhouses and semi-detached homes such as duplexes, the ABS average build for new NSW townhouses and semi-detached homes was 3.45 quarters in 2025-26. Approval comes first: a CDC must be decided within 20 days where neighbours are notified (10 days otherwise); a DA has a 40-day assessment period. Design, engineering and requests for more information add time before either clock runs, so a Old Toongabbie timeline is set once the design and the approval pathway are known.
Can I build a duplex in Old Toongabbie?
Parramatta LEP 2023, cl 4.1C (Zones R2, R3 and R4): at least 600m² and 15m of frontage. As complying development under the Low Rise Housing Diversity Code, a duplex also needs a lot of at least 400m², or the council's local minimum where that is larger, and 15m of width at the building line (12m where parking is reached only from a secondary road, parallel road or lane). Separately, within an 800m walk of a nominated Low and Mid-Rise area, the Housing SEPP standards allow a dual occupancy on a lot of 450m² and 12m wide, unless an exclusion applies. Zoning, exclusions and every other standard still apply, so the title and planning certificate are checked before design.
What's the granny flat pathway in Old Toongabbie?
Secondary dwellings in Old Toongabbie are governed by State Environmental Planning Policy (Housing) 2021. Under its Schedule 1, complying development needs a lot of at least 450m² (with 12m of frontage at the building line on a 450–600m² lot) and a secondary dwelling of no more than 60m², along with setbacks, site coverage and landscaping standards. Smaller or constrained lots need a DA with City of Parramatta. The title, overlays and current controls are checked with the certifier or City of Parramatta before design.
What soil class is typical in Old Toongabbie?
There's no single answer for a suburb. The site classification is set lot by lot by a geotechnical engineer under AS 2870, from boreholes on the lot, and it decides the slab design: waffle pod, stiffened raft or piers. The report is commissioned before the engineering and the price, and it's yours to keep.
What does it cost to knock down and rebuild in Old Toongabbie?
For the new house, Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) give single storey $565k–$980k + GST, double storey $735k–$1.27M + GST. Demolition, asbestos removal and site costs sit on top and depend on the lot, so they're confirmed by inspection, survey and geotechnical report before a written price.
Do you do extensions and renovations in Old Toongabbie?
Yes: ground-floor and first-floor additions, whole-house renovations, kitchens and bathrooms. Rawlinsons rates (Sydney, excluding GST, escalated to the ABS September 2026 index) are $2,360–$2,840/m² + GST for a ground-floor addition and $3,790–$4,230/m² + GST for a first-floor addition. The existing slab, frame and roof are checked before a price is written, because what's there decides what the addition needs.

Ready to talk about your Old Toongabbie build?

Oliver will respond within 4 working hours for a free initial conversation about your Old Toongabbie site, the City of Parramatta pathway and what it could cost to build.