Skip to content

We value your privacy

We use analytics cookies to understand how you interact with our website, helping us improve your experience. No personal data is shared with third parties. Privacy Policy

We’re here to make it feel like home

Buildana construction project in Western Sydney

Bathroom, Kitchen & Home Renovations Clontarf

Renovations in Clontarf 2093. Rawlinsons Sydney benchmarks: new bathroom $37k–$42k inc GST, new kitchen $31k–$35k inc GST; strip-out and existing services move it from there.

Based in Fairfield, Western Sydney5.0 Google RatingLicensed & Insured (LIC 487805C)HIA Member — Buildana Custom Home Builders SydneyHIA MemberMaster Builders Association NSW Member — BuildanaMBA NSW0476 300 300
?

Quick Answer

Home renovation build costs in Clontarf: New bathroom $37k–$42k inc GST; new kitchen $31k–$35k inc GST (Rawlinsons Sydney). Internal kitchen and bathroom work often needs no approval; structural or external changes need a CDC or DA. Buildana manages design, Northern Beaches Council approvals (where required) and construction, with a fixed-price contract once design and scope are set.

Clontarf Home Renovations

A home renovation in Clontarf works the Middle Harbour premium — Federation and inter-war heritage on 600 to 1,500m² blocks falling to the water near the Spit, where the harbour-front market rewards exactness.

The renovation conserves the heritage the HCA streets protect and opens the home to the harbour — levels engineered down the fall, deep rock priced from the geotech, and the Foreshore Building Line mapped on the waterfront.

Lead paint and asbestos in the pre-war fabric run as licensed processes.

We renovate under NSW contractor licence 487805C. Get our renovation scope, with rock, fall and foreshore resolved, before you commit.

Buildana manages the complete home renovation process in Clontarf — from initial consultation and design through to approvals (where required) and construction to handover, with a fixed-price contract once design and scope are set. Your home, modernised.

Not sure whether to renovate or rebuild? Use our Renovation vs KDR Calculator or read the renovation vs knockdown rebuild comparison.

  • Rawlinsons Sydney rates: new bathroom $37k–$42k inc GST, new kitchen $31k–$35k inc GST
  • Northern Beaches Council approvals managed (where required)
  • Kitchen, bathroom, and full-home renovations
  • 1900s–1940s heritage + premium contemporary-era homes — renovation specialists
  • Asbestos assessment and licensed removal managed
  • Waterproofing by licensed contractors, as NSW requires
  • No engineered stone benchtops — banned in Australia since 1 July 2024
  • Staged renovation plans to minimise disruption
  • 6-year structural warranty on structural work
  • Free consultation — near B-Line bus to CBD via Mosman station
Structural renovation in Clontarf — R2 Low block
OA

Reviewed by Oliver Alameri

Licensed Builder (NSW 487805C) · Master of Property Development · PhD Student · Building for over 15 years

The harbour-front standard

Clontarf's Middle Harbour frontage carries one of the peninsula's strongest premiums, and the renovation meets it — conserved Federation fabric, interiors rebuilt beautifully, and living reoriented down the engineered fall to the water.

The 600 to 1,500m² blocks give the redesigns generous room.

Rock, fall and foreshore

Deep rock excavation is typical where structure changes — priced from the geotech — with the fall engineered early and the Foreshore Building Line mapped on the waterfront lots.

All in the scope before you commit.

Home renovation builder in Clontarf — key facts

Suburb
Clontarf, NSW 2093
Council / LGA
Northern Beaches Council (Northern Beaches)
Primary zoning
R2 Low
Typical lot size
600–1,500m²
Soil class
Hawkesbury Sandstone
Home era
1900s–1940s heritage + premium contemporary
Typical price range
New bathroom $37k–$42k inc GST; new kitchen $31k–$35k inc GST (Rawlinsons Sydney)
Approval and build time
Internal kitchen and bathroom work often needs no approval; structural or external changes need a CDC or DA
Approval pathway
Exempt development for cosmetic, CDC/DA for structural

Want a real number for YOUR block — not a generic estimate?

Send your block and brief. We'll reply within 4 working hours to discuss the site assessment and next steps. No high-pressure sales.

Scope lock-in at design stage — the biggest timeline risk isn't trades, it's client indecision
Northern Beaches Council CDC only where required — most cosmetic work doesn't need approval
DA only for structural change or heritage-affected homes
Trades sequenced to avoid idle crews and rework — pace is programmed, not hopeful

How It Works

From First Call to Final Key

We bring our trade leads (electrical, plumbing, structural) on the first visit when scope warrants it. They check what's behind the walls and the floor, which is where the real cost variation sits.

⏱

We design the renovation around how you use your home — kitchen layout, bathroom placement, storage, lighting, and flow between rooms. Material and colour selections with our design consultant.

⏱

The approval-or-not question hinges on whether walls move, openings change in external walls, wet areas relocate, or load-bearing structure is altered. Buildana checks the scope against Northern Beaches Council's exempt and complying development tests on day one — no late-stage approval surprises.

⏱

Renovation works completed room by room where possible — kitchen, bathrooms, living areas. Staged approach minimises disruption.

⏱

Renovation complete — final clean, defect inspection, and handover. NSW statutory warranties apply to the work.

⏱

Quality Promise

Our Clontarf home renovations respect what's worth keeping and replace what isn't. Structural assessment first, staged build second.

Fixed-price contract once design and scope are setNCC 2025 compliant (structural work)Northern Beaches Council compliance where requiredAsbestos assessment and licensed removalWeekly progress updates6-year structural warranty (structural work)

Cost Guide

ItemEstimated Range
Pre-sale refreshDepends on areas, finishes and selections
Post-purchase renovation (bringing up to liveable)Depends on the condition of the existing home
Modernising a tired kitchen$31k–$35k inc GST
Modernising a tired bathroom$37k–$42k inc GST
1900s–1940s heritage + premium contemporary home — full liveability upgradePriced on scope and existing structure
Rental-prep renovation (neutral spec)Depends on areas, finishes and selections

Prices are indicative for Western Sydney (2026). Actual costs depend on site, specifications, and approvals.

Who you deal with

OA

Oliver Alameri

Founder and Builder · Master of Property Development · NSW Licence 487805C

Estimate Your Build Cost

Use our free calculator to get an instant cost estimate for your project

Open Calculator →

Still got questions? Talk to Oliver directly.

30-min free call — bring your block, your brief, your budget. We'll map out feasibility, timeline, and realistic cost. No sales pitch.

Frequently Asked Questions

Google Reviews
5.0·26+ verified reviews
Buildana built our granny flat in just 12 weeks. Fast approvals, great communication, and a beautiful final product. Highly recommend.
FA

Fatima Al-Rashid

Liverpool, NSW

Read every review
Areas We Serve

We Build Across Sydney

Headquartered in Western Sydney's Fairfield. Active across all 28 metropolitan Sydney LGAs — from Penrith to the Eastern Suburbs, the Hills to the Sutherland Shire.

Refresh Your Clontarf Home

Free renovation consultation for Clontarf 2093. We'll assess your home and talk through renovation options and any approvals needed, then provide a fixed-price contract once design and scope are set.

Start Your Project